1 WAGE RATES OF CONSTRUCTION WORKERS JULY 2013 (DAILY) / KADAR UPAH PEKERJA BINAAN JULAI 2013 (HARIAN)
SEMENANJUNG
NO.
KEDAH
Maximum
Minimum
RM
RM
PULAU PINANG
Common
July 13
RM
Common
Jan 13
RM
Maximum
Minimum
RM
RM
Common
July 13
RM
Common
Jan 13
RM
1.1.1
90.00
65.00
79.50
78.50
75.00
45.00
59.00
58.00
1.1.2
71.00
45.00
56.17
55.17
65.00
38.00
47.80
47.80
Concretor
2.1.1
98.00
90.00
93.33
92.33
155.00
70.00
99.50
98.00
2.1.2
88.00
64.00
79.50
78.50
125.00
50.00
76.00
74.50
2.2.1
Concretor, Semi-skilled,Local
82.00
63.00
74.00
73.00
105.00
55.00
78.50
77.00
2.2.2
78.00
46.00
65.83
64.83
100.00
40.00
61.00
60.00
Bricklayer
3.1.1
96.00
86.00
91.00
90.00
125.00
70.00
92.50
90.00
3.1.2
Bricklayer,Skilled, Foreign
95.00
72.00
83.00
82.00
100.00
55.00
68.50
67.00
3.2.1
Bricklayer,Semi-skilled, Local
81.00
70.00
77.00
76.00
95.00
45.00
66.60
66.60
3.2.2
75.00
57.00
65.33
64.33
75.00
40.00
50.20
50.20
Plasterer
4.1.1
100.00
86.00
95.00
94.00
120.00
85.00
101.00
98.50
4.1.2
91.00
74.00
84.00
83.00
105.00
70.00
81.50
75.50
4.2.1
85.00
63.00
75.33
74.33
100.00
50.00
69.50
68.50
4.2.2
Plasterer, Semi-skilled,Foreign
76.00
62.00
69.67
68.67
96.00
40.00
53.90
53.10
Tiler
5.1.1
103.00
97.00
99.17
98.17
135.00
80.00
108.50
107.00
5.1.2
94.00
77.00
87.67
86.67
120.00
70.00
87.50
86.00
5.2.1
86.00
75.00
80.67
79.67
105.00
55.00
74.00
72.00
5.2.2
77.00
59.00
69.67
68.67
90.00
45.00
58.50
58.50
Barbender
6.1.1
Barbender, Skilled,Local
97.00
88.00
92.17
91.17
130.00
80.00
98.20
97.20
6.1.2
Barbender,Skilled, Foreign
92.00
65.00
76.67
75.67
98.00
50.00
71.80
70.80
6.2.1
Barbender,Semi-skilled, Local
87.00
62.00
72.00
71.00
85.00
50.00
69.00
68.50
6.2.2
77.00
52.00
61.67
60.67
60.00
40.00
47.40
46.90
Carpenter-Formwork
7.1.1
96.00
92.00
93.83
92.83
120.00
75.00
95.80
94.00
7.1.2
Carpenter-Formwork,Skilled, Foreign
91.00
71.00
81.00
80.00
100.00
55.00
72.50
72.50
7.2.1
90.00
71.00
80.33
79.33
95.00
45.00
71.50
71.50
7.2.2
Carpenter-Formwork, Semi-skilled,Foreign
80.00
68.00
74.17
73.17
80.00
40.00
54.50
54.50
2.1 WAGE RATES OF CONSTRUCTION WORKERS JULY 2013 (DAILY) / KADAR UPAH PEKERJA BINAAN JULAI 2013 (HARIAN)
SEMENANJUNG
NO.
KEDAH
Maximum
Minimum
RM
RM
PULAU PINANG
Common
July 13
RM
Common
Jan 13
RM
Maximum
Minimum
RM
RM
Common
July 13
RM
Common
Jan 13
RM
Carpenter-Joinery
8.1.1
107.00
99.00
102.00
101.00
120.00
75.00
101.00
100.50
8.1.2
Carpenter-Joinery, Skilled,Foreign
97.00
90.00
93.83
92.83
105.00
55.00
79.00
79.00
8.2.1
Carpenter-Joinery,Semi-skilled, Local
94.00
82.00
88.17
87.17
95.00
60.00
75.00
75.00
8.2.2
87.00
71.00
79.50
78.50
80.00
40.00
58.80
58.80
Roofer
9.1.1
105.00
97.00
100.17
99.17
135.00
75.00
100.50
98.50
9.1.2
Roofer,Skilled, Foreign
92.00
86.00
89.17
88.17
105.00
60.00
77.00
76.00
9.2.1
Roofer,Semi-skiiled, Local
87.00
73.00
82.33
81.33
100.00
55.00
70.50
69.50
9.2.2
77.00
66.00
71.33
70.33
80.00
40.00
54.50
54.50
10
122.00
97.00
104.67
103.67
140.00
80.00
101.00
100.00
100.00
92.00
96.67
95.67
110.00
60.00
81.00
80.00
94.00
86.00
89.67
88.67
105.00
55.00
74.00
73.50
85.00
72.00
77.17
76.17
80.00
45.00
55.80
55.80
11
General Welder
101.00
97.00
99.33
98.33
120.00
65.00
86.50
85.00
99.00
87.00
92.33
91.33
90.00
55.00
70.00
68.50
91.00
77.00
85.50
84.50
90.00
50.00
69.00
68.50
86.00
72.00
78.67
77.67
80.00
40.00
51.00
51.00
12
96.00
98.17
97.17
140.00
75.00
99.50
97.50
87.00
75.00
82.17
81.17
130.00
55.00
84.00
83.00
81.00
73.00
77.00
76.00
120.00
55.00
81.00
80.50
78.00
61.00
68.50
67.50
105.00
50.00
67.20
66.00
122.00
102.00
110.17
109.17
135.00
75.00
104.00
101.00
101.00
97.00
98.67
97.67
120.00
60.00
81.50
79.50
98.00
92.00
95.00
94.00
110.00
55.00
79.00
78.00
84.00
74.00
79.33
78.33
90.00
50.00
63.50
62.50
106.00
97.00
100.83
99.83
140.00
70.00
99.50
98.50
100.00
94.00
96.67
95.67
120.00
50.00
71.20
69.40
13
14
Plumber-Reticulation
2.1 WAGE RATES OF CONSTRUCTION WORKERS JULY 2013 (DAILY) / KADAR UPAH PEKERJA BINAAN JULAI 2013 (HARIAN)
SEMENANJUNG
NO.
KEDAH
PULAU PINANG
Common
July 13
RM
Maximum
Minimum
RM
RM
2602.00
2302.00
2470.67
2402.00
1964.00
2179.00
3002.00
2920.00
2702.00
2194.00
15
16
17
Common
Jan 13
RM
Common
July 13
RM
Common
Jan 13
RM
Maximum
Minimum
RM
RM
2469.67
3000.00
1200.00
1935.00
1920.00
2178.00
1700.00
800.00
1340.00
1320.00
2979.83
2978.83
3360.00
1800.00
2641.00
2625.00
2479.00
2478.00
2575.00
1000.00
1728.50
1708.50
Scaffolder - Prefabricated
100.00
85.00
91.33
90.33
155.00
60.00
95.50
93.50
87.00
74.00
81.00
80.00
140.00
45.00
81.00
79.50
82.00
72.00
77.00
76.00
120.00
45.00
69.50
68.50
75.00
68.00
71.33
70.33
105.00
42.00
60.40
60.40
97.00
90.00
93.33
92.33
125.00
70.00
92.00
91.00
91.00
72.00
79.67
78.67
115.00
60.00
81.00
80.00
79.00
69.00
74.00
73.00
105.00
55.00
75.00
72.50
71.00
62.00
66.00
65.00
90.00
35.00
56.00
56.00
91.00
82.00
87.00
86.00
125.00
80.00
99.00
98.50
80.00
70.00
75.00
74.00
105.00
55.00
81.30
79.80
76.00
69.00
72.17
71.17
100.00
50.00
71.50
71.50
66.00
55.00
60.67
59.67
85.00
40.00
57.00
57.00
80.00
69.00
74.50
73.50
70.00
45.00
59.50
59.00
70.00
56.00
63.50
62.50
60.00
35.00
48.00
48.00
18
19
20
Scaffolder - Tubular
Painter - Building
2.1 WAGE RATES OF CONSTRUCTION WORKERS JULY 2013 (DAILY) / KADAR UPAH PEKERJA BINAAN JULAI 2013 (HARIAN)
SEMENANJUNG
NO.
PERAK
Maximum
Minimum
RM
RM
SELANGOR
Common
July 13
RM
Common
Jan 13
RM
Maximum
Minimum
RM
RM
KUALA LUMPUR
Common
July 13
RM
Common
Jan 13
RM
Maximum
Minimum
RM
RM
Common
July 13
RM
Common
Jan 13
RM
1.1.1
75.00
55.00
66.17
65.00
90.00
40.00
64.50
63.00
80.00
50.00
63.00
62.50
1.1.2
55.00
40.00
48.33
46.55
70.00
35.00
53.50
50.00
65.00
40.00
53.00
53.00
Concretor
2.1.1
140.00
95.00
117.50
115.83
130.00
65.00
93.00
92.00
110.00
60.00
89.50
88.00
2.1.2
115.00
60.00
82.50
80.83
90.00
50.00
69.00
69.00
95.00
40.00
75.00
73.00
2.2.1
Concretor, Semi-skilled,Local
85.00
70.00
77.50
76.67
85.00
45.00
63.50
63.50
80.00
50.00
63.50
63.00
2.2.2
70.00
45.00
55.92
54.25
70.00
40.00
54.50
54.50
75.00
45.00
55.50
54.50
Bricklayer
3.1.1
110.00
80.00
92.50
91.67
130.00
65.00
99.00
98.50
120.00
60.00
90.50
90.00
3.1.2
Bricklayer,Skilled, Foreign
90.00
55.00
75.00
74.17
100.00
55.00
74.00
73.50
95.00
45.00
76.00
75.00
3.2.1
Bricklayer,Semi-skilled, Local
80.00
65.00
73.33
71.67
115.00
45.00
70.00
70.00
85.00
50.00
66.00
66.00
3.2.2
65.00
45.00
56.67
56.67
90.00
38.00
57.80
57.50
70.00
38.00
54.30
54.30
Plasterer
4.1.1
110.00
85.00
96.67
95.50
150.00
75.00
111.00
109.50
150.00
80.00
102.50
102.00
4.1.2
100.00
75.00
85.83
85.00
100.00
60.00
80.00
79.00
100.00
60.00
80.00
79.50
4.2.1
90.00
65.00
78.33
77.50
105.00
55.00
74.50
73.50
95.00
50.00
72.20
71.80
4.2.2
Plasterer, Semi-skilled,Foreign
80.00
55.00
69.17
69.17
80.00
45.00
62.00
61.50
65.00
40.00
55.80
55.50
Tiler
5.1.1
110.00
85.00
98.33
96.67
145.00
80.00
115.00
114.00
135.00
90.00
106.70
106.20
5.1.2
85.00
65.00
76.67
75.83
120.00
60.00
86.00
86.00
120.00
55.00
77.30
77.00
5.2.1
85.00
65.00
74.17
73.50
115.00
55.00
91.00
89.50
115.00
60.00
83.00
82.20
5.2.2
65.00
50.00
58.33
58.33
100.00
50.00
67.00
67.00
85.00
40.00
57.30
56.80
Barbender
6.1.1
Barbender, Skilled,Local
100.00
80.00
92.00
90.00
130.00
75.00
104.50
101.00
120.00
75.00
96.00
94.70
6.1.2
Barbender,Skilled, Foreign
85.00
60.00
73.33
71.67
110.00
60.00
79.50
78.00
95.00
55.00
72.90
71.70
6.2.1
Barbender,Semi-skilled, Local
90.00
60.00
75.00
74.50
100.00
55.00
75.00
75.00
85.00
50.00
68.00
67.70
6.2.2
70.00
45.00
57.58
56.75
90.00
50.00
65.00
60.00
65.00
38.00
52.30
52.00
Carpenter-Formwork
7.1.1
145.00
100.00
122.50
120.83
140.00
75.00
101.00
100.00
150.00
80.00
99.80
98.00
7.1.2
Carpenter-Formwork,Skilled, Foreign
95.00
65.00
80.00
78.67
110.00
55.00
79.00
78.50
90.00
50.00
72.50
71.50
7.2.1
90.00
70.00
79.17
79.17
100.00
55.00
74.50
74.50
80.00
50.00
66.50
66.00
7.2.2
Carpenter-Formwork, Semi-skilled,Foreign
85.00
50.00
63.33
60.50
90.00
45.00
63.00
63.00
70.00
45.00
55.50
55.00
2.1 WAGE RATES OF CONSTRUCTION WORKERS JULY 2013 (DAILY) / KADAR UPAH PEKERJA BINAAN JULAI 2013 (HARIAN)
SEMENANJUNG
NO.
PERAK
Maximum
Minimum
RM
RM
SELANGOR
Common
July 13
RM
Common
Jan 13
RM
Maximum
Minimum
RM
RM
KUALA LUMPUR
Common
July 13
RM
Common
Jan 13
RM
Maximum
Minimum
RM
RM
Common
July 13
RM
Common
Jan 13
RM
Carpenter-Joinery
8.1.1
140.00
115.00
126.67
125.83
150.00
75.00
116.50
114.50
140.00
85.00
108.00
107.50
8.1.2
Carpenter-Joinery, Skilled,Foreign
115.00
80.00
98.33
97.50
120.00
60.00
86.50
85.50
110.00
55.00
79.00
78.00
8.2.1
Carpenter-Joinery,Semi-skilled, Local
110.00
90.00
101.67
101.33
105.00
55.00
80.00
80.00
100.00
50.00
70.50
69.50
8.2.2
95.00
65.00
79.17
78.33
90.00
50.00
61.50
61.50
90.00
40.00
60.00
59.50
Roofer
9.1.1
115.00
80.00
95.83
95.00
140.00
70.00
100.00
98.50
120.00
90.00
104.00
103.00
9.1.2
Roofer,Skilled, Foreign
95.00
70.00
82.50
81.67
105.00
50.00
75.50
75.40
100.00
55.00
79.50
79.20
9.2.1
Roofer,Semi-skiiled, Local
90.00
60.00
75.83
75.00
92.00
55.00
72.70
72.00
85.00
55.00
73.50
72.50
9.2.2
80.00
50.00
66.67
66.67
80.00
45.00
54.50
54.00
70.00
45.00
58.50
58.00
10
120.00
90.00
105.00
104.17
160.00
75.00
107.00
105.00
145.00
100.00
121.50
120.50
100.00
80.00
88.00
87.67
120.00
65.00
82.70
81.50
110.00
60.00
88.50
88.00
95.00
75.00
83.67
82.83
120.00
50.00
75.50
75.50
105.00
55.00
82.00
81.50
85.00
55.00
69.17
68.83
90.00
45.00
61.50
60.50
80.00
45.00
60.20
59.70
11
General Welder
100.00
70.00
84.17
82.50
170.00
95.00
123.50
122.50
145.00
90.00
115.50
113.50
90.00
65.00
75.83
73.17
120.00
70.00
93.50
93.00
105.00
55.00
78.50
77.50
75.00
55.00
64.17
63.33
130.00
65.00
86.50
86.50
95.00
50.00
68.50
67.50
65.00
50.00
58.00
57.50
90.00
55.00
68.00
68.00
75.00
45.00
55.00
54.50
12
75.00
89.17
87.50
170.00
80.00
110.50
109.00
140.00
85.00
105.50
104.50
75.00
50.00
65.83
64.17
125.00
60.00
81.00
79.50
100.00
60.00
73.50
72.50
80.00
55.00
69.67
68.83
120.00
55.00
75.50
74.00
105.00
55.00
71.80
71.60
60.00
40.00
51.33
50.83
100.00
45.00
60.00
59.50
90.00
40.00
54.00
53.50
95.00
75.00
83.33
82.50
130.00
80.00
104.00
103.00
150.00
75.00
104.50
103.50
80.00
55.00
64.17
64.17
100.00
50.00
76.00
75.00
100.00
60.00
79.00
77.80
80.00
60.00
71.00
70.50
90.00
50.00
74.50
74.00
100.00
50.00
70.70
70.20
70.00
40.00
50.00
50.00
80.00
50.00
67.00
61.50
85.00
40.00
57.50
57.50
85.00
60.00
71.67
70.00
130.00
70.00
98.50
97.50
120.00
70.00
87.50
86.50
70.00
45.00
55.50
55.00
100.00
60.00
77.50
76.50
100.00
45.00
66.00
65.70
13
14
Plumber-Reticulation
2.1 WAGE RATES OF CONSTRUCTION WORKERS JULY 2013 (DAILY) / KADAR UPAH PEKERJA BINAAN JULAI 2013 (HARIAN)
SEMENANJUNG
NO.
PERAK
SELANGOR
Common
July 13
RM
Maximum
Minimum
RM
RM
2700.00
1400.00
2000.00
2500.00
1100.00
1741.67
3300.00
2300.00
2800.00
2300.00
150.00
120.00
15
16
17
18
Common
Jan 13
RM
KUALA LUMPUR
Common
July 13
RM
Maximum
Minimum
RM
RM
1970.33
4000.00
2200.00
3154.00
1708.33
3250.00
1550.00
2255.00
2825.00
2821.67
4500.00
2550.00
2550.00
2541.67
3350.00
1800.00
110.00
128.33
127.50
140.00
85.00
101.67
100.83
110.00
95.00
65.00
80.00
79.17
75.00
55.00
64.17
Common
Jan 13
RM
Common
July 13
RM
Common
Jan 13
RM
Maximum
Minimum
RM
RM
3138.00
4200.00
1800.00
3000.00
2995.00
2250.00
3600.00
1400.00
2205.00
2200.00
3545.00
3540.00
4350.00
2250.00
3259.70
3255.70
2390.00
2390.00
3750.00
1850.00
2600.80
2595.80
80.00
99.50
98.00
130.00
95.00
109.50
108.50
65.00
82.50
81.50
115.00
65.00
83.50
82.30
95.00
60.00
78.00
77.00
110.00
60.00
79.30
78.00
64.17
80.00
50.00
62.00
61.50
95.00
45.00
63.30
62.80
Scaffolder - Prefabricated
Scaffolder - Tubular
110.00
75.00
88.33
87.50
120.00
75.00
98.00
97.50
115.00
75.00
96.50
96.00
90.00
60.00
74.17
73.33
90.00
60.00
78.00
77.00
95.00
60.00
77.70
76.70
85.00
55.00
70.00
69.83
90.00
55.00
76.50
76.50
90.00
50.00
68.70
68.20
70.00
45.00
57.50
57.50
80.00
40.00
60.00
60.00
70.00
40.00
56.30
55.80
19
Painter - Building
100.00
70.00
84.17
83.33
130.00
80.00
99.50
98.50
130.00
80.00
93.50
93.00
85.00
55.00
66.67
65.00
95.00
55.00
75.50
74.50
115.00
65.00
77.50
77.00
70.00
50.00
60.00
60.00
90.00
55.00
74.50
74.50
95.00
50.00
65.60
65.10
70.00
45.00
53.33
53.33
70.00
50.00
58.00
58.00
75.00
40.00
54.20
53.70
80.00
55.00
68.33
67.50
90.00
55.00
74.50
68.50
80.00
45.00
60.00
59.40
60.00
40.00
50.00
49.17
70.00
50.00
55.00
55.00
60.00
40.00
49.50
49.00
20
2.1 WAGE RATES OF CONSTRUCTION WORKERS JULY 2013 (DAILY) / KADAR UPAH PEKERJA BINAAN JULAI 2013 (HARIAN)
NO.
SEMENANJUNG
NEGERI SEMBILAN
Maximum
Minimum
RM
RM
Common
July 13
RM
MELAKA
Common
Jan 13
RM
Maximum
Minimum
RM
RM
Common
July 13
RM
JOHOR
Common
Jan 13
RM
Maximum
Minimum
RM
RM
Common
July 13
RM
Common
Jan 13
RM
1.1.1
77.00
60.00
68.17
67.17
70.00
45.00
56.17
55.83
85.00
50.00
67.30
65.50
1.1.2
67.00
46.00
56.50
55.50
55.00
40.00
50.00
49.17
70.00
38.00
54.30
47.50
Concretor
2.1.1
91.00
68.00
83.00
82.00
100.00
75.00
85.00
83.33
100.00
60.00
80.00
78.50
2.1.2
88.00
67.00
79.67
78.67
90.00
55.00
67.50
65.83
85.00
45.00
62.00
59.00
2.2.1
Concretor, Semi-skilled,Local
82.00
66.00
75.67
74.67
75.00
45.00
59.50
58.33
78.00
50.00
62.80
62.50
2.2.2
75.00
58.00
66.00
65.00
60.00
40.00
46.67
46.67
68.00
40.00
54.10
48.50
Bricklayer
3.1.1
91.00
82.00
87.50
86.50
100.00
70.00
84.17
82.50
120.00
70.00
88.50
86.50
3.1.2
Bricklayer,Skilled, Foreign
87.00
70.00
80.00
79.00
80.00
55.00
68.33
67.50
110.00
60.00
73.80
65.00
3.2.1
Bricklayer,Semi-skilled, Local
76.00
67.00
73.00
72.00
75.00
45.00
58.33
57.50
95.00
58.00
69.20
69.00
3.2.2
70.00
58.00
65.33
64.33
60.00
40.00
50.00
50.00
65.00
40.00
50.00
50.00
Plasterer
4.1.1
91.00
85.00
88.00
87.00
105.00
80.00
92.50
90.83
110.00
70.00
87.00
85.50
4.1.2
80.00
74.00
77.00
76.00
85.00
60.00
71.67
71.67
85.00
45.00
63.50
62.50
4.2.1
79.00
73.00
76.00
75.00
75.00
50.00
62.50
62.50
85.00
48.00
65.60
65.20
4.2.2
Plasterer, Semi-skilled,Foreign
69.00
61.00
64.00
63.00
60.00
40.00
48.33
48.33
70.00
40.00
52.80
52.50
Tiler
5.1.1
101.00
94.00
97.50
96.50
115.00
85.00
96.67
94.17
125.00
75.00
98.00
96.50
5.1.2
94.00
78.00
88.00
87.00
85.00
60.00
73.83
72.00
100.00
60.00
78.50
75.50
5.2.1
90.00
73.00
83.00
82.00
70.00
50.00
61.33
60.83
85.00
55.00
72.30
70.00
5.2.2
80.00
60.00
71.17
70.17
55.00
40.00
48.33
48.33
75.00
45.00
57.50
57.50
Barbender
6.1.1
Barbender, Skilled,Local
97.00
77.00
87.17
86.17
95.00
70.00
82.17
80.83
120.00
75.00
90.50
86.00
6.1.2
Barbender,Skilled, Foreign
81.00
70.00
76.33
75.33
80.00
55.00
65.83
65.00
90.00
55.00
72.00
63.50
6.2.1
Barbender,Semi-skilled, Local
80.00
67.00
73.67
72.67
75.00
55.00
63.00
62.50
80.00
52.00
64.20
62.00
6.2.2
70.00
53.00
61.33
60.33
65.00
40.00
50.67
49.50
70.00
45.00
55.50
54.00
Carpenter-Formwork
7.1.1
99.00
86.00
93.33
92.33
110.00
80.00
95.00
93.17
110.00
75.00
89.50
87.00
7.1.2
Carpenter-Formwork,Skilled, Foreign
90.00
73.00
81.17
80.17
85.00
65.00
75.00
73.33
95.00
65.00
77.30
66.00
7.2.1
89.00
73.00
79.83
78.83
75.00
45.00
58.33
57.50
85.00
50.00
62.80
61.50
7.2.2
Carpenter-Formwork, Semi-skilled,Foreign
80.00
69.00
74.00
73.00
60.00
40.00
49.17
49.17
70.00
45.00
54.00
54.00
2.1 WAGE RATES OF CONSTRUCTION WORKERS JULY 2013 (DAILY) / KADAR UPAH PEKERJA BINAAN JULAI 2013 (HARIAN)
NO.
SEMENANJUNG
NEGERI SEMBILAN
Maximum
Minimum
RM
RM
Common
July 13
RM
MELAKA
Common
Jan 13
RM
Maximum
Minimum
RM
RM
Common
July 13
RM
JOHOR
Common
Jan 13
RM
Maximum
Minimum
RM
RM
Common
July 13
RM
Common
Jan 13
RM
Carpenter-Joinery
8.1.1
101.00
98.00
99.67
98.67
115.00
92.00
101.50
100.33
120.00
75.00
101.00
99.00
8.1.2
Carpenter-Joinery, Skilled,Foreign
97.00
88.00
93.17
92.17
85.00
65.00
75.67
74.83
100.00
58.00
78.80
75.50
8.2.1
Carpenter-Joinery,Semi-skilled, Local
92.00
82.00
86.33
85.33
75.00
45.00
59.17
59.00
95.00
55.00
72.50
72.00
8.2.2
86.00
72.00
79.67
78.67
60.00
40.00
47.83
47.50
80.00
45.00
59.50
58.50
Roofer
9.1.1
101.00
98.00
99.50
98.50
105.00
80.00
91.67
91.17
120.00
65.00
88.70
84.00
9.1.2
Roofer,Skilled, Foreign
95.00
87.00
89.83
88.83
85.00
65.00
73.33
72.50
105.00
50.00
68.80
63.50
9.2.1
Roofer,Semi-skiiled, Local
90.00
77.00
81.50
80.50
75.00
55.00
63.33
63.33
90.00
48.00
66.30
65.00
9.2.2
80.00
65.00
71.33
70.33
60.00
40.00
51.33
51.33
80.00
40.00
54.80
53.00
10
110.00
97.00
104.17
103.17
110.00
80.00
95.83
94.17
120.00
80.00
95.00
93.50
100.00
92.00
97.33
96.33
95.00
70.00
78.33
77.83
110.00
55.00
77.00
76.00
96.00
85.00
88.67
87.67
80.00
60.00
70.83
70.83
100.00
55.00
74.00
73.00
90.00
68.00
77.67
76.67
60.00
40.00
52.00
52.00
80.00
40.00
55.50
55.50
11
General Welder
103.00
92.00
97.67
96.67
85.00
65.00
74.17
73.33
125.00
90.00
108.50
108.50
99.00
86.00
92.00
91.00
75.00
54.00
60.67
59.83
95.00
55.00
75.50
75.50
91.00
82.00
86.33
85.33
70.00
45.00
56.67
56.33
90.00
55.00
73.50
73.50
84.00
73.00
78.50
77.50
55.00
38.00
44.00
44.00
80.00
45.00
58.50
58.00
91.00
84.00
88.00
87.00
95.00
70.00
85.00
84.17
115.00
70.00
92.00
89.50
87.00
72.00
79.33
78.33
85.00
55.00
70.00
68.33
95.00
55.00
70.00
68.50
82.00
69.00
75.50
74.50
65.00
45.00
56.67
55.83
80.00
50.00
62.30
62.00
72.00
65.00
68.17
67.17
57.00
40.00
47.83
47.83
65.00
40.00
50.50
50.50
117.00
102.00
108.67
107.67
100.00
70.00
84.17
83.33
150.00
75.00
97.00
95.50
100.00
91.00
96.33
95.33
80.00
50.00
66.33
66.33
95.00
45.00
67.50
66.50
99.00
90.00
94.67
93.67
70.00
48.00
58.67
58.50
90.00
55.00
67.50
66.50
87.00
73.00
79.50
78.50
55.00
40.00
46.33
46.33
75.00
45.00
55.30
55.30
106.00
98.00
101.67
100.67
75.00
50.00
58.33
57.50
105.00
70.00
88.50
87.00
99.00
90.00
94.33
93.33
65.00
40.00
51.67
51.50
90.00
55.00
71.00
70.00
12
13
14
Plumber-Reticulation
2.1 WAGE RATES OF CONSTRUCTION WORKERS JULY 2013 (DAILY) / KADAR UPAH PEKERJA BINAAN JULAI 2013 (HARIAN)
NO.
SEMENANJUNG
NEGERI SEMBILAN
Common
July 13
RM
Maximum
Minimum
RM
RM
2402.00
2141.00
2325.17
2002.00
1702.00
1842.00
3202.00
2869.00
2552.00
2202.00
94.00
90.00
MELAKA
Common
Jan 13
RM
Common
July 13
RM
Maximum
Minimum
RM
RM
2324.17
2400.00
1400.00
1816.67
1841.00
1800.00
1300.00
1526.67
2996.50
2995.50
3000.00
1550.00
2379.00
2378.00
2000.00
1400.00
79.00
86.50
85.50
105.00
73.00
81.33
80.33
95.00
82.00
70.00
75.00
74.00
80.00
64.00
71.33
99.00
87.00
91.00
70.00
86.00
JOHOR
Common
Jan 13
RM
Common
July 13
RM
Common
Jan 13
RM
Maximum
Minimum
RM
RM
1811.67
4530.00
1950.00
2853.00
2825.00
1525.00
2750.00
1500.00
2070.00
2054.00
2208.33
2191.67
5250.00
2800.00
3770.00
3750.00
1683.33
1675.00
3200.00
1800.00
2465.00
2460.00
80.00
90.83
89.17
120.00
80.00
101.00
99.00
60.00
75.50
75.00
100.00
65.00
82.50
80.50
80.00
55.00
67.17
66.67
100.00
60.00
83.00
82.70
70.33
67.00
45.00
56.17
55.33
90.00
50.00
66.70
66.00
94.67
93.67
105.00
85.00
95.33
94.17
115.00
75.00
93.50
92.00
81.67
80.67
90.00
65.00
74.17
73.33
95.00
60.00
76.00
75.50
66.00
75.17
74.17
80.00
60.00
71.67
70.83
90.00
60.00
75.80
75.00
77.00
62.00
67.00
66.00
75.00
45.00
57.50
58.33
75.00
40.00
59.50
59.50
86.00
72.00
80.00
79.00
95.00
75.00
85.33
84.67
120.00
60.00
88.00
88.00
77.00
66.00
71.83
70.83
85.00
60.00
70.83
70.83
90.00
50.00
66.00
65.00
76.00
65.00
70.50
69.50
75.00
55.00
65.83
65.83
90.00
55.00
67.50
67.00
70.00
55.00
61.00
60.00
65.00
40.00
51.67
51.67
70.00
38.00
51.60
51.10
78.00
72.00
74.50
73.50
70.00
45.00
55.00
54.50
85.00
55.00
66.50
65.30
66.00
58.00
63.17
62.17
55.00
40.00
45.83
45.83
65.00
38.00
50.30
49.50
15
16
17
18
19
20
Scaffolder - Prefabricated
Scaffolder - Tubular
Painter - Building
2.1 WAGE RATES OF CONSTRUCTION WORKERS JULY 2013 (DAILY) / KADAR UPAH PEKERJA BINAAN JULAI 2013 (HARIAN)
SEMENANJUNG
NO.
PAHANG
Maximum
Minimum
RM
RM
KELANTAN
Common
July 13
RM
Common
Jan 13
RM
Maximum
Minimum
RM
RM
Common
July 13
RM
TERENGGANU
Common
Jan 13
RM
Maximum
Minimum
RM
RM
Common
July 13
RM
Common
Jan 13
RM
1.1.1
68.00
50.00
58.33
57.50
68.00
59.00
63.83
62.83
72.00
60.00
65.83
64.83
1.1.2
55.00
40.00
47.50
46.67
63.00
51.00
55.33
54.33
66.00
47.00
56.33
55.33
Concretor
2.1.1
80.00
50.00
65.83
65.00
87.00
70.00
79.83
78.83
91.00
77.00
85.33
84.33
2.1.2
70.00
45.00
56.17
55.00
79.00
67.00
73.17
72.17
82.00
72.00
77.50
76.50
2.2.1
Concretor, Semi-skilled,Local
65.00
45.00
54.33
52.17
77.00
59.00
69.17
68.17
75.00
62.00
69.50
68.50
2.2.2
55.00
40.00
46.67
46.67
70.00
51.00
60.00
59.00
70.00
47.00
62.67
61.67
Bricklayer
3.1.1
95.00
65.00
78.33
76.67
84.00
78.00
81.17
80.17
85.00
75.00
79.50
78.50
3.1.2
Bricklayer,Skilled, Foreign
80.00
50.00
65.50
64.67
78.00
72.00
75.50
74.50
85.00
65.00
74.00
73.00
3.2.1
Bricklayer,Semi-skilled, Local
75.00
55.00
63.67
61.67
76.00
64.00
69.50
68.50
75.00
63.00
68.00
67.00
3.2.2
65.00
40.00
49.17
49.17
66.00
57.00
62.17
61.17
70.00
55.00
61.50
60.50
Plasterer
4.1.1
90.00
65.00
78.67
76.67
85.00
77.00
81.33
80.33
87.00
77.00
80.33
79.33
4.1.2
80.00
55.00
65.00
65.00
78.00
69.00
74.33
73.33
76.00
70.00
74.17
73.17
4.2.1
75.00
55.00
62.50
62.50
76.00
67.00
71.83
70.83
75.00
66.00
70.00
69.00
4.2.2
Plasterer, Semi-skilled,Foreign
60.00
40.00
50.00
50.00
67.00
62.00
64.67
63.67
73.00
60.00
64.50
63.50
Tiler
5.1.1
115.00
85.00
102.67
100.00
90.00
85.00
88.00
87.00
96.00
84.00
90.00
89.00
5.1.2
85.00
65.00
77.50
75.83
87.00
74.00
79.67
78.67
89.00
75.00
82.17
81.17
5.2.1
80.00
60.00
67.50
67.50
80.00
64.00
74.17
73.17
88.00
72.00
79.67
78.67
5.2.2
60.00
38.00
52.50
52.50
74.00
62.00
67.00
66.00
73.00
65.00
70.00
69.00
Barbender
6.1.1
Barbender, Skilled,Local
80.00
65.00
71.00
70.00
80.00
74.00
77.67
76.67
89.00
75.00
82.00
81.00
6.1.2
Barbender,Skilled, Foreign
70.00
50.00
60.83
60.83
72.00
64.00
69.00
68.33
78.00
72.00
76.17
75.17
6.2.1
Barbender,Semi-skilled, Local
65.00
45.00
57.50
57.50
69.00
62.00
66.00
65.00
76.00
63.00
68.50
67.50
6.2.2
55.00
40.00
46.67
46.67
66.00
48.00
58.50
57.50
65.00
52.00
58.33
57.33
Carpenter-Formwork
7.1.1
90.00
60.00
73.33
73.33
88.00
80.00
85.33
84.33
91.00
84.00
87.17
86.17
7.1.2
Carpenter-Formwork,Skilled, Foreign
80.00
50.00
66.17
66.17
84.00
73.00
78.50
77.50
84.00
72.00
78.00
77.00
7.2.1
70.00
45.00
58.33
58.33
82.00
73.00
76.50
75.50
80.00
71.00
75.50
74.50
7.2.2
Carpenter-Formwork, Semi-skilled,Foreign
60.00
40.00
50.00
50.00
76.00
64.00
68.17
67.17
78.00
65.00
69.17
68.17
10
2.1 WAGE RATES OF CONSTRUCTION WORKERS JULY 2013 (DAILY) / KADAR UPAH PEKERJA BINAAN JULAI 2013 (HARIAN)
SEMENANJUNG
NO.
PAHANG
Maximum
Minimum
RM
RM
KELANTAN
Common
July 13
RM
Common
Jan 13
RM
Maximum
Minimum
RM
RM
Common
July 13
RM
TERENGGANU
Common
Jan 13
RM
Maximum
Minimum
RM
RM
Common
July 13
RM
Common
Jan 13
RM
Carpenter-Joinery
8.1.1
90.00
70.00
80.83
80.83
94.00
89.00
92.00
91.00
95.00
90.00
92.33
91.33
8.1.2
Carpenter-Joinery, Skilled,Foreign
75.00
58.00
68.33
68.33
88.00
80.00
84.33
83.33
90.00
82.00
86.00
85.00
8.2.1
Carpenter-Joinery,Semi-skilled, Local
70.00
55.00
62.50
62.50
86.00
78.00
81.50
80.50
87.00
75.00
80.67
79.67
8.2.2
65.00
40.00
52.50
52.50
77.00
69.00
73.00
72.00
81.00
70.00
74.00
73.00
Roofer
9.1.1
85.00
70.00
78.33
78.33
94.00
89.00
91.83
90.83
98.00
91.00
94.17
93.17
9.1.2
Roofer,Skilled, Foreign
75.00
60.00
68.00
68.00
83.00
78.00
81.00
80.00
89.00
81.00
84.83
83.83
9.2.1
Roofer,Semi-skiiled, Local
70.00
55.00
61.67
61.67
80.00
72.00
75.83
74.83
82.00
72.00
77.00
76.00
9.2.2
60.00
43.00
50.50
50.50
68.00
63.00
65.67
64.67
72.00
64.00
66.67
65.67
10
95.00
65.00
80.00
80.00
100.00
90.00
96.17
95.17
101.00
95.00
98.50
97.50
85.00
60.00
74.17
74.17
97.00
84.00
90.00
89.00
97.00
86.00
90.17
89.17
75.00
50.00
65.00
65.00
87.00
74.00
81.67
80.67
91.00
78.00
84.17
83.17
60.00
40.00
51.33
51.33
82.00
67.00
72.50
71.50
78.00
66.00
72.83
71.83
11
General Welder
105.00
75.00
93.67
93.67
95.00
79.00
87.50
86.50
98.00
85.00
92.83
91.83
85.00
55.00
67.50
67.50
90.00
79.00
84.17
83.17
92.00
81.00
86.33
85.33
75.00
55.00
65.83
65.83
81.00
74.00
77.83
76.83
83.00
72.00
79.50
78.50
60.00
40.00
52.50
52.50
74.00
66.00
71.17
70.17
80.00
67.00
73.83
72.83
12
60.00
78.33
78.33
88.00
74.00
81.83
80.83
94.00
77.00
84.67
83.67
75.00
45.00
64.17
64.17
77.00
68.00
73.00
72.00
83.00
70.00
75.67
74.67
70.00
55.00
62.83
62.83
72.00
64.00
69.00
68.00
74.00
65.00
70.00
69.00
60.00
40.00
50.33
50.33
63.00
59.00
61.33
60.33
70.00
60.00
64.50
63.50
13
Plumber-Reticulation
100.00
60.00
77.50
77.50
105.00
95.00
100.50
99.50
105.00
98.00
101.33
100.33
80.00
45.00
64.17
64.17
95.00
85.00
90.50
89.50
96.00
87.00
91.83
90.83
75.00
50.00
65.50
65.50
95.00
80.00
87.67
86.67
92.00
85.00
88.83
87.83
65.00
40.00
49.17
49.17
85.00
69.00
76.17
75.17
87.00
70.00
76.17
75.17
100.00
60.00
80.00
80.00
97.00
90.00
93.33
92.33
98.00
93.00
95.50
94.50
80.00
45.00
61.67
61.67
95.00
80.00
87.67
86.67
94.00
82.00
88.50
87.50
14
11
2.1 WAGE RATES OF CONSTRUCTION WORKERS JULY 2013 (DAILY) / KADAR UPAH PEKERJA BINAAN JULAI 2013 (HARIAN)
SEMENANJUNG
NO.
PAHANG
KELANTAN
Common
July 13
RM
Maximum
Minimum
RM
RM
2300.00
1550.00
2041.67
1900.00
1200.00
1601.67
2800.00
1850.00
2500.00
1600.00
95.00
75.00
15
16
17
18
Common
Jan 13
RM
Common
July 13
RM
Maximum
Minimum
RM
RM
2041.67
2268.00
1856.00
2088.67
1601.67
1856.00
1502.00
1670.50
2290.00
2290.00
2902.00
2602.00
1966.67
1966.67
2502.00
1924.00
65.00
78.33
78.33
87.00
55.00
65.83
65.83
78.00
70.00
50.00
61.17
61.17
65.00
45.00
52.50
TERENGGANU
Common
Jan 13
RM
Common
July 13
RM
Common
Jan 13
RM
Maximum
Minimum
RM
RM
2087.67
2502.00
1893.00
2149.67
2148.67
1669.50
1992.00
1578.00
1780.67
1779.67
2772.00
2771.00
2969.00
2630.00
2790.83
2789.83
2180.67
2179.67
2802.00
1893.00
2212.33
2211.33
77.00
80.00
79.00
99.00
76.00
84.33
83.33
67.00
72.50
71.50
83.00
72.00
75.83
74.83
72.00
62.00
68.33
67.33
74.00
65.00
69.33
68.33
52.50
67.00
59.00
64.17
63.17
73.00
64.00
68.17
67.17
Scaffolder - Prefabricated
Scaffolder - Tubular
100.00
65.00
83.33
83.33
91.00
78.00
83.33
82.33
90.00
84.00
87.00
86.00
90.00
55.00
73.33
73.33
80.00
63.00
72.50
71.50
81.00
68.00
75.00
74.00
80.00
50.00
66.67
66.67
70.00
63.00
67.50
66.50
73.00
66.00
69.00
68.00
65.00
45.00
54.17
54.17
67.00
54.00
60.50
59.50
66.00
58.00
62.83
61.83
90.00
55.00
75.83
75.83
79.00
72.00
76.17
75.17
80.00
67.00
74.33
73.33
75.00
45.00
61.67
61.67
70.00
65.00
67.00
66.00
74.00
62.00
67.33
66.33
65.00
45.00
58.83
58.83
68.00
59.00
64.50
63.50
71.00
62.00
65.83
64.83
55.00
40.00
47.50
47.50
58.00
50.00
55.17
54.17
62.00
52.00
56.17
55.17
65.00
45.00
53.33
53.33
68.00
62.00
65.33
64.33
79.00
62.00
69.50
68.50
55.00
40.00
45.00
45.00
58.00
52.00
55.67
54.67
74.00
52.00
60.83
59.83
19
20
Painter - Building
12