Construction costs for the pilot cycle track project will be incurred in two stages - the initial installation stage and the potential removal stage. The initial installation is estimated to cost $250,000 and include materials, signage and line painting. If the pilot project is not made permanent, the removal work is projected to cost $100,000 and involve dismantling structures and reinstating previous road configurations.
Construction costs for the pilot cycle track project will be incurred in two stages - the initial installation stage and the potential removal stage. The initial installation is estimated to cost $250,000 and include materials, signage and line painting. If the pilot project is not made permanent, the removal work is projected to cost $100,000 and involve dismantling structures and reinstating previous road configurations.
Construction costs for the pilot cycle track project will be incurred in two stages - the initial installation stage and the potential removal stage. The initial installation is estimated to cost $250,000 and include materials, signage and line painting. If the pilot project is not made permanent, the removal work is projected to cost $100,000 and involve dismantling structures and reinstating previous road configurations.