Professional Documents
Culture Documents
Steel Works: Tie Beams (TB - B)
Steel Works: Tie Beams (TB - B)
Steel Works: Tie Beams (TB - B)
L1 = 2.60/4 + 0.40 +
meters
L2 = (2.60 + 3.60)/4
5.85 meters
L3 = (3.60 + 3.60)/4
6.60 meters
L4 = (3.60 + 3.60)/4
6.60 meters
L5 = 3.60/4 + 0.40 +
meters
TOTAL: 27.60 meters
+ 0.40 = 1.95 X 3 =
+ 0.40 = 2.20 X 3 =
+ 0.40 = 2.20 X 3 =
0.25 = 1.55 X 3 = 4.65
STIRRUPS
14 pieces + 3 x 19 pieces = 71 pieces
71 pieces x 4 beams = 284
Factor: Beam Size (mm) 250 x 450
Length/Stirrup: 1.25 m
6 METER: 4 pieces
284/4 = 71 pieces
71 pieces 10 mm x 6.00 meters
GRID A TO D (2B 2)
STIRRUPS
14 pieces + 3 x 19 pieces = 71 pieces
71 pieces x 4 beams = 284
Factor: Beam Size (mm) 250 x 450
Length/Stirrup: 1.25 m
6 METER: 4 pieces
284/4 = 71 pieces
STIRRUPS
14 pieces + 3 x 19 pieces = 71 pieces
71 pieces x 4 beams = 284
Factor: Beam Size (mm) 200 x 250
Length/Stirrup: 0.828 m
6 METER: 7 pieces
284/7 = 40.57 pieces
41 pieces 10 mm x 6.00 meters
1.5125 X 2 = 3.025
= 1.925 X 2 = 3.85
= 1.925 X 2 = 3.85
1.5125 X 2 = 3.025
STIRRUPS
14 pieces + 2 x 19 pieces = 52 pieces
52 pieces x 5 beams = 260
Factor: Beam Size (mm) 200 x 250
Length/Stirrup: 0.828 m
6 METER: 7 pieces
260/7 = 37.14 pieces
38 pieces 10 mm x 6.00 meters
SECTION 1 TO 5 (4B 1)
STIRRUPS
14 pieces
14 pieces x 2 beams = 28
Factor: Beam Size (mm) 200 x 250
Length/Stirrup: 0.828 m
6 METER: 7 pieces
28/7 = 4 pieces
1.2625 X 3 = 3.7875
= 1.925 X 3 = 5.775
= 2.175 X 3 = 6.525
= 2.175 X 3 = 6.525
GRID A TO D (5B 2)
MAIN LONGITUDINAL BARS
4.35 + 0.45 = 4.80 x 6 bars = 28.80 meters
28.80 meters x 2 beams = 57.60 meters
10 pieces 20 mm x 6.00 meters
EXTRA BARS (TOP)
L1 = 3.65/4 + 0.60 = 1.5125
L2 = 3.65/4 + 0.60 = 1.5125
TOTAL: 3.025 meters
STIRRUPS
Total No. of Columns: 16 0.35 m x 0.35 m
Overall Height: 5.65 m
Size of Tie Bars: 10 mm @ 0.25 m 0.C.
No. of Ties per Column: 5.65/0.25 = 23 Ties
Overall Total No. of Ties: 23 x 16 = 368
Length/Stirrup: 1.328 m
6 METER: 4 pieces
368/4 = 92
92 pieces 10 mm x 6.00 meters
SLABS