BOQ Upgrading Project

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 17

REKAPITULASI BIAYA

PEKERJAAN UPGRADING SP SUBANG

NO

URAIAN PEKERJAAN

VOLUME
PEKERJAA
N

HARGA SATUAN

JUMLAH HARGA (RP)

MATERIAL

BAHAN/ALAT

UPAH

MATERIAL

BAHAN/ALAT

UPAH

TOTAL HARGA
(RP)

1 Persiapan
a. Survey dan perijinan
b. Direksi kit (site office & site warehouse)
c. Mobilisasi material & peralatan

1.00 Ls
1.00 Ls
1.00 Ls

X
X
X

0.00
0.00
X

0.00
0.00
0.00

X
X
X
X

0.00
0.00
X
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

2 Project Management
a. Project Leader (1 orang)
b. Project Control (1 orang)
c. HSE Officer (2 orang)
d. Security (2 orang)
e. Tools (gas detector 2 unit)
f. Administrasi Project (laporan, persuratan, ATK, dll)

1.00
1.00
1.00
1.00
1.00
1.00

X
X
X
X
X
X

X
X
X
X
X
0.00

0.00
0.00
0.00
0.00
0.00
0.00

X
X
X
X
X
X
X

X
X
X
X
X
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Ls
Ls
Ls
Ls
Ls
Ls

3 Rekap Pekerjaan Kontruksi


a. Pekerjaan sipil
b. Pekerjaan Mekanik
c. Pekerjaan listrik
d. Pekerjaan Instrument

4 Sertifikasi & Commissioning

1.00 Ls

0.00

0.00

0.00

5 Finishing ( Perapihan dan demobilisasi)

1.00 Ls

0.00

0.00

0.00

0.00

0.00

0.00

0.00

TOTAL BIAYA PEKERJAAN

VOLUME PEKERJAAN (BQ)


UPGRADING SP. SUBANG
SCOPE OF WORK MECHANICAL & PIPING
Rev.01

HARGA SATUAN (Rp)


No.

U R A I A N PEKERJAAN

Konstruksi & Instalasi Peralatan Utama


Pemasangan Package Unit Inlet Production Separator TAG No 2-11-19 A/B, ukuran ID. 2000
1.
mm x TL/TL. 6000 mm material CS + Clad.316L
Pemasangan Package Unit LP Production Separator TAG No 2-11-20 A/B, ukuran ID. 1350 mm
2.
x TL/TL. 4100 mm material SS.316L
Pengadaan Package Unit Flare KO Drum (Closed Drain Vessel) c/w accessories Tag. No. 2-113. D26, mengacu doc. no. 106591-13-MS-03-DS-020 Rev.0 dan No.106591-52-PE-01-PD-002
rev.0
4. Pemasangan Package Unit Flare KO Drum (Closed Drain Vessel) Tag. No. 2-11-D26
Pembangunan FWKO Tank c/w accessories ukuran ID. 9600 mm x h. 11.000 mm, mengacu doc.
5.
No. 116639-11-MS-03-DS-004, including engineering, material, fabrication, inspeksi & test

Volume Satuan

Upah

Alat & Bahan Habis

JUMLAH HARGA (Rp)


Upah

Material

Alat & Bahan Habis

Material

TOTAL

set

0.00

0.00

0.00

0.00

0.00

set

0.00

0.00

0.00

0.00

0.00

set

set

0.00

0.00

0.00

0.00

Ls

0.00

0.00

0.00

0.00

Pengadaan Unit Dry Air Receiver Drum Tag.No. 2-11-D31, mengacu doc. no. 116639-11-MS-036.
DS-003 Rev.0

set

7. Pemasangan Unit Dry Air Receiver Drum Tag.No. 2-11-D31

set

0.00

0.00

x
0.00

0.00
0.00

0.00

0.00

0.00

JUMLAH I

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

II. Konstruksi & Instalasi Sistem Perpipaan (Piping System)


A. Process Piping Class 600#
1 Pipe dia.20" ASTM A106 Gr.B Sch.80 BE x L.6000 mm
2 Pipe dia.16" ASTM A106 Gr.B Sch.80 BE x L.6000 mm
3 Pipe dia.12" ASTM A106 Gr.B Sch.80 BE x L.6000 mm
4 Pipe dia.8" ASTM A106 Gr.B Sch.80 BE x L.6000 mm
5 Pipe dia.6" ASTM A106 Gr.B Sch.80 BE x L.6000 mm
6 Pipe dia.1" ASTM A106 Gr.B Sch.80 PE x L.6000 mm
7 Flange dia.20" ASTM A105 ANSI 600# WN RF Neck Sch.80, ASME B.16.5
8 Flange dia.16" ASTM A105 ANSI 600# WN RF Neck Sch.80, ASME B.16.5
9 Flange dia.12" ASTM A105 ANSI 600# WN RF Neck Sch.80, ASME B.16.5
10 Flange dia.8" ASTM A105 ANSI 600# WN RF Neck Sch.80, ASME B.16.5
11 Flange dia.6" ASTM A105 ANSI 600# WN RF Neck Sch.80, ASME B.16.5
12 Flange dia.1" ASTM A105 ANSI 600# SW RF, ASME B16.5
13 Blind Flange dia.20" ASTM A105 ANSI 600# RF, ASME B16.5
14 Blind Flange dia.12" ASTM A105 ANSI 600# RF, ASME B16.5
15 Blind Flange dia.8" ASTM A105 ANSI 600# RF, ASME B16.5
16 Blind Flange dia.6" ASTM A105 ANSI 600# RF, ASME B16.5
Spectacle Blind dia.12" ANSI 600# RF as per datasheet doc.no. 116639-11-PP-02-DS-002
17 Rev.01
18 Elbow dia.20" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
19 Elbow dia.16" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
20 Elbow dia.12" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
21 Elbow dia.12" - 45 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
22 Elbow dia.8" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
23 Elbow dia.6" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
24 Elbow dia.6" - 45 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
25 Straight Tee dia.16" x 16" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
26 Straight Tee dia.12" x 12" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
27 Straight Tee dia.8" x 8" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
28 Straight Tee dia.6" x 6" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
29 Reducing Tee dia.20" x 16" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
30 Reducing Tee dia.20" x 12" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
31 Reducing Tee dia.12" x 8" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
32 Reducing Tee dia.12" x 6" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
33 Eccentric Reducer dia.12" x 6" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
34 Weldolet dia.1" ASTM A105 CL.3000 LB, ASME B.16.11
35 Nipple dia.1" ASTM A106 Gr.B Sch.80 x L.150 mm Plain One End (POE) x Thread One End
36 Ball Valve dia.20"- ANSI 600# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
37 Ball Valve dia.16"- ANSI 600# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
38 Ball Valve dia.12"- ANSI 600# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
39 Ball Valve dia.8"- ANSI 600# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
40 Ball Valve dia.6"- ANSI 600# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
41 Ball Valve dia.1"- ANSI 600# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
42 Spiral Wound Gasket dia.20"- ANSI 600# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
43 Spiral Wound Gasket dia.16"- ANSI 600# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01

/222336130.xls.ms_office/BQ rev.01/

5
4
5
2
4
1
5
12
24
6
14
8
3
2
2
2
2
2
6
10
4
4
8
4
2
10
2
4
2
2
2
6
2
4
4
1
2
8
2
4
4
5
12

jts
jts
jts
jts
jts
jts
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

pcs

0.00

0.00

0.00

pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2 of 17

VOLUME PEKERJAAN (BQ)


UPGRADING SP. SUBANG
SCOPE OF WORK MECHANICAL & PIPING
Rev.01

HARGA SATUAN (Rp)


No.

U R A I A N PEKERJAAN
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98

Spiral Wound Gasket dia.12"- ANSI 600# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Spiral Wound Gasket dia.8"- ANSI 600# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Spiral Wound Gasket dia.6"- ANSI 600# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Spiral Wound Gasket dia.1"- ANSI 600# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Stud Bolt & Nut M42 x L. min. 285 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Stud Bolt & Nut M39 x L. min. 260 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Stud Bolt & Nut M33 x L. min. 235 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Stud Bolt & Nut M30 x L. min. 260 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Stud Bolt & Nut M30 x L. min. 205 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Stud Bolt & Nut M27 x L. min. 185 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Stud Bolt & Nut M16 x L. min. 90 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Fit-up & welding pipe dia.20" A106 Gr.B Sch.80
Fit-up & welding pipe dia.16" A106 Gr.B Sch.80
Fit-up & welding pipe dia.12" A106 Gr.B Sch.80
Fit-up & welding pipe dia.8" A106 Gr.B Sch.80
Fit-up & welding pipe dia.6" A106 Gr.B Sch.80
Fit-up & welding pipe dia.1" A106 Gr.B Sch.80
Fit-up & welding flange dia.20" A105 ANSI 600# WN RF Neck Sch.80
Fit-up & welding flange dia.16" A105 ANSI 600# WN RF Neck Sch.80
Fit-up & welding flange dia.12" A105 ANSI 600# WN RF Neck Sch.80
Fit-up & welding flange dia.8" A105 ANSI 600# WN RF Neck Sch.80
Fit-up & welding flange dia.6" A105 ANSI 600# WN RF Neck Sch.80
Fit-up & welding flange dia.1" A105 ANSI 600# WN RF Neck Sch.80
Fit-up & welding elbow dia.20" A234 WPB (SML) Sch.80 BE
Fit-up & welding elbow dia.16" A234 WPB (SML) Sch.80 BE
Fit-up & welding elbow dia.12" A234 WPB (SML) Sch.80 BE
Fit-up & welding elbow dia.8" A234 WPB (SML) Sch.80 BE
Fit-up & welding elbow dia.6" A234 WPB (SML) Sch.80 BE
Fit-up & welding straight tee dia.16" x 16" A234 WPB (SML) Sch.80 BE
Fit-up & welding straight tee dia.12" x 12" A234 WPB (SML) Sch.80 BE
Fit-up & welding straight tee dia.8" x 8" A234 WPB (SML) Sch.80 BE
Fit-up & welding straight tee dia.6" x 6" A234 WPB (SML) Sch.80 BE
Fit-up & welding reducing tee dia.20" x 16" A234 WPB (SML) Sch.80 BE
Fit-up & welding reducing tee dia.20" x 12" A234 WPB (SML) Sch.80 BE
Fit-up & welding reducing tee dia.12" x 8" A234 WPB (SML) Sch.80 BE
Fit-up & welding reducing tee dia.12" x 6" A234 WPB (SML) Sch.80 BE
Fit-up & welding eccentric reducer dia.12" x 6" A234 WPB (SML) Sch.80 BE
Fit-up & welding weldolet dia.1" A105 CL.3000 LB
Install pipe dia.20" Sch.80 on support/piping system/piping interface existing
Install pipe dia.16" Sch.80 on support/piping system/piping interface existing
Install pipe dia.12" Sch.80 on support/piping system/piping interface existing
Install pipe dia.8" Sch.80 on support/piping system/piping interface existing
Install pipe dia.6" Sch.80 on support/piping system/piping interface existing
Install Valves dia.12" - ANSI 600# on support/piping system/piping interface existing
Install Valves dia.8" - ANSI 600# on support/piping system/piping interface existing
Install Valves dia.6" - ANSI 600# on support/piping system/piping interface existing
Install Valves dia.1" - ANSI 600# on support/piping system/piping interface existing
Install Blind Flanges dia.20" - ANSI 600# on piping system/piping interface existing
Install Blind Flanges dia.12" - ANSI 600# on piping system/piping interface existing
Install Blind Flanges dia.8" - ANSI 600# on piping system/piping interface existing
Install Blind Flanges dia.6" - ANSI 600# on piping system/piping interface existing
Cutting existing piping dia.12" A106 Gr.B Sch.80 by rotary cold cutter, including remove any
obstacle
Cutting existing piping dia.6" A106 Gr.B Sch.80 by rotary cold cutter, including remove any
obstacle
Demolish/dismatle existing piping dia.12", including disconnect flange any flange connection
Demolish/dismatle existing piping dia.6" , including disconnect flange any flange connection

Volume Satuan
24
6
14
8
120
240
520
32
96
192
32
10
12
15
8
24
8
5
12
24
6
14
8
2
6
14
4
12
2
10
2
4
2
2
2
6
2
4
30
24
30
12
24
8
2
4
4
3
2
2
2
4
4
30
24

pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
Ttk
Ttk
Ttk
Ttk
Ttk
Ttk
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
m-run
m-run
m-run
m-run
m-run
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs

Upah

Alat & Bahan Habis

x
x
x
x
x
x
x
x
x
x
x

x
x
x
x
x
x
x
x
x
x
x

JUMLAH HARGA (Rp)


Material
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Upah

Alat & Bahan Habis

x
x
x
x
x
x
x
x
x
x
x

x
x
x
x
x
x
x
x
x
x
x

/222336130.xls.ms_office/BQ rev.01/

2
4
2
4
8

TOTAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Ttk

0.00

0.00

0.00

0.00

0.00

Ttk

0.00

0.00

0.00

0.00

0.00

m-run
m-run

0.00
0.00

0.00
0.00

x
x

0.00
0.00

0.00
0.00

x
x

0.00
0.00

0.00

0.00

JUMLAH II.A
B. Process Piping Class 300#
1 Pipe dia.18" ASTM A106 Gr.B Sch.80 BE x L.6000 mm
2 Pipe dia.16" ASTM A106 Gr.B Sch.80 BE x L.6000 mm
3 Pipe dia.14" ASTM A106 Gr.B Sch.80 BE x L.6000 mm
4 Pipe dia.6" ASTM A106 Gr.B Sch.80 BE x L.6000 mm
5 Flange dia.16" ASTM A105 ANSI 300# WN RF Neck Sch.80, ASME B.16.5

Material

jts
jts
jts
jts
pcs

x
x
x
x
x

x
x
x
x
x

0.00
0.00
0.00
0.00
0.00

x
x
x
x
x

x
x
x
x
x

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

3 of 17

VOLUME PEKERJAAN (BQ)


UPGRADING SP. SUBANG
SCOPE OF WORK MECHANICAL & PIPING
Rev.01

HARGA SATUAN (Rp)


No.

U R A I A N PEKERJAAN
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56

Flange dia.14" ASTM A105 ANSI 300# WN RF Neck Sch.80, ASME B.16.5
Flange dia.12" ASTM A105 ANSI 300# WN RF Neck Sch.80, ASME B.16.5
Flange dia.6" ASTM A105 ANSI 300# WN RF Neck Sch.80, ASME B.16.5
Flange dia.1" ASTM A105 ANSI 300# SW RF, ASME B16.5
Blind Flange dia.12" ASTM A105 ANSI 300#, ASME B.16.5
Elbow dia.16" - 45 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Elbow dia.14" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Straight Tee dia.16" x 16" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Reducing Tee dia.18" x 14" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Reducing Tee dia.18" x 12" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Weldolet dia.1" ASTM A105 CL.3000 LB, ASME B.16.11
Nipple dia.1" ASTM A106 Gr.B Sch.80 x L.150 mm Plain One End (POE) x Thread One End
Ball Valve dia.16"- ANSI 300# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
Ball Valve dia.14"- ANSI 300# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
Ball Valve dia.12"- ANSI 300# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
Ball Valve dia.6"- ANSI 300# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
Ball Valve dia.1"- ANSI 300# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
Check Valve dia.14"- ANSI 300# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
Spiral Wound Gasket dia.16"- ANSI 300# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Spiral Wound Gasket dia.14"- ANSI 300# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Spiral Wound Gasket dia.12"- ANSI 300# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Spiral Wound Gasket dia.6"- ANSI 300# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Spiral Wound Gasket dia.1"- ANSI 300# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Stud Bolt & Nut M33 x L. min. 200 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Stud Bolt & Nut M30 x L. min. 185 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Stud Bolt & Nut M20 x L. min. 120 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Stud Bolt & Nut M16 x L. min. 90 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Fit-up & welding pipe dia.18" A106 Gr.B Sch.80
Fit-up & welding pipe dia.16" A106 Gr.B Sch.80
Fit-up & welding pipe dia.14" A106 Gr.B Sch.80
Fit-up & welding pipe dia.6" A106 Gr.B Sch.80
Fit-up & welding pipe dia.1" A106 Gr.B Sch.80
Fit-up & welding flange dia.16" A105 ANSI 300# WN RF Neck Sch.80
Fit-up & welding flange dia.14" A105 ANSI 300# WN RF Neck Sch.80
Fit-up & welding flange dia.6" A105 ANSI 300# WN RF Neck Sch.80
Fit-up & welding flange dia.1" A105 ANSI 300# WN RF Neck Sch.80
Fit-up & welding elbow dia.16" A234 WPB (SML) Sch.80 BE
Fit-up & welding elbow dia.14" A234 WPB (SML) Sch.80 BE
Fit-up & welding straight tee dia.16" x 16" A234 WPB (SML) Sch.80 BE
Fit-up & welding reducing tee dia.18" x 14" A234 WPB (SML) Sch.80 BE
Fit-up & welding reducing tee dia.18" x 12" A234 WPB (SML) Sch.80 BE
Fit-up & welding weldolet dia.1" A105 CL.3000 LB
Install pipe dia.18" Sch.80 on support/piping system/piping interface existing
Install pipe dia.16" Sch.80 on support/piping system/piping interface existing
Install pipe dia.14" Sch.80 on support/piping system/piping interface existing
Install pipe dia.6" Sch.80 on support/piping system/piping interface existing
Install blind flange dia.12" ANSI 300# on support/piping system/piping interface existing
Install Valves dia.16" - ANSI 300# on support/piping system/piping interface existing
Install Valves dia.14" - ANSI 300# on support/piping system/piping interface existing
Install Valves dia.6" - ANSI 300# on support/piping system/piping interface existing
Install Valves dia.1" - ANSI 300# on support/piping system/piping interface existing

Volume Satuan
8
8
8
4
2
4
4
2
2
2
4
4
2
2
2
2
4
2
8
8
8
8
4
160
160
32
16
4
12
4
12
6
8
8
8
4
4
4
2
2
2
4
12
24
12
24
2
2
2
2
4

pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
Ttk
Ttk
Ttk
Ttk
Ttk
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
m-run
m-run
m-run
m-run
pcs
pcs
pcs
pcs
pcs

Upah

Alat & Bahan Habis

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

JUMLAH HARGA (Rp)


Material
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Upah

Alat & Bahan Habis

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
JUMLAH II.B

C. Process Piping Class 150#


1 Pipe dia.12" ASTM A106 Gr.B Sch.40 BE x L.6000 mm
2 Pipe dia.10" ASTM A106 Gr.B Sch.40 BE x L.6000 mm
3 Pipe dia.8" ASTM A106 Gr.B Sch.40 BE x L.6000 mm
4 Pipe dia.6" ASTM A106 Gr.B Sch.40 BE x L.6000 mm
5 Pipe dia.4" ASTM A106 Gr.B Sch.40 BE x L.6000 mm
6 Pipe dia.3" ASTM A106 Gr.B Sch.40 BE x L.6000 mm
7 Pipe dia.6" ASTM A106 Gr.B Sch.80 BE x L.6000 mm
8 Pipe dia.4" ASTM A106 Gr.B Sch.80 BE x L.6000 mm
9 Pipe dia.3" ASTM A106 Gr.B Sch.80 BE x L.6000 mm
10 Pipe dia.2" ASTM A106 Gr.B Sch.80 BE x L.6000 mm
11 Pipe dia.'' ASTM A106 Gr.B Sch.80 PE x L.6000 mm

/222336130.xls.ms_office/BQ rev.01/

4
2
16
50
2
1
55
6
35
6
1

jts
jts
jts
jts
jts
jts
jts
jts
jts
jts
jts

x
x
x
x
x
x
x
x
x
x
x

x
x
x
x
x
x
x
x
x
x
x

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

x
x
x
x
x
x
x
x
x
x
x

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
x
x
x
x
x
x
x
x
x
x
x

Material

TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

4 of 17

VOLUME PEKERJAAN (BQ)


UPGRADING SP. SUBANG
SCOPE OF WORK MECHANICAL & PIPING
Rev.01

HARGA SATUAN (Rp)


No.

U R A I A N PEKERJAAN
12
13
14
15
16
17
18
19
20
21
16
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75

Flange dia.12" ASTM A105 ANSI 150# WN RF Neck Sch.40, ASME B.16.5
Flange dia.10" ASTM A105 ANSI 150# WN RF Neck Sch.40, ASME B.16.5
Flange dia.8" ASTM A105 ANSI 150# WN RF Neck Sch.40, ASME B.16.5
Flange dia.6" ASTM A105 ANSI 150# WN RF Neck Sch.40, ASME B.16.5
Flange dia.4" ASTM A105 ANSI 150# WN RF Neck Sch.40, ASME B.16.5
Flange dia.3" ASTM A105 ANSI 150# WN RF Neck Sch.40, ASME B.16.5
Flange dia.6" ASTM A105 ANSI 150# WN RF Neck Sch.80, ASME B.16.5
Flange dia.4" ASTM A105 ANSI 150# WN RF Neck Sch.80, ASME B.16.5
Flange dia.3" ASTM A105 ANSI 150# WN RF Neck Sch.80, ASME B.16.5
Flange dia.2" ASTM A105 ANSI 150# WN RF Neck Sch.80, ASME B.16.5
Blind Flange dia.4" ASTM A105 ANSI 150# RF, ASME B.16.5
Elbow dia.12" - 90 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Elbow dia.12" - 45 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Elbow dia.10" - 90 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Elbow dia.10" - 45 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Elbow dia.8" - 90 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Elbow dia.8" - 45 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Elbow dia.6" - 90 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Elbow dia.6" - 45 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Elbow dia.4" - 90 deg. ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Elbow dia.6" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Elbow dia.6" - 45 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Elbow dia.4" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Elbow dia.4" - 45 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Elbow dia.3" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Elbow dia.3" - 45 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Elbow dia.2" - 90 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Elbow dia.2" - 45 deg. ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Straight tee dia.12" x 12" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Straight tee dia.10" x 10" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Straight tee dia.8" x 8" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Straight tee dia.6" x 6" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Straight tee dia.4" x 4" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Reducing tee dia.12" x 8" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Reducing tee dia.10" x 6" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Reducing tee dia.8" x 6" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Reducing tee dia.6" x 4" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Reducing tee dia.6" x 4" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Reducing tee dia.6" x 3" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Reducing tee dia.4" x 2" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Reducing tee dia.3" x 2" ASTM A234 WPB (SML) Sch.80 BE, ASME B.16.9
Eccentric reducer dia.4" x 3" ASTM A234 WPB (SML) Sch.40 BE, ASME B.16.9
Full coupling dia. '' ASTM A105 SW 3000 LB, ASME B16.11
Weldolet dia. '' ASTM A105 SW 3000 LB, ASME B16.11
Elbow dia. '' ASTM A105 SW 3000 LB, ASME B16.11
Nipple dia.'' ASTM A106 Gr.B Sch.40 x L.150 mm Plain One End (POE) x Thread One End
Ball Valve dia.12"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
Ball Valve dia.10"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
Ball Valve dia.8"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
Ball Valve dia.6"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
Ball Valve dia.4"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
Ball Valve dia.3"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
Ball Valve dia.2"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
Gate Valve dia.4" - ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-003 Rev.01
Gate Valve dia.'' - CL.800 as per datasheet doc.no. 116639-11-PP-02-DS-003 Rev.01
Check Valve dia.3"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
Y-Strainer dia.4" - ANSI 150# RF ASTM A216 WCB Body, SS.316L Mesh 40 Strainer Element
Spiral Wound Gasket dia.12"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Spiral Wound Gasket dia.10"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Spiral Wound Gasket dia.8"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Spiral Wound Gasket dia.6"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Spiral Wound Gasket dia.4"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Spiral Wound Gasket dia.3"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Spiral Wound Gasket dia.2"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Stud Bolt & Nut M24 x L. min. 135 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01

/222336130.xls.ms_office/BQ rev.01/

Volume Satuan
8
6
8
10
24
2
4
10
12
12
2
4
4
2
2
8
4
10
4
2
16
6
6
4
12
8
4
4
2
2
2
2
3
2
2
2
2
2
4
4
4
2
10
10
8
10
2
2
2
2
2
2
4
3
10
2
2
8
6
8
14
34
14
12
96

pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs

Upah

Alat & Bahan Habis

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

JUMLAH HARGA (Rp)


Material
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Upah

Alat & Bahan Habis

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

Material

TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5 of 17

VOLUME PEKERJAAN (BQ)


UPGRADING SP. SUBANG
SCOPE OF WORK MECHANICAL & PIPING
Rev.01

HARGA SATUAN (Rp)


No.

U R A I A N PEKERJAAN
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140

Stud Bolt & Nut M24 x L. min. 125 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Stud Bolt & Nut M20 x L. min. 120 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Stud Bolt & Nut M20 x L. min. 110 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Stud Bolt & Nut M16 x L. min. 90 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
Fit-up & welding pipe dia.12" A106 Gr.B Sch.40
Fit-up & welding pipe dia.10" A106 Gr.B Sch.40
Fit-up & welding pipe dia.8" A106 Gr.B Sch.40
Fit-up & welding pipe dia.6" A106 Gr.B Sch.40
Fit-up & welding pipe dia.4" A106 Gr.B Sch.40
Fit-up & welding pipe dia.3" A106 Gr.B Sch.40
Fit-up & welding pipe dia.6" A106 Gr.B Sch.80
Fit-up & welding pipe dia.4" A106 Gr.B Sch.80
Fit-up & welding pipe dia.3" A106 Gr.B Sch.80
Fit-up & welding pipe dia.2" A106 Gr.B Sch.80
Fit-up & welding flange dia.12" A105 ANSI 150# WN RF Neck Sch.40
Fit-up & welding flange dia.10" A105 ANSI 150# WN RF Neck Sch.40
Fit-up & welding flange dia.8" A105 ANSI 150# WN RF Neck Sch.40
Fit-up & welding flange dia.6" A105 ANSI 150# WN RF Neck Sch.40
Fit-up & welding flange dia.4" A105 ANSI 150# WN RF Neck Sch.40
Fit-up & welding flange dia.3" A105 ANSI 150# WN RF Neck Sch.40
Fit-up & welding flange dia.6" A105 ANSI 150# WN RF Neck Sch.80
Fit-up & welding flange dia.4" A105 ANSI 150# WN RF Neck Sch.80
Fit-up & welding flange dia.3" A105 ANSI 150# WN RF Neck Sch.80
Fit-up & welding flange dia.2" A105 ANSI 150# WN RF Neck Sch.80
Fit-up & welding elbow dia.12" A234 WPB (SML) Sch.40 BE
Fit-up & welding elbow dia.10" A234 WPB (SML) Sch.40 BE
Fit-up & welding elbow dia.8" A234 WPB (SML) Sch.40 BE
Fit-up & welding elbow dia.6" A234 WPB (SML) Sch.40 BE
Fit-up & welding elbow dia.4" A234 WPB (SML) Sch.40 BE
Fit-up & welding elbow dia.6" A234 WPB (SML) Sch.80 BE
Fit-up & welding elbow dia.4" A234 WPB (SML) Sch.80 BE
Fit-up & welding elbow dia.3" A234 WPB (SML) Sch.80 BE
Fit-up & welding elbow dia.2" A234 WPB (SML) Sch.80 BE
Fit-up & welding straight tee dia.12" x 12" A234 WPB (SML) Sch.40 BE
Fit-up & welding straight tee dia.10" x 10" A234 WPB (SML) Sch.40 BE
Fit-up & welding straight tee dia.8" x 8" A234 WPB (SML) Sch.40 BE
Fit-up & welding straight tee dia.6" x 6" A234 WPB (SML) Sch.40 BE
Fit-up & welding straight tee dia.4" x 4" A234 WPB (SML) Sch.40 BE
Fit-up & welding reducing tee dia.12" x 8" A234 WPB (SML) Sch.40 BE
Fit-up & welding reducing tee dia.10" x 6" A234 WPB (SML) Sch.40 BE
Fit-up & welding reducing tee dia.8" x 6" A234 WPB (SML) Sch.40 BE
Fit-up & welding reducing tee dia.6" x 4" A234 WPB (SML) Sch.80 BE
Fit-up & welding reducing tee dia.6" x 4" A234 WPB (SML) Sch.40 BE
Fit-up & welding reducing tee dia.6" x 3" A234 WPB (SML) Sch.80 BE
Fit-up & welding reducing tee dia.4" x 2" A234 WPB (SML) Sch.80 BE
Fit-up & welding reducing tee dia.3" x 2" A234 WPB (SML) Sch.80 BE
Fit-up & welding eccentric reducer dia.4" x 3" A234 WPB (SML) Sch.40 BE
Fit-up & welding full coupling dia.'' A105 SW 3000 LB
Fit-up & welding weldolet dia.'' A105 SW 3000 LB
Fit-up & welding elbow dia.'' A105 SW 3000 LB
Install pipe dia.12" Sch.40 on support/piping system/piping interface existing
Install pipe dia.10" Sch.40 on support/piping system/piping interface existing
Install pipe dia.8" Sch.40 on support/piping system/piping interface existing
Install pipe dia.6" Sch.40 on support/piping system/piping interface existing
Install pipe dia.4" Sch.40 on support/piping system/piping interface existing
Install pipe dia.3" Sch.40 on support/piping system/piping interface existing
Install pipe dia.6" Sch.80 on support/piping system/piping interface existing
Install pipe dia.4" Sch.80 on support/piping system/piping interface existing
Install pipe dia.3" Sch.80 on support/piping system/piping interface existing
Install pipe dia.2" Sch.80 on support/piping system/piping interface existing
Install Valves dia.12" - ANSI 150# on support/piping system/piping interface existing
Install Valves dia.10" - ANSI 150# on support/piping system/piping interface existing
Install Valves dia.8" - ANSI 150# on support/piping system/piping interface existing
Install Valves dia.6" - ANSI 150# on support/piping system/piping interface existing
Install Valves dia.4" - ANSI 150# on support/piping system/piping interface existing

/222336130.xls.ms_office/BQ rev.01/

Volume Satuan
72
144
32
156
8
4
32
100
4
2
110
18
105
12
8
6
8
10
24
2
26
10
12
12
8
4
12
14
2
6
16
20
8
2
2
2
2
3
2
2
2
2
2
4
4
4
2
10
10
8
24
12
96
300
12
6
330
36
210
36
2
2
2
2
5

pcs
pcs
pcs
pcs
Ttk
Ttk
Ttk
Ttk
Ttk
Ttk
Ttk
Ttk
Ttk
Ttk
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
m-run
m-run
m-run
m-run
m-run
m-run
m-run
m-run
m-run
m-run
pcs
pcs
pcs
pcs
pcs

Upah

Alat & Bahan Habis

x
x
x
x

x
x
x
x
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

JUMLAH HARGA (Rp)


Material
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

Upah

Alat & Bahan Habis

x
x
x
x

x
x
x
x
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Material

TOTAL
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

6 of 17

VOLUME PEKERJAAN (BQ)


UPGRADING SP. SUBANG
SCOPE OF WORK MECHANICAL & PIPING
Rev.01

HARGA SATUAN (Rp)


No.

U R A I A N PEKERJAAN
141
142
143
144
144

Install Valves dia.3" - ANSI 150# on support/piping system/piping interface existing


Install Valves dia.2" - ANSI 150# on support/piping system/piping interface existing
Install valves dia.'' - ANSI 150# on support/piping system/piping interface existing
Install Y-Strainer dia.4" - ANSI 150# on support/piping system/piping interface existing
Install Blind Flange dia.4" - ANSI 150# RF

Volume Satuan
4
4
10
2
2

pcs
pcs
pcs
pcs
pcs

2
2
20
6
3
2
6
2
12
8
16
8
6
10
2
12
8
8
2
3
8
2
6
40
4
40
2
6
20
24
6
10
2
14
2
12
8
12
120
36
2
3
8
2

jts
jts
jts
jts
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
Ttk
Ttk
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
m-run
m-run
m-run
pcs
pcs
pcs
pcs

Upah

Alat & Bahan Habis


0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

JUMLAH HARGA (Rp)


Upah

Material
x
x
x
x
x
JUMLAH II.C

D. Utilities Piping
1 Pipe dia.4" ASTM A53 Gr.B ERW Sch.40 BE x L.6000 mm
2 Pipe dia.3" ASTM A53 Gr.B ERW Sch.40 BE x L.6000 mm
3 Pipe dia.2" ASTM A53 Gr.B ERW Sch.40 BE x L.6000 mm
4 Pipe dia.'' ASTM A106 Gr.B Sch.80 PE x L.6000 mm
5 Flange dia.4" ASTM A105 ANSI 150# SO RF, ASME B.16.5
6 Flange dia.3" ASTM A105 ANSI 150# SO RF, ASME B.16.5
7 Flange dia.2" ASTM A105 ANSI 150# SO RF, ASME B16.5
8 Blind flange dia.2" ASTM A105 ANSI 150# RF, ASME B.16.5
9 Elbow dia.2" - 90 deg. ASTM A234 WPB Sch.40 BE, ASME B16.9
10 Elbow dia.2" - 45 deg. ASTM A234 WPB Sch.40 BE, ASME B16.9
11 Elbow dia.'' - 90 deg. ASTM A105 SW 3000 LB, ASME B16.11
12 Elbow dia.'' - 45 deg. ASTM A105 SW 3000 LB, ASME B16.11
13 Straight tee dia.2" x 2" ASTM A234 WPB Sch.40 BE, ASME B16.9
14 Straight tee dia.'' x '' ASTM A105 SW 3000 LB, ASME B16.11
15 Concentric reducer dia.3" x 2" ASTM A234 WPB Sch.40 BE, ASME B16.9
16 Full coupling dia. '' ASTM A105 SW 3000 LB, ASME B16.11
17 Weldolet dia. '' ASTM A105 SW 3000 LB, ASME B16.11
18 Nipple dia.'' ASTM A106 Gr.B Sch.40 x L.150 mm Plain One End (POE) x Thread One End
19 Gate Valve dia.3"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-003 Rev.01
20 Gate Valve dia.2"- ANSI 150# as per datasheet doc.no. 116639-11-PP-02-DS-003 Rev.01
21 Gate Valve dia.'' - CL.800 as per datasheet doc.no. 116639-11-PP-02-DS-003 Rev.01
22 Spiral wound gasket dia.3"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
23 Spiral wound gasket dia.2"- ANSI 150# refers to doc.no. 116639-11-PP-02-GS-001 Rev.02
24 Stud Bolt & Nut M16 x L. min. 90 mm refers to doc.no. 116639-11-PP-02-GS-001 Rev.01
25 Fit-up & welding pipe dia.3" A53 Gr.B Sch.40
26 Fit-up & welding pipe dia.2" A53 Gr.B Sch.40
27 Fit-up & welding flange dia.3" A105 ANSI 150# SO RF
28 Fit-up & welding flange dia.2" A105 ANSI 150# SO RF
29 Fit-up & welding elbow dia.2" A234 WPB Sch.40 BE
30 Fit-up & welding elbow dia.'' A105 SW 3000 LB
31 Fit-up & welding straight tee dia.2" x 2" A234 WPB Sch.40 BE
32 Fit-up & welding straight tee dia.'' x '' ASTM A105 SW 3000 LB
33 Fit-up & welding concentric reducer dia.3" x 2" A234 WPB Sch.40 BE
34 Fit-up & welding elbow dia.'' A105 SW 3000 LB
35 Fit-up & welding concentric reducer dia.3" x 2" A234 WPB Sch.40 BE
36 Fit-up & welding full coupling dia.'' A105 SW 3000 LB
37 Fit-up & welding weldolet dia.'' A105 SW 3000 LB
38 Install pipe dia. 3" Sch.40 on support/piping system/piping interface existing
39 Install pipe dia. 2" Sch.40 on support/piping system/piping interface existing
40 Install pipe dia. '' Sch.80 on support/piping system/piping interface existing
41 Install valves dia.3" - ANSI 150# on support/piping system/piping interface existing
42 Install valves dia.2" - ANSI 150# on support/piping system/piping interface existing
43 Install valves dia.'' - ANSI 150# on support/piping system/piping interface existing
44 Install Blind Flanges dia.2" - ANSI 150# on piping system/piping interface existing

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

/222336130.xls.ms_office/BQ rev.01/

1
1
1
1
1

Ls
pcs
pcs
pcs
Ls

Ttk

0.00

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

0.00
0.00

0.00
0.00

x
x

0.00
x
x
0.00
0.00

0.00

0.00

0.00

x
x

0.00

x
x

0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

JUMLAH II.D
JUMLAH II (A+B+C+D)
III Paket Pekerjaan Hot Tapping
1 Dokumen teknis (hot tap procedure, WPS & PQR's, etc) including MIGAS Approval
2 Split tee 10" x 6" Class 300# mat'l Carbon Steel
3 Ball Valve dia.6"- ANSI 300# as per datasheet doc.no. 116639-11-PP-02-DS-001 Rev.01
4 Fit-up & welding split tee 10" x 6" Class 300#
5 Non Destructive Examination (NDE)
Hot tapping operation 10" x 6" class 300# including hot tap machine, hot tapping specialist, hot
6
tapping operator, scafolding, others tools and any supporting required.

Alat & Bahan Habis


0.00
0.00
0.00
0.00
0.00

Material

0.00
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00

TOTAL

x
x
x
x
x

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

0.00
x
x
0.00
0.00

x
x

0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00
0.00

7 of 17

VOLUME PEKERJAAN (BQ)


UPGRADING SP. SUBANG
SCOPE OF WORK MECHANICAL & PIPING
Rev.01

HARGA SATUAN (Rp)


No.

U R A I A N PEKERJAAN

Volume Satuan

Upah

Alat & Bahan Habis

JUMLAH HARGA (Rp)


Material

Upah

JUMLAH III
IV Non Destructive Examination (NDE) Untuk Sistem Perpipaan
1 Radiograpy Test, Film 4" x 15"
Gamma Ray, including proses lab. RT personil terdiri dari RT Level II @ 1 orang, RT Level I @ 1
orang, helper @ 1 orang, report, transportasi & akomodasi personil.
2 Radiograpy Test, Film 4" x 10"
Gamma Ray, including proses lab. RT personil terdiri dari RT Level II @ 1 orang, RT Level I @ 1
orang, helper @ 1 orang, report, transportasi & akomodasi personil.
3 Dye Penetran Test, including report,
a. PT ASNT Level I @ 1 orang
b. PT ASNT Level II @ 1 orang
c. PT Chemical Set (Cleaner, Penetrant, Developer)

Alat & Bahan Habis


0.00

0.00

Material

TOTAL
0.00

0.00

500

sheet

0.00

0.00

0.00

0.00

0.00

1000

sheet

0.00

0.00

0.00

0.00

0.00

2
2
6

HO
HO
set

0.00

x
x
x

0.00

x
x
x

0.00
0.00
0.00

0.00
0.00

x
x

0.00
0.00

x
x

Jumlah IV

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

V Pengecatan Sistem Perpipaan, termasuk material pengecatan.


1
2
3
4
5
6
7
8
9
10
11
12

Pipe dia.20", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.5


Pipe dia.16", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.5
Pipe dia.14", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.5
Pipe dia.12", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.5
Pipe dia.10", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.5
Pipe dia.8", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.5
Pipe dia.6", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.5
Pipe dia.4", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.5
Pipe dia.3", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.5
Pipe dia.2", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.5
Pipe dia.1", refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.5
Pipe dia.'', refers to doc.no. 116639-11-GN-00-GS-001 Standard Pengecatan, PS Group No.5

50
50
50
75
20
120
700
75
250
175
50
50

m-run
m-run
m-run
m-run
m-run
m-run
m-run
m-run
m-run
m-run
m-run
m-run

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

x
x
x
x
x
x
x
x
x
x
x
x
Jumlah V

x
x
x
x
x
x
x
x
x
x
x
x

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

VI Heavy Mobile Equipment untuk kegiatan konstruksi di lapangan.


1
2

Mobile crane capacity min.35 Ton including mobilisasi & demolisasi, certified crane operator &
rigger, fuel (BBM) @ 1 unit
Mobile truck, including driver, fuel @ 1 unit

240

jam-alat

0.00

0.00

0.00

0.00

240

jam-alat

0.00

0.00

0.00

0.00

0.00

0.00

Jumlah VI

0.00
0.00
0.00

0.00

VII Hydrostatic test, flushing & purging untuk sistem perpipaan


1
2
3
4
5
6
7
8
9
10

Air (fresh water)


Nitrogen (N2) Gas 99.999% @7 m3
Temporary gasket, blind plate dan consumables lainnya
Piping Supervisor @ 1 orang
QA/QC Engineer @ 1 orang
Pipe Fitter @ 2 orang
Helper @ 2 orang
Pressure regulator, tubing & accesories @ 2 set
Alat kerja bongkar pasang valve & accesories @ 2 set
Pressure chart recorder & pressure gauge @ 2 set

25
50
1
14
14
28
28
28
28
28

m
tube
Ls
hari-orang
hari-orang
hari-orang
hari-orang
hari-alat
hari-alat
hari-alat

1
1
1

Ls
Ls
Ls

x
x
x

0.00
0.00
0.00
0.00
0.00
0.00
0.00

x
x
x

x
x
x
x
0.00
0.00
0.00

x
x
x
x
x
x
x
x
x
x
Jumlah VII

x
x
x
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
x
x

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00

x
x
x
x
x
x
x
x
x
x

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

VIII Sertifikasi Kelayakan Pengunaan Peralatan (SKPP)


1
2
3

Slope Tank/FWKO Tank @ 1 unit


Dry Air Receiver Drum Tag.No. 2-11-D31 @ 1 unit
Flare KO Drum (Closed Drain Vessel) Tag. No. 2-11-D26 @ 1 unit

0.00
0.00
0.00

0.00
0.00
0.00

x
x
x
Jumlah VIII

TOTAL (I + II + III + IV + V + VI + VII + VIII), Rp

/222336130.xls.ms_office/BQ rev.01/

0.00
0.00

0.00
0.00

x
x
x

0.00
0.00
0.00
0.00

0.00

0.00

0.00

8 of 17

ESTIMASI BIAYA INSTRUMENTASI


PEKERJAAN UP GRADING SP SUBANG

NO

URAIAN PEKERJAAN

Instrument c/w fitting, tubing & other accessories


(as per hook-up document)
a. Pressure Safety Valve
b. Level Glass for vessel
c. Level Transmitter for vessel (float/displacer type)
d. Level Indicator For Tank (float type)
e. Level Transmitter for Tank (float Type)
f. Pressure Indicator
g. Pressure Transmitter
h. Temperature Indicator
i. Temperature Transmitter
j. Breather Valve
k. Foam Chamber
l. Flame Detector
m. Gas Detector

Junction Box c/w terminal block, cable gland, support, name plate,
bounding & grounding, and other accessories
a. Analog junction Box (12 analog signal)
b. Analog junction Box (24 analog signal)
c. Digital Junction box (36 digital signal)

Air Instrument Connection c/w male/female connector double ferrule,


Union connector, union tee, tube plug, dll. ASTM A182, 316SS.
a. 3/4" OD, 0,049'WT, Tubing SMLS fully annalead, ASTM A269, 316SS
b. 1/2" OD, 0,049'WT, Tubing SMLS fully annalead, ASTM A269, 316SS

Instrument cable (as per cable specification)


c/w cable marker, cable lug, cable ties, and other accessories.
a. Instrument Cable 1 PR x 1,5 mm2, Armoure,

/222336130.xls.ms_office/BOQ Inst rev 1/

VOLUME
SATUAN

1.00
2.00
2.00
1.00
1.00
3.00
3.00
3.00
3.00
1.00
2.00
2.00
2.00

HARGA SATUAN (Rp)


JASA
MATERIAL

JUMLAH HARGA (Rp)


JASA
MATERIAL

TOTAL HARGA
(Rp)

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3.00 Unit
1.00 Unit
1.00 Unit

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

20.00
60.00

m'
m'

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

500.00

m'

0.00

0.00

0.00

0.00

0.00

9 of 17

ESTIMASI BIAYA INSTRUMENTASI


PEKERJAAN UP GRADING SP SUBANG

NO

URAIAN PEKERJAAN

b. Instrument Cable 2 PR x 1,5 mm2, Armoure,


c. Instrument Cable 12 PR x 1,5 mm2, Armoure,
d. Grounding Cable, 10 mm2

Cable Ladder/Tray, support


a. Perforated cable tray, steel hotdip galvanized finished, ASTM A123,
c/w reducer, riser, tee, splice plate, cover plate, clamp cover,
grounding, bolt and nut, dll
- ukuran 100 (W) x 100 (D)
- ukuran 100 (W) x 50 (D)
b. Perforated cable ladder, steel hotdip galvanized finished, ASTM A123,
c/w reducer, riser, tee, splice plate, cover plate, clamp cover,
grounding, bolt and nut, dll
- ukuran 300 (W) x 150 (D)
- ukuran 150 (W) x 150 (D)
c. Conduit, rigid steel hotdip, galvanized finished c/w bushing & Locknut,
sadle/clamp,dsb
- ukuran 2" @
- ukuran 1"
d. Instrument stancion

VOLUME
SATUAN

HARGA SATUAN (Rp)


JASA
MATERIAL

JUMLAH HARGA (Rp)


JASA
MATERIAL

TOTAL HARGA
(Rp)

200.00
1,500.00
100.00

m'
m'
m'

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

25.00
50.00

m'
m'

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

50.00
700.00

m'
m'

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

10.00 pcs
10.00 pcs
7.00 pcs

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Pemprograman HMI dan DCS

1.00

Ls

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

Sertifikasi peralatan

1.00

Ls

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

TOTAL BIAYA PEKERJAAN

/222336130.xls.ms_office/BOQ Inst rev 1/

10 of 17

BILL OF QUANTITY
PEKERJAAN ELECTRICAL "PEMBANGUNAN SP SUBANG"
Rev 1
NO

URAIAN PEKERJAAN

PANEL DISTRIBUSI UTAMA &PANEL PENERANGAN


a. Panel ( 80x60x30 )cm, IP42,RAL 7035
Thk 1,5mm, c/w Accesoriess
b. Pasang dan Instalasi Panel ( 60x40x25 )cm, IP42,RAL 7035
Thk 1,5mm, c/w Accesoriess
c. Indicator Lamp for Phase
d. Fuse 4A + Holder
e. Volt Meter
f. Ampere Meter
g. Copper Busbar
h. MCCB 100Amp, 3 Pole, 380V
i. Starter Motor 20 KW, star/delta
j. Starter Motor 5 KW, DOL
k. MCB 16 Amp 1 Phs, 220V, 10 KA
l. MCB 6 Amp 1 Phs, 220V, 10 KA
m. Local Control Station, 2 Push Button, explosion proof
n. Selector switch 2 posisi
o. Consumable kit (control cable, terminal block, cable lug, wire duct,
junction box, LOTO accessories, etc)

INSTALASI PENERANGAN SHELTER FIRE PUMP


Lampu TL 2 x36 Watt/220V Explotion Proof, Class 1 Div.2 +
a.
Saklar
b. Pasang Lampu TL 2 x36 Watt/220V, Class 1 Div.2
c. Conduit Pipe Galvanized 3/4" @ 6m
d. "TEE" Bahan Metal

INSTALASI PENERANGAN SHELTER CLOSED DRAIN PUMP


Lampu TL 2 x36 Watt/220V Explotion Proof, Class 1 Div.2 +
a.
Saklar
b. Pasang Lampu TL 2 x36 Watt/220V, Class 1 Div.2
c. Conduit Pipe Galvanized 3/4" @ 6m
d. "TEE" Bahan Metal

INSTALASI LAMPU SOROT


a. Lampu Sorot Explotion Proof 400Watt, class 1 div 2
b. Tiang Lampu Sorot 11 Mtr
c. Pondasi Tiang Lampu Sorot 1:2:3
d. Pasang stel besi beton
e. Mendirikan tiang lampu Sorot
f. Pemasangan armature lampu Sorot
g. MCB 4Amp /220V

INSTALASI PENGKABELAN
a. Kabel NYFGbY 3x4mm2
Gelar Kabel NYFGbY 3x4mm2
b. Kabel NYFGbY 4x10mm2
Gelar Kabel NYFGbY 4x10mm2
c. Kabel NYFGbY 4x4mm2

/222336130.xls.ms_office/BoQ Elect/

VOLUME
SATUAN

UPAH

HARGA SATUAN (Rp)


BAHAN/ALAT
MATERIAL

UPAH

JUMLAH HARGA (Rp)


BAHAN/ALAT

MATERIAL

TOTAL HARGA
(Rp)

1.00 Unit

1,948,000.00

0.00

0.00

1948000.00

1948000.00

1.00 Unit

0.00

0.00

0.00

0.00

0.00

3.00
3.00
1.00
1.00
1.00
1.00
2.00
2.00
6.00
4.00
4.00
2.00
1.00

X
X
X
X
X
X
0.00
0.00
X
X
0.00
X
X

X
X
X
X
X
X
X
X
X
X
X
X
X

52,500.00
0.00
230,000.00
360,000.00
0.00
989,500.00
2,500,000.00
850,000.00
141,500.00
141,500.00
536,000.00
96,500.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

157500.00
0.00
230000.00
360000.00
0.00
989500.00
5000000.00
1700000.00
849000.00
566000.00
2144000.00
193000.00
0.00

157500.00
0.00
230000.00
360000.00
0.00
989500.00
5000000.00
1700000.00
849000.00
566000.00
2144000.00
193000.00
0.00

0.00

0.00

14137000.00

14137000.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

2.00
2.00
2.00
1.00

2.00
2.00
2.00
1.00

Unit
Unit
Unit
Unit
Lot
Unit
Unit
Unit
Unit
Unit
Set
Unit
Lot

unit
titik
Btg
unit

unit
titik
Btg
unit

X
0.00
X
X

X
0.00
X
X

X
X
X
X

X
X
X
X

0.00
X
0.00
0.00

0.00
X
0.00
0.00

4.00
4.00
3.71
54.56
4.00
4.00
4.00

Unit
Unit
M
kg
Unit
titik
Unit

X
X
0.00
0.00
0.00
0.00
X

X
X
0.00
0.00
X
X
X

0.00
0.00
X
X
X
X
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

250.00
250.00
200.00
200.00
350.00

Mtr
Mtr
Mtr
Mtr
Mtr

X
0.00
X
0.00
X

X
X
X
X
X

0.00
X
0.00
X
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

11 of 17

BILL OF QUANTITY
PEKERJAAN ELECTRICAL "PEMBANGUNAN SP SUBANG"
Rev 1
NO

URAIAN PEKERJAAN
Gelar Kabel NYFGbY 4x4mm2
d. Galian Kabel
Urugan Pasir dengan Ukuran 0,1x0,5x(panjang kabel)m
Urugan Tanah
Batu Ampar 10 Cm X 24 Cm
e. Kabel NYY 2x2,5mm2
f. Galvanized Pipe (Crossing jalan) 6" @6M

PEMASANGAN PENANGKAL PETIR UTAMA


a. Air Terminal / preventer
b. Pemasangan Lightning Preventer
c. Ligthning Strike Counter
d. Termination Kit Upper/Lower
e. Tiang Penangkal Petir (Mounting Mast) 25 Meter,
f. Wire rope
g. Pondasi penangkal petir 1:2:3
h. Pasang stel besi beton
i. Pemasangan Tiang Penangkal Petir

GROUNDING PENANGKAL PETIR UTAMA


a. Grounding Rod dia 5/8" @3mtr
b. Rod Clamp
c. Rod Coupling
d. BC Cable 50 mm2
e. Pemasangan Grounding Rod 5/8" @ 3 meter
f. Pembuatan bak kontrol 40x40x40 cm/bh
g. Pengukuran Grounding system

GROUNDING SYSTEM PERALATAN DAN BONDING SYSTEM


a. BC Cable 95 mm2
b. BC Cable 50 mm2
c. Gelar kabel BC 50 mm2
d. Galian tanah
e. Gelar kabel BC 95 mm2
f Timbun kabel BC 95 mm2 dg tanah
g. Grounding Rod dia 5/8" @3mtr
h. Rod Clamp
i. Rod Coupling
j. Pemasangan Earth Steel Cooper Rod 5/8" @ 3 meter
k. Pembuatan bak kontrol 40x40x40 cm/bh
l. Conduit Pipe Galvanized 3/4" @ 6m
m. Conduit Clamp 3/4"
n. Pengukuran Grounding system
CATHODIC PROTECTION TANKI
a. Pemasangan Cathodic Protection tanki

/222336130.xls.ms_office/BoQ Elect/

UPAH

350.00
75.00
12.50
62.50
750.00
100.00
2.00

Mtr
M
M
M
Unit
Mtr
Btg

0.00
0.00
0.00
0.00
0.00
0.00
X

X
X
0.00
X
X
X
X

X
X
X
X
X
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.00
2.00
2.00
2.00
2.00
2.00
16.00
215.60
2.00

Unit
Unit
Unit
Set
Unit
Set
M
kg
Unit

X
0.00
X
X
X
X
0.00
0.00
0.00

X
X
X
X
X
X
0.00
0.00
X

0.00
X
0.00
0.00
0.00
0.00
X
X
X

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

6.00
2.00
4.00
20.00
2.00
2.00
2.00

Btg
Unit
Unit
Mtr
titik
Unit
Unit

X
X
X
0.00
X
0.00
0.00

X
X
X
X
X
0.00
0.00

0.00
0.00
0.00
0.00
0.00
X
X

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

200.00
100.00
100.00
60.00
200.00
60.00
12.00
4.00
8.00
4.00
4.00
6.00
8.00
4.00

Mtr
Mtr
Mtr
M
M
M
Btg
Unit
Unit
titik
Unit
Jts
Unit
Unit

X
X
0.00
0.00
0.00
0.00
X
X
X
0.00
0.00
X
X
0.00

X
X
X
X
X
0.00
X
X
X
X
0.00
X
X
0.00

0.00
0.00
X
X
X
X
0.00
0.00
0.00
X
X
0.00
0.00
X

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
14137000.00
1570.78

0.00
0.00
14137000.00
1570.78

1.00 Lot

HARGA SATUAN (Rp)


BAHAN/ALAT
MATERIAL

UPAH

JUMLAH HARGA (Rp)


BAHAN/ALAT

TOTAL HARGA
(Rp)

VOLUME
SATUAN

MATERIAL

12 of 17

BILL OF QUANTITY
PEKERJAAN SIPIL - UPGRADING SP SUBANG
Kabupaten Subang
NO

URAIAN PEKERJAAN

VOLUME

SAT

HARGA SATUAN
UPAH

Page 13 of 17

BAHAN

JUMLAH HARGA
UPAH

BAHAN

UPAH + BAHAN

BILL OF QUANTITY
PEKERJAAN SIPIL - UPGRADING SP SUBANG
Kabupaten Subang
URAIAN PEKERJAAN

NO

VOLUME

SAT

HARGA SATUAN
UPAH

BAHAN

Pekerjaan Persiapan

1
2

Mobilisasi & demobilisasi alat berat

2.00

unit

Pasang bouwplank dari kayu borneo

Pekerjaan sondir (cone penetration test) berikut mob demob. Setup


alat & pelaporan

10.00
1.00

m'
ls

II

Pekerjaan Bongkaran

1
2

Bongkar pasangan lantai

0.64

m2

Bongkar tembok atau pasangan bata


Bongkar pintu jendela (kusen, daun , ventilasi, aksesoris, dst)

0.30
1.00

m3
set

X
X

Bongkar pintu (kusen, daun , ventilasi, aksesoris, dst)

1.00

set

Bongkar jendela (kusen, daun , ventilasi, aksesoris, dst)


Bongkar closet / wastafel / urinoir berikut aksesoris

1.00
1.00

set
set

X
X

Bongkar pipa saluran air bersih / kotor


Bongkar plafond berikut rangka, listrik, dan aksesoris

1.00
0.64

m'
m2

X
X

JUMLAH

3
4
5
6
7
8
9

Bongkar atap / kanopi (berikut kuda-kuda, rangka, lisplank, talang,


aksesories, dst), volume dihitung sebagai luas datar

10.00

m2

10

Bongkar pasangan batu kali

0.40

m3

11

Bongkar / bobok beton bertulang


Bongkar / bobok beton tak bertulang
Bongkar besi-besi konstruksi untuk dipakai kembali

0.15
0.15

X
X

9.00

m3
m3
kg

10.00

m'

X
JUMLAH

0.13
0.13
0.13
0.13
0.13
0.13

m3
m3
m3
m3
m3
m3

X
X

40,000.00

m3

12
13
14

Bongkar pagar berikut rangka

Pekerjaan Galian & Urugan

III
1
2

Galian material
Urugan & perataan material ex-galian

3
4
5

Urugan
Urugan
Urugan
Urugan

6
7

pasir (s/d kondisi padat)


sirtu (s/d kondisi padat)
base coarse (s/d kondisi padat)
split 2/3 cm (hitam) (s/d kondisi padat)

Mendatangkan tanah dari luar gembur s/d lokasi pekerjaan

X
JUMLAH

IV

Pekerjaan Pasangan

1
2
3
4
5
6
7

Pasangan bata merah tebal 1/2 bata, 1Pc : 4Ps


Pasangan bata merah tebal 1/2 bata, 1Pc : 6Ps
Pasangan batu kali, 1Pc : 4Ps
Pasangan batu kali, 1Pc : 6Ps
Plesteran spesi 1Pc : 4Ps tebal 15 mm berikut aci
Plesteran spesi 1Pc : 6Ps tebal 15 mm berikut aci
Acian

8
9

Siaran spesi 1:4

10

2.00
2.00
0.40
0.40
4.00
4.00
4.00

m2
m2
m3
m3
m2
m2
m2

1.50
12.00

m2
m2

Pasang dinding keramik semua ukuran, warna, tekstur, & corak merk
Roman (termasuk apabila di variasi)

10.00

m2

11

Pasang plint keramik tinggi 10 cm merk Roman semua ukuran, warna,


tekstur, & corak (termasuk apabila di variasi)

2.00

m'

Pekerjaan Pintu dan Jendela

Pembuatan & pasang pintu besi baja termasuk las & cat, lengkap
berikut kusen (Kanal "C" 150.50.20.2,3), daun pintu (besi plat tb. 1,2
mm dua muka, rangka Kanal "C" 60.30.10.2,3), engsel besi, kunci /
kunci tanam, grandel, dan handle / holder

1.20

m2

Pasang pintu allumunium untuk kamar mandi lengkap berikut kusen,


daun pintu, engsel, kunci silinder, dan kunci selot

1.00

bh

Pembuatan dan pasang kusen / daun untuk pintu / jendela / ventilasi


alumunium warna berikut skonengan dan tali air, yi. :
Stel, pasang, dan sambung profil alumunium 4"
Stel, pasang, dan sambung profil alumunium "T"
Stel, pasang, dan sambung list alumunium lebar 10 cm
Pasang pelapis daun pintu dari teak wood tebal 4 mm double

5.00
3.60
0.10
1.60

m'
m'
m'
m2

5
6
7
8
9
10
11
12
13

Buat daun pintu rangka kayu kamper, dilapis teakwood dua muka

1.60
0.72
1.00
2.00
1.00
1.00
1.00
1.00
0.72

m2
m2
bh
bh
bh
bh
bh
bh
m2

VI

Pekerjaan Plafond

Pembuatan & pasang rangka langit - langit dari besi stall uk. min. 40 x
40 x 1 mm, sambungan konstruksi las, uk. grid maks. 60 x 60 cm,
berikut penggantung

0.64

m2

Pasang langit - langit gypsum board tb. 9 mm berikut merapihkan


sambungan/ nad

0.64

m2

Pasang langit - langit GRC tb. 4 mm berikut merapihkan sambungan/

0.64

m2

Pasang lantai/ step nosing keramik semua ukuran, warna, tekstur, &
corak merk Roman (termasuk apabila di variasi)

JUMLAH

a.
b.
c.
4

Pasang
Pasang
Pasang
Pasang
Pasang
Pasang
Pasang
Pasang

kaca bening tb. 5 mm berikut list karet


kunci merk ses lengkap
engsel kuningan
hak untuk jendela dan ventilasi
grendel untuk jendela dan ventilasi
door closer merk new star
door stoper
vertical blinds

JUMLAH

Page 14 of 17

JUMLAH HARGA
UPAH

BAHAN

UPAH + BAHAN

BILL OF QUANTITY
PEKERJAAN SIPIL - UPGRADING SP SUBANG
Kabupaten Subang
URAIAN PEKERJAAN

NO

VOLUME

SAT

HARGA SATUAN
UPAH

4
VII

Pasang list plafond gypsum lebar 10 cm

0.50

m'

Pengecatan kayu dengan politur 2 x cat sampai rata

1.60

m2

Pengecatan permukaan dinding/plafond lapisan baru (1 lapis plamir, 1


lapis cat dasar, 2 lapis cat penutup) sampai rata

2.00

m2

3
4

Pengecatan permukaan dengan Meni Kansai Paint / Zincromate


Pengecatan permukaan dengan F-Talit ( 2 x cat ) sampai rata
Pengecatan permukaan dengan cat alumunium Kansai Paint ( 2 x cat )
sampai rata
Waterproofing dengan aquaproof

0.40

m2

0.40
0.40

m2
m2

0.40

m2

6
VIII

JUMLAH

Pekerjaan Pengecatan

1
2

BAHAN

JUMLAH

Pekerjaan Atap
1.00

m2

800.00

m2

Pasang bubungan zincolume tb. 0.5 mm seluruh warna, tekstur


permukaan, profil, & model

40.00

m'

Pasang talang seng plat BJLS 30 lebar 90 cm berikut dudukan papan


kayu kruing tb. 2 cm dan cat meni

40.00

m'

Stel pasang kuda-kuda & rangka atap baja ringan Zincolume lengkap,
volume dihitung sebagai luas bidang datar

Pasang atap zincolume tb. 0.5 mm seluruh warna, tekstur permukaan,


profil, & model

3
4

IX

Pekerjaan Sanitair

1
2
3
4

Memasang closet duduk merk toto CW 420 / S 516 JPT lengkap

1.00

Memasang closet jongkok merk Toto type CE-7


Memasang urinoir merk toto type U-57 lengkap
Memasang wastafel merk Toto type LW 230 lengkap (shipon, flexible,
keran, tempat sabun cair, planchete stainless steel, cermin uk. 60x60
cm, dst.)

1.00
1.00
1.00

bh
bh
bh
bh

Pasang shower spray untuk closet merk toto type TX 403 S PIV
lengkap atau setara

1.00

bh

6
7

Memasang kran air merk San'ei type Y 20 C

1.00
1.00
1.00

bh

1.00

bh

JUMLAH

Memasang beltraf merk sansun


Buat septictank dari pasangan bata + plesteran lengkap dengan
penyekat dan tutup atas dari cor beton bertulang serta pembuangan
udara dari pipa galvanis 1,5" ujung T
Buat rembesan septictank dari batu kali dan ijuk lengkap dengan inlet
pipa PVC 4"

bh
bh

JUMLAH

Page 15 of 17

JUMLAH HARGA
UPAH

BAHAN

UPAH + BAHAN

BILL OF QUANTITY
PEKERJAAN SIPIL - UPGRADING SP SUBANG
Kabupaten Subang
URAIAN PEKERJAAN

NO

VOLUME

SAT

HARGA SATUAN
UPAH

X
1
2
3
4

Pekerjaan Pipa PVC


(berikut sambungan & sumbat apabila diperlukan)
Memasang pipa PVC tipe AW 3/4"

4.00

m'

Memasang pipa PVC tipe AW 1"


Memasang pipa PVC tipe AW 2"

4.00
4.00

m'
m'

Memasang pipa PVC tipe AW 3"

4.00
4.00

m'

Memasang pipa PVC tipe AW 4"

XI

Pekerjaan Buis Beton


(berikut sambungan apabila diperlukan)

Memasang & menyetel buis beton dia. 30 cm

Memasang & menyetel buis beton dia. 80 cm

XII

BAHAN

1.00
1.00

m'

JUMLAH

m'
m'

JUMLAH

Pekerjaan Perkuatan Lapisan Tanah

1
2

Pasang gedeg bambu


Pengadaan & instalasi Geotextile Non Woven 650 gr/m2 (warna

30.00
30.00

m2
m2

Pengadaan & instalasi geogrid uk. 35 x 35 mm 360 gr/m2


(termasuk overlap min. 30 cm di klem plastik dan angkur pemberat)

30.00

m2
JUMLAH

XIII

Pekerjaan Perkerasan

1
2
3
4
5

Pekerjaan berm berikut galian parit drainase (manual)


Ampar sirtu, padat (menggunakan A2B All In)
Ampar base coarse, padat (menggunakan A2B All In)
Ampar split 2/3 cm (hitam), padat (menggunakan A2B All In)
Ampar steenslaag 3/5 cm (hitam), padat (menggunakan A2B All In)

150.00
10,000.00
100.00
1,500.00
1,000.00

m2
m3
m3
m3
m3

6
7
8
9
10

Ampar steenslaag 5/7 cm (hitam), padat (menggunakan A2B All In)


Ampar batu 15/20 cm (hitam), padat (menggunakan A2B All in)
Penetrasi aspal tebal 4 cm, padat (alat berat All In)
Sheet aspal tebal 4 cm, padat (alat berat All In)
Kiicir aspal cair

1,000.00
100.00
400.00
400.00
40.00

m3
m3
m2
m2
m2

XIV
1
2
3

Pekerjaan Pancang
Pengadaan tiang pancang spun pile 40 cm @ 8 m' bottom (K.600)
Pengadaan tiang pancang spun pile 40 cm @ 8 m' middle (K.600)

JUMLAH

Pengadaan tiang pancang mini pile segitiga uk. 28 cm @ 6 m' (K450,


Tulangan 3D13 U-39, Spiral 6)

30.00
30.00
1.00

btg
btg
btg

480.00
4.00

m'
m'

X
X
X

4
5

Pancang spun pile / mini pile


Pancang dolken / bambu / pipa

XV

Pekerjaan Kayu

Pengadaan dolken 12 cm

4.00

m'

2
3
4

Pengadaan dolken 5 s/d 10 cm


Pengadaan bambu 10 cm
Pasang penggalang & perancah dolken

4.00
4.00
4.00

m'
m'
m'

X
X

XVI

Pekerjaan Pembesian

Pembesian dengan besi beton polos atau besi beton ulir termasuk
kawat beton

75,000.00

kg

Stel dan pasang konstruksi besi round bar (shear conector, handle,
dudukan bekisting, dst.)

0.89

kg

3
4
5
6
7
8
9
10

Stel
Stel
Stel
Stel
Stel
Stel
Stel
Stel

8.11
8.11
9.37
4.43
9.33
1.00
1.00
1.00

kg
kg
kg
kg
kg
m2
bh
bh

dan pasang konstruksi besi plat polos / bordes


dan pasang konstruksi besi grating plate
dan pasang konstruksi besi canal
dan pasang konstruksi besi siku
dan pasang konstruksi besi WF / H beam
& pasang wiremesh 6 mm
dan pasang angkur atau dynabold
dan pasang spansproef

Page 16 of 17

X
X
JUMLAH

X
JUMLAH

JUMLAH HARGA
UPAH

BAHAN

UPAH + BAHAN

BILL OF QUANTITY
PEKERJAAN SIPIL - UPGRADING SP SUBANG
Kabupaten Subang
URAIAN PEKERJAAN

NO

VOLUME

HARGA SATUAN

SAT

UPAH
11
12

Pasang angkur mur baud 3/4" berikut lubang


Pasang angkur mur baud 5/8" berikut lubang

13

Pengadaan, stel, & pasang multiplate pipe


Membersihkan besi dari karat menggunakan sikat baja dan ampelas

14

1.00
1.00

BAHAN

JUMLAH HARGA
UPAH

BAHAN

bh
bh

48.00

kg

0.40

m2
JUMLAH

XVII

Pekerjaan Las

Las potong

0.20

m'

Las sambung

0.40

m'
JUMLAH

XVIII

Pekerjaan Beton

Pasang bekisting dari multyplek tb 12 mm (rangka dari kayu borneo


ukuran 5/7 cm dan dilabur dengan oli bekas)

150.00

m2

Bongkar bekisting dan siram beton

150.00

m2

3
4

Gelar dan pasang plastik putih

0.06
520.00

m2
m3

Cor beton ready mix K 350 termasuk concrete vibrator (concrete pump
apabila diperlukan)

75.00

m3

6
7

Cor beton 1Pc : 2Ps : 3Sp


Cor beton 1Pc : 3Ps : 5Sp

50.00
40.00

m3
m3

Memotong beton dan mengisi celah beton dengan aspal cair.

9.00

m'

9
10

Membuat alur permukaan beton


Test kubus beton

0.06
1.00

m2
bh

100.00
45.00

m'
m2

30.00
45.00
45.00

m'
m2
m2

XIX

Cor beton ready mix K 225 termasuk concrete vibrator (concrete pump
apabila diperlukan)

X
X
JUMLAH

Pekerjaan Pagar

1
2

Pasang kawat duri, pemasangan harus kencang


Pasang pagar panel beton berikut tiang

3
4
5

Pengadaan kolom panel beton keadaan utuh (ukuran 20 x 18,5 cm).


Pengadaan pagar panel beton keadaan utuh ( tebal min. 8 cm).

XX

Pekerjaan Lain - Lain

1
2

Pasang drum ex oli untuk penahan tanah

3
4
5

Memotong rumput dan alang-alang


Menebang pohon

Pasang kawat harmonica gas BWG12 3 mm dan penjepit dari besi


beton 8 mm, berikut las, pemasangan harus kencang.

X
X
X

JUMLAH

Pasang bronjong dari kawat galvanis 4 mm dan batu belah disusun


padat dan rapih, berikut pompa air

Pasang karung plastik / goni diisi tanah dan dijahit dengan tali (tanah
setempat), berikut pompa air

2.04
0.50

m2
m3

5.00
3.00
0.50

m2
btg
m3

X
X

JUMLAH
XXI
1
2

Perapihan Bekas Kerja


Bongkar direksi keet
Administrasi, Perijinan, Laporan Monitoring Proyek, Dokumentasi,
Perapihan Bekas Kerja, dan Laporan Penyelesaian Pekerjaan

1.00
6.00

ls
ls

X
X
JUMLAH

TOTAL

Rp.

PEMBULATAN

Rp.

Terbilang :
(harga tidak termasuk PPN 10 %)

Page 17 of 17

UPAH + BAHAN

You might also like