Power Transformer Repair

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

Power Transformer Repair

Picture 1 - 1

Picture 1 - 3

On site inspection and repair of one unit of 30MVA transformer. Transformer core and windings were lifted out of the transformer tan using a 1!0 ton crane. A tent was erected to carr" out repair on the flash o#er $etween tapping leads of the "ellow phase %V windings. &eneral o#erhaul was carried out at site after the repair which includes changing of gas ets' #acuum deh"dration of windings' and oil purification. Picture 1-1 shows untan ing process and Picture 1-3 shows tan ing process after the repair

Tap (hanger (on#ersion

(on#ersion of 30MVA 13)*33 V Transformer A(+( on load tap changer to use MR on load tap changer. (on#ersion was done on site. Picture ,1 and ,-) show transformer with tap changer $efore and after con#ersion respecti#el".

+pa pro#ide maintenance on switchgear panels instrument such asMaintenance of Oil' Medium Oil' Vacuum and ./0 circuit $rea ers' rela" testing and re-cali$ration' current transformer' potential transformer testing' and etc. 1e also attend to flash o#er of switchgear panel instrument caused $" electrical failure or e2ternal source with a minimum downtime.

.u$-station $i-annual rela" cali$ration

(ircuit 3rea er ser#icing and testing

You might also like