22 CPM

Project Tool Critical pass method .

Schedule
23

Deliverable() .

Revamping

24 Work

PSV Sizing, Alarm & Trip scheduling, Operating Mannual, Rerouting Drainage, Pump
Foundation, Pipe Steep

25 Pipeline vs. Pipe

Pipeline (OSBL), Piping Plant

26 BOQ

Bill of Quantity

27 Contract

1) Fixed Price = Unit Price() = Reimbursable([i:])

28 (HEC )

, Arial, 11

2) Lump Sum Contract

: Q-ACE GJN, : BJN


29 (HEC )
-> PC Down -> -> ->
30 Project Space (HEC)

JABA

31 Transmittal

Project

1) ITB Clarification 2) MR issue

Deliverables

5) Engineering Cost

3) BOQ issue

4) Technical Proposal

32

Critical Path Method


33 CPM

- Critical Activity
- Example : Contract Award -> Basis Design -> MR -> Vendor Data -> etc.

34 Case Study

Case experience

35 Flow

Plot Plan -> ELP -> GAD -> Isometric Drawing (3D )

36 RFQ

Reguest For Quotation ()


1 Technical Proposal Commercial Proposal

37 Bid closing
NCC Project Bid closing Tech, Commercial Proposal
Technical Proposal

1) Engineering Procedure(Plan)
-> Plan Procedure

38
. (CJN, CJN)
2) IT ( )
14,000~15,000
39

80.5%, 10%,
Hard 3% . break down .
, Material Storage Building() .

40 Temporary Facilities

-> HDEC , (), Engineering


.
NCC Project 5

41 Start-up Assistance

-> 5 Fixed Lump Sum ,


5 per diem rate() , Rule .

Fixed Lump Sum vs.

Fixed Lump Sum( ) : , risk Contractor ,

Reimbursable

Reimbursable ( ) : basis, Contractor

42
Reimbursable
Fixed Lump Sum(LSTK=Lump sum Turn Key)
Index PM , 50% .

* CAR (Construction Assurance)

-> HDEC 4 , 1 Deliverables .

* EAR (Erection Assurance)

43 ITB workscope Index


-> ITB check ( develop) -> PR Item data List -> , ,
Load -> CV
, , , (Const), .