Manufacturing and Delivery To Site Lead Times For Key Substation Items Like Power Transformers and High Voltage Switchgear Will Be Similar To Those For Significant Mechanical Items Like Turbines
In order for the prototype building process to start, we must first find all of the necessary parts needed to build it, and organize them.
2. Construct Chassis out of Vex
For our first prototypes, we constructed a chassis for them out of the available Vex parts based on previously discussed designs.
3. Customize Vex Metal Sheets
Our later prototypes needed custom pieces in order to maximize their utility, and as such we bent and cut certain Vex pieces in order to make them work.
4. Attach gears and servos for motion
After building the body, we needed to provide motion to the turrets and rovers, so we attached gears and motors.
5. Attach accessories ex. Camera
Being the surveillance system it is, we needed to add a camera to each for both control and surveillance. For the rover we added two Nerf guns, while we added an air compressor and barrel to the sentry turret.
6. Wiring and Programming
The last step in the process was wiring every system together, and programming them to a controller, and possibly program pre-set motions.
Manufacturing and Delivery To Site Lead Times For Key Substation Items Like Power Transformers and High Voltage Switchgear Will Be Similar To Those For Significant Mechanical Items Like Turbines