ACCOMPLISHMENT UP TO ELEVATION 13.

50M
Item of Works Width Length Height NO.of pcs Area Volume Total Uint
Conc topping 50mm 1.00 1.00 0.05 1 243.286 12.164 243.286 M2
17_2_1 concrete,100mm 1.00 1.00 0.10 1 243.286 24.329 243.286 M2
17_3_1 Foundation 1.00 1.00 1.35 1 235.062 317.334 317.334 M3
17_3_2 Columns 0.50 1.50 15.00 8 1.000 90.000 90.000 M3
17_3_3 Beams1 0.40 3.01 0.80 40 1.000 38.53 38.53
Beams2 0.25 5.72 0.80 6 1.000 6.86
Beams3(-1.50to+13.50) 0.20 5.07 0.55 2 1.115
Beams3(+1.50to+13.50) 0.20 6.01 0.55 8 5.289 13.264 M3
RC walls 0.25 2.80 2.20 7 10.765
RC walls 0.25 1.50 1.86 1 1.395
RC walls 0.25 4.78 1.55 4 1.852 14.012 M3
17_3_4 200mm thk slab 1.00 1.00 0.20 4 4.044 3.235 3.235 M3
300mm thk slab 1.00 1.00 0.30 1 41.219 12.366 12.336 M3
slab SL EL to+1.5 0.80 5.47 0.20 1 1.000 0.875
slab SL EL to+13.5 0.80 6.01 0.20 4 1.000 3.843
200mm slab entrance 4.06 2.68 0.20 1 1.000 2.176 6.8994 M3
stairs to +1.50 1.20 1.00 1.00 19 0.020 0.453
stairs to +13.50 1.20 1.00 1.00 80 0.020 1.908
stairs@entrance 4.06 1.00 1.00 8 0.023 0.730 3.091 M3
Total(17_3_4) 52.83 M3
Consultant Engineer Contractor Engineer
project engineer Manager Engineer Contrator Engineer Manager Engineer