Sample WBSfor Oil, Gasand Petrochemical Project
Sample WBSfor Oil, Gasand Petrochemical Project
Sample WBSfor Oil, Gasand Petrochemical Project
4 B.5 B.6 B.7 C C.1 C.1.1 C.1.2 C.1.3 C.1.4 C.1.5 C.1.6 C.1.6.1 C.1.6.2 C.2 C.2.1 C.2.1.1 C.2.1.2 C.2.1.3 C.2.1.4 C.2.1.5 C.2.1.6 C.2.1.7 C.2.2 C.2.2.1 C.2.2.2 C.2.2.3 C.2.2.4 C.2.2.5 C.2.2.6 C.3 C.3.1 C.3.1.1 C.3.1.2 C.3.1.3 C.3.1.4 C.3.1.5
Description Engineering Project Engineering Process Engineering Piping Engineering Mechanical (Rotating) Engineering Mechanical (Static) Engineering Civil Engineering Structure Engineering Electrical Engineering Instrumentation Engineering Procurement Heat Exchanger/Air Fin Cooler Column/Towers Drums/Vessel Tankages Pump/Blower/Compressor Bulk Materials (i.e piping materials, control valves, electrical cables, lighting fixture, filed Instrument, Packages Construction Pre Construction Site development/Reclamation Roads,fencing and paving Water supply and drainage Piling Work Foundation Work Fabrication Work Pipe fabrication Steel fabrication(piperacks,platforms) Shutdown Furnace Area Piping tie-in work Equipment Work Electrical Work Instrumentation Work Insulation Work Fireproofing including refractory, brick lining Painting Compressor Area Piping tie-in Work Equipment Work Electrical Work Instrumentation Work Insulation Work Painting Work Major Construction Furnace Area Piping Installation including tie-in Steel Installation (Piperacks,platforms) Equipment Work Electrical Work Instrumentation Work
C.3.1.6 C.3.1.7 C.3.1.8 C.3.2 C.3.2.1 C.3.2.2 C.3.2.3 C.3.2.4 C.3.2.5 C.3.2.6 C.3.2.7 C.4 C.4.1 C.4.2
Insulation Work Fireproofing including refractory, brick lining Painting Compressor Area Piping Installation including tie-in Steel Installation (Piperacks,platforms) Equipment Work Electrical Work Instrumentation Work Insulation Work Painting Pre-commissioning Furnace Area Compressor Area