Method Statement Divert SG Selabak KG Cerah
Method Statement Divert SG Selabak KG Cerah
NAIKTARAF JALAN KG. CERAH, DAERAH HILIR PERAK CONTRACT REF. NO: PERS/PK/352/2010
METHOD OF STATEMENT
FOR DIVERSION OF SG. SELABAK (CH 2150
Prepared By
Project Engineer
. Project Director
Clients Rep.
COPY NO !
Rev. no ""
SALAM FAJAR SDN. BHD. NAIKTARAF JALAN KG. CERAH, DAERAH HILIR PERAK METHOD OF STATEMENT: DIVERSION OF SG. SELABAK
1.0
OBJECTIVE To minimize losses in construction To provide a safe working environment. To follow work procedures to ensure the quality construction. SCOPE OF WORK To be implemented for construction of arch culvert Safety precaution RESPONSIBILITIES Site Engineer Site Surveyor Site Supervisor MATERIALS from own sources or stockpile, pipe culvert 1 !!mm" PLANT, MACHINERY AND EQ IPMENTS E#cavation $ E#cavator %nstallation $ &rane &ompaction $ 'oller &ompactor SEQ ENCE OF WORK (.1 E#cavate the new diversion line of Sg. Selabak e#cept the inlet and the outlet of the new line. (.) *y using crane, hang the pipe culvert 1 !!mm" to place it on the e#cavated new line. &ontinue the work for installation of pipe culvert for the whole length of new line. (.+ E#cavate the inlet and outlet of the new line then backfill on the top of pipe culvert to the level of temporary access. (., *ackfill the e#isting Sg. Selabak temporarily with e#cavated materials for temporary access. (. &ompact using roller compactor the e#cavated and backfilled area for temporary access.
2.0
3.0
4.0
5.0
!.0
Rev. no: 00
Effective Date:04-Apr-14
Page ) of +
SALAM FAJAR SDN. BHD. NAIKTARAF JALAN KG. CERAH, DAERAH HILIR PERAK METHOD OF STATEMENT: DIVERSION OF SG. SELABAK
".0
ATTACHMENT
To Teluk %ntan
e#isting road
To Selabak
.egend E#isting flow /ew flow 'emained flow E#isting canal -roposed new diversion canal