LAPORAN BULANAN
TESTING & COMMISSIONING
MEKANIKAL, ELEKTRIKAL, PLAMBING
MALL GREEN BAY JAKARTA
JL. PLUIT KARANG AYU S BLOK 1 UTARA
JAKARTA UTARA 14440
INDONESIA
3 SEPTEMBER 2013 3 OKTOBER 2013
Build on the power of our network
LAPORAN BULANAN
MEKANIKAL, ELEKTRIKAL DAN PLAMBING
MALL GREEN BAY
DISIAPKAN UNTUK
GREEN BAY PLUIT
3 SEPTEMBER 2013 3 OKTOBER 2013
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
i | P a g e
DAFTAR ISI
BUILDING INFORMATION........................................................................................................................ 1
I. RINGKASAN UTAMA ........................................................................ Error! Bookmark not defined.
INSTALASI MEKANIKAL DAN ELEKTRIKAL ...................................................................................... 3
II. PROGRES TESCOM .......................................................................................................................... 6
III. PROGRES PEKERJAAN ..................................................................................................................... 9
3.1. ELEKTRIKAL ......................................................................................................................... 9
3.1.1. STATUS PEKERJAAN ELEKTRIKAL ................................................................................... 9
3.1.2. PROGRES TESCOM ELEKTRIKAL .................................................................................... 10
3.1.3. DEFECT TESCOM SYSTEM GROUNDING (25 OKTOBER 2011) ................................. 11
3.1.4. DEFECT CHECKLIST PENYALUR PETIR (25 OKTOBER 2011) ...................................... 17
3.1.5. DEFECT TESCOM GENSET ( September 2013) .................................................... 18
3.1.6. DEFECT TESCOM PANEL KONTROL GENSET (21 NOPEMBER 2012) ........................ 28
3.1.7. DEFECT TESCOM TRANSFORMATOR (18 OKTOBER 2011) ...................................... 34
3.1.8. DEFECT TESCOM PANEL (2 NOPEMBER 2011) ......................................................... 36
3.1.9. DEFECT TESCOM PANEL (3 NOPEMBER 2011) ......................................................... 41
3.2. ELEKTRONIK ...................................................................................................................... 42
3.2.1. STATUS PEKERJAAN ELEKTRONIK ................................................................................ 42
3.2.2. PROGRES TESCOM ELEKTRONIK .................................................................................. 43
3.2.3. DEFECT CHECKLIST PANEL BAS (8 NOPEMBER 2011) .................................................. 45
3.2.4. DEFECT CHECKLIST CCTV (9 NOPEMBER 2011) ............................................................ 53
3.2.5. DEFECT CHECKLIST FIRE ALARM (2 NOPEMBER 2011) ................................................ 56
3.2.6. DEFECT CHECKLIST SOUND SYSTEM (2 NOPEMBER 2011) .......................................... 60
3.2.7. DEFECT TESCOM BAS (16 DESEMBER 2011) ................................................................ 72
3.3. MVAC ................................................................................................................................ 74
3.3.1. STATUS PEKERJAAN MVAC .......................................................................................... 74
3.3.2. PROGRES TESCOM MVAC ............................................................................................. 75
3.3.3. DEFECT TESCOM FAN ................................................................................................... 76
3.3.4. DEFECT CHECKLIST FAN (22 DESEMBER 2011) ............................................................. 99
3.3.5. DEFECT CHECKLIST AHU & FCU B2 & B1 ................................................................. 101
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
ii | P a g e
3.3.6. DEFECT CHECKLIST AHU LG ..................................................................................... 107
3.3.7. DEFECT CHECKLIST AHU (22 & 23 DESEMBER 2011) ................................................. 113
3.3.8. DEFECT CHECKLIST & TEST POMPA CHWP (16 DESEMBER 2011) ............................. 117
3.3.9. DEFECT CHECKLIST DAN TEST POMPA CWP (15 DESEMBER 2011) ........................... 119
3.3.10. DEFECT CHECKLIST COOLING TOWER (15 DESEMBER 2011) ..................................... 121
3.3.11. DEFECT CHECKLIST CHILLER (16 DESEMBER 2011) .................................................... 124
3.4. PLUMBING ...................................................................................................................... 127
3.4.1. STATUS PEKERJAAN PLUMBING ................................................................................ 127
3.4.2. PROGRES TESCOM PLUMBING ................................................................................... 128
3.4.3. DEFECT CHECKLIST INSTALASI GAS (8 NOPEMBER 2011) .......................................... 129
3.4.4. DEFECT CHECKLIST STP ............................................................................................... 133
3.4.5. DEFECT CHECKLIST GROUND TANK ............................................................................ 134
3.4.6. DEFECT RUANG POMPA ............................................................................................. 135
3.4.7. DEFECT POMPA TRANSFER ........................................................................................ 136
3.4.8. DEFECT WATER HAMMER .......................................................................................... 137
3.4.9. DEFECT ROOF TANK .................................................................................................... 138
3.4.10. DEFECT POMPA BOOSTER .......................................................................................... 139
3.4.11. DEFECT TOILET ............................................................................................................ 140
3.4.12. DEFECT SUMPIT .......................................................................................................... 141
3.5. FIRE FIGHTING ................................................................................................................ 142
3.5.1. STATUS PEKERJAAN FIRE FIGHTING ........................................................................... 142
3.5.2. PROGRES TESCOM FIRE FIGHTING ............................................................................. 142
3.5.3. DEFECT CHECKLIST FIRE FIGHTING ............................................................................. 143
3.6. TRANSPORTASI GEDUNG ............................................................................................... 144
3.6.1. STATUS PEKERJAAN TRANSPORTASI GEDUNG .......................................................... 144
3.6.2. PROGRES TESCOM TRANSPORTASI GEDUNG ............................................................ 145
3.6.3. DEFECT TESCOM ESCALATOR & TRAVELATOR .......................................................... 146
3.6.4. DEFECT CHECKLIST ELEVATOR .................................................................................... 151
3.6.5. LIST BERITA ACARA TRANSPORTASI GEDUNG ........................................................... 155
IV. POTO TEMUAN ........................................................................................................................... 158
4.1. ELEKTRIKAL ...................................................................................................................... 158
4.2. ELEKTRONIK FIRE ALARM ................................................................................................ 182
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
iii | P a g e
4.3. ELEKTRONIK BAS ............................................................................................................. 187
4.4. ELEKTRONIK CCTV ........................................................................................................... 188
4.5. ELEKTRONIK TATA SUARA ............................................................................................... 189
4.6. TRANSPORTASI GEDUNG (LIFT)....................................................................................... 192
4.7. TRANSPORTASI GEDUNG (ESCALATOR) .......................................................................... 197
4.8. MEKANIKAL PLAMBING ................................................................................................... 200
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
1 | P a g e
BUILDING INFORMATION
Nama Klien : PT. KENCANA UNGGUL SUKSES
Project : Mall Green Bay - Pluit
Obyek Properti : Mall
Alamat Properti : Jl. Pluit Karang Ayu Blok 1 Utara
Jakarta Utara 14450
Jenis Properti : Perdagangan
Luas Bangunan : 194.729, 19 m
Konsultan Architect : PT. Air Mas Asri
Konsultan Struktur : PT. Perkasa Carista Estetika
Konsultan MEP : PT. Meco Systech Internusa
PT. Malmass Mitra Teknik
Konsultan Green Building : G Energy Global PTE. LTD
Contruction Management : PT. Jaya CM
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
2 | P a g e
I. PENDAHULUAN.
Persiapan pelaksanaan Testing dan Commissioning yang dilakukan pada bulan
September 2013 ini memasuki tahap pekerjaan penyelesaian minor instalasi dan
finishing / penyempurnaan pada instalasi yang telah terpasang, karena sebagian
besar peralatan utama telah terpasang pada tempatnya.
Persiapan Testing dan Commissioning dilaksanakan dengan mengadakan
meeting koordinasi antara owner ( PT. KUS ) dengan Managemen kontruksi (
Jaya CM ), kontrator utama ( PT.TBP ) dan para kontraktor pelakasana yang
membahas masalah methode Test Comm serta mempersiapkan form check list
dan Test comm yang akan di pergunakan.
Menurut schedule pelaksanaan Test Comm akan dilaksanakan pada tanggal 22
September sampai dengan tanggal 30 September 2013, serta dan pembukaan
( Openning ) Mall Green Bay Jakarta akan dilaksanakan pada tanggal 25 Oktober
2013, dan dilanjutkan dengan soft opening 8 November 2013.
Dalam Laporan Bulanan ini kami melaporkan progress kesiapan dan persiapan
serta pelaksanaan Testing commissioning yang sudah dilakukan, serta temuan
defect nya.
Secara garis besar untuk proses pengujian Parsial Test instalasi yang terpasang
sudah dilakukan dengan dilengkapi dokumen pendukungnya yang tersimpan
dalam file document di Jaya CM Selaku coordinator pelaksana proyek dan
Kontraktor Utama PT.TOTAL BANGUN PERSADA.
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
3 | P a g e
1.1. STATUS UMUM PEKERJAAN
INSTALASI MEKANIKAL DAN ELEKTRIKAL
Instalasi Mekanikal dan Elektrikal yang terpasang pada Green Bay Mall
adalah sebagai berikut:
A. MEKANIKAL.
1. Instalasi Air condition dan Ventilasi.
2. Instalasi Plumbing, STP ,SWRO, BWRO dan RO.
3. Instalasi Pemadam Kebakaran.
4. Instalasi Gas
5. Lift, Escalator, dan Travelator.
6. Gondola.
B. ELEKTRIKAL
1. Instalasi Listrik,
2. Genset.
3. Solar Cell.
4. Penangkal Petir.
C. ELEKTRONIK
1. Telephone.
2. Sound Sistem.
3. Fire Alarm.
4. CCTV.
5. MATV
6. BAS.
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
4 | P a g e
1.2. DATA DOKUMEN.
Data document yang telah disampaikan oleh PT. Kencana Unggul
Sukses dan telah kami terima sampai tanggal 30 September 2013
adalah sebagai berikut :
GAMBAR
A. Gambar kontruksi (contruction Drawing), yang telah kami
terima.
1. Air condition
2. Plumbing dan STP
3. Fire Fighting
4. Instalasi GAS
5. Elektronik ( Sound Sistem, Telephone, Fire Alarm, CCTV,
MATV)
6. Elektrikal
7. Instalasi GAS
8. Transportasi gedung (Lift, Escalator dan Gondola)
B. Gambar kontruksi yang belum kami terima, adalah :
1. SWRO
2. B A S.
PERSETUJUAN MATERIAL ( APROVAL MATERIAL ).
PERSETUJUAN MATERIAL telah semua kami terima adalah sebagai
berikut :
a. Elektronik ( Sound Sistem, Fire Alarm, MATV, CCTV, Telephone ).
b. Plumbing,
c. Fire Fighting
d. Instalasi Gas
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
5 | P a g e
e. Instalasi STP
f. Cooling Tower
g. Escalator, Elevator , TRavelator dan Gondola
h. Genset
i. Elektrikal.
1.3. SPESIFIKASI TEKNIS.
SPESIFIKASI TEKNIS semua sudah kami terima, antara lain :
a. Elektronik (Sound Sistem, Fire Alarm, MATV, CCTV, Telephone, BAS
b. Plumbing
c. Fire Fighting
d. Elektrikal
e. Genset
f. Air condition.
g. GAS
h. Escalator, Elevator, Travelator dan Gondola.
1.4. FORM TESTING COMMISIONING
Form untuk Check list & Testing dan Commisioning telah kami koreksi dan
sebagian masih dalam proses perbaikan oleh Jaya CM selaku Koordinator
Testing dan commissioning.
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
6 | P a g e
II. PROGRES TESCOM
SISTEM
CHECKLIST
(%)
TESTCOM
(%)
DEFECT
KETERANGAN
Elektrikal
Elektronik
Sound System
BAS
Fire Alarm
MVAC
Plumbing
Fire Fighting
Escalator
Elevator
Travelator
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
7 | P a g e
No UNIT JML
CHECKLIST TESKOM
KETERANGAN
SUDAH BELUM (%) SUDAH BELUM (%)
1
ELEKTRIKAL
GENSET 100% 5 0 100%
PKG 100% 10 0 100%
TRAFO 100% 5 0 100%
PANEL-PANEL 100% 182 0 100%
GROUNDING 100% 18 0 100%
Proses B.A
Tescomm
PENYALUR PETIR 100% 1 0 100%
Proses B.A
Tescomm
100% 100%
2
ELEKTRONIK
BAS (PANEL) 100% 17 10 63%
- POIN LIST 100% 280 1897 13%
SOUND SYSTEM
(PANEL) 100% 27 0 100%
- CEILING
SPEAKER 100% 700 6 99%
153 buah
tidak hidup
- HORN SPEAKER 100% 0 112 0%
- WALL
SPEAKER 100% 0 25 0%
- CAR CALL 100% 0 4 0%
MCFA 100% 813 1295 39%
FIRE ALARM
(PANEL) 100% 2 13 13%
- SMOKE
DETECTOR 100% 287 656 30%
- ROR 100% 526 589 47%
- SMOKE DUCT 100% 0 48 0%
- BEAM
DETECTOR 100% 0 2 0%
- ANOUNCIATOR 100% 1 0 100%
CCTV (PANEL) 100% 0 10 0%
- CAMERA 100% 0 216 0%
100% 31.5%
3
MVAC
CHILLER 100% 0 4 0%
AHU 100% 49 12 80%
FCU 100% 9 0 100%
FAN 100% 90 16 85%
COOLING
TOWER 100% 4 0 100%
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
8 | P a g e
No UNIT JML
CHECKLIST TESKOM
KETERANGAN
SUDAH BELUM (%) SUDAH BELUM (%)
POMPA
TRANSFER 100% 2 0 100%
MAKE UP WATER 0% 0 2 0%
POMPA CHWP 100% 5 0 100%
POMPA CWP 100% 5 0 100%
88.9% 73.9%
4
PLUMBING
GAS 100% 1 0 100%
SEWAGE 100% 4 0 100%
SUMPIT 100% 17 0 100%
DEEPWELL 100% 4 0 100%
STP 100% 1 0 100%
TOILET 100% 14 0 100%
100% 100%
5
FIRE FIGHTING
Belum bisa di
test, setingan
PRV belum fix
POMPA FIRE 100% 0 3 0%
IHB 100% 0 75 0%
OHB 100% 0 4 0%
SEAMESE 100% 0 2 0%
Pillar Hydrant 100% 0 4 0%
BCV 100% 0 28 0%
100% 0%
6
TRANS. GEDUNG
ESCALATOR 72 100% 100%
TRAVELATOR 4 100% 100%
ELEVATOR (LIFT) 18 100% 100%
GONDOLA 4 0% 0%
75.0% 75%
GRAND TOTAL
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
9 | P a g e
III. PROGRES PEKERJAAN
3.1. ELEKTRIKAL
3.1.1. STATUS PEKERJAAN ELEKTRIKAL
Peralatan elektrikal yang sudah dilakukan testing adalah Genset
berikut PKG, Panel-panel, Grounding dan penyalur petir.
Status defect untuk peralatan Trafo, grounding dan penyalur petir
sudah closed.
Peralatan Trafo sudah diterbitkan Berita Acara Testing Commissioning.
Peralatan grounding dan penyalur petir dalam proses pembuatan
Berita Acara Testing Commissioning, terdapat kekurangan dokumen
yaitu As build drawing belum ada.
Melakukan pengecekan terhadap lampu-lampu yang terpasang di area
mall dan sekitarnya.
Melakukan pengecekan ratifikasi defect bersama antara NAI, PAKAR,
PP dan Pengelola.
Permasalahan panel kontrol yang pintu akses sulit dibuka dengan
leluasa, dan akan dilakukan pengecekan bersama untuk mengetahui
sejauh mana kesulitan akses untuk dapat melakukan maintenance
panel.
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
10 | P a g e
3.1.2. PROGRES TESCOM ELEKTRIKAL
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
GENSET PKG TRAFO PANEL-
PANEL
GROUND
ING
PENYALU
R PETIR
Checklist 100% 100% 100% 100% 100% 100%
Test 100% 100% 100% 100% 100% 100%
A
x
i
s
T
i
t
l
e
PROGRESS TESCOM ELEKTRIKAL
SISTEM
CHECKLIST
(%)
TESTCOM
(%)
KETERANGAN
Genset 100% 100%
PKG 100% 100%
Trafo 100% 100% Sudah BA Tescom
Panel 100% 100%
Grounding 100% 100% Sudah BA Tescom
Penyalur Petir 100% 100% Sudah BA Tescom
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
11 | P a g e
3.1.3. DEFECT TESCOM SYSTEM GROUNDING (25 OKTOBER 2011)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. GTB 9 PUTR.MALL 4 &
3
Bak control tertutup aspal 10 Jan 12 Selesai
Belum
Label belum tersedia 10 Jan 12 Selesai
Belum
2. GTB BODY TRAFO 1,3 &
4
Peraphian bak control 10 Jan 12 Selesai
Belum
Label belum tersedia 10 Jan 12 Selesai
Belum
3. GTB 11 BODY PUTR
MALL 1 & 2
Label belum tersedia 10 Jan 12 Selesai
Belum
4. GTB 12 START POINT
TR NO 1
Rapikan bak control 10 Jan 12 Selesai
Belum
Label belum tersedia 10 Jan 12 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
12 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
5. GTB 13 START POINT
TR NO 3
Label belum tersedia 10 Jan 12 Selesai
Belum
6. GTB 14 START POINT
GENSET NO 2
Rapikan bak control 10 Jan 12 Selesai
Belum
Label belum tersedia 10 Jan 12 Selesai
Belum
7. GTB 14 A. START POINT
GENSET NO 5
Label belum tersedia 10 Jan 12 Selesai
Belum
8. GTB 15 START POINT
GENSET TRAFO NO 4
Label belum tersedia 10 Jan 12 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
13 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
9. GTB 16 START POINT
GENSET NO 4
Label belum tersedia 10 Jan 12 Selesai
Belum
10. GTB 8 BODY PANEL TM Bak control tertutup aspal 10 Jan 12 Selesai
Belum
Label belum ada 10 Jan 12 Selesai
Belum
11. GTB 17 CHILLER Bak control belum tersedia 10 Jan 12 Selesai
Belum
Label belum tersedia 10 Jan 12 Selesai
Belum
12. GTB 18 CHILLER P. PETIR Bak control belum tersedia 10 Jan 12 Selesai
Belum
Label belum tersedia 10 Jan 12 Selesai
Belum
13. GTB 1 BODY GENSET Bak control belum tersedia 10 Jan 12 Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
14 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1,2,3,4,5 & PKG Belum
Wiring diagram belum ada 10 Jan 12 Selesai
Belum
Label belum tersedia 10 Jan 12 Selesai
Belum
14. GTB 2 START POINT
GENSET NO 3
Wiring diagram belum ada 10 Jan 12 Selesai
Belum
Label belum tersedia 10 Jan 12 Selesai
Belum
15. START POINT GENSET NO
3
Perapihan pintu bak kontrol 10 Jan 12 Selesai
Belum
Wiring diagram belum ada 10 Jan 12 Selesai
Belum
Label belum tersedia 10 Jan 12 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
15 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
16. GTB 4 START POINT
TRAFO CR
Bak control belum tersedia 10 Jan 12 Selesai
Belum
Wiring diagram belum ada 10 Jan 12 Selesai
Belum
Label belum tersedia 10 Jan 12 Selesai
Belum
17. GTB 5 BODY TRAFO CR Wiring diagram belum ada 10 Jan 12 Selesai
Belum
Label belum tersedia 10 Jan 12 Selesai
Belum
18. GTB 6 START POINT
GENSET NO 1
Wiring diagram belum ada 10 Jan 12 Selesai
Belum
Label belum tersedia 10 Jan 12 Selesai
Belum
19. GTB 7 BODY TR 2 &
BODY TRAFO CR
Wiring diagram belum ada 10 Jan 12 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
16 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Label belum tersedia 10 Jan 12 Selesai
Belum
20. GTB ELC. SOUND
SYSTEM
Kabel grounding belum terkoneksi
ke Busbar
10 Jan 12 Selesai
Belum
21. GTB ELC. SOUND FIRE
ALARAM
Kabel grounding belum terkoneksi
ke Busbar
10 Jan 12 Selesai
Belum
22. GTB ELC - BAS Kabel grounding belum terkoneksi
ke Busbar
10 Jan 12 Selesai
Belum
23. GTB ELC - CCTV Kabel grounding belum terkoneksi
ke Busbar
10 Jan 12 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
17 | P a g e
3.1.4. DEFECT CHECKLIST PENYALUR PETIR (25 OKTOBER 2011)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
24. PENYALUR PETIR Kawat sling kurang kencang 5 Jan 12 Selesai
Belum
Tiang kurang kokoh 5 Jan 12 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
18 | P a g e
3.1.5. DEFECT TESCOM GENSET ( September 2013)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. GENSET NO. 1 27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
5 Jan 12 Selesai
Belum
5 Jan 12 Selesai
Belum
5 Jan 12 Selesai
Belum
27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
5 Jan 12 Selesai
Belum
27 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
19 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
27 Des 11 Selesai
Belum
5 Jan 12 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
20 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
2. GENSET NO. 2 27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
5 Jan 12 Selesai
Belum
5 Jan 12 Selesai
Belum
5 Jan 12 Selesai
Belum
27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
5 Jan 12 Selesai
Belum
27 Des 11 Selesai
Belum
27 Des 11 Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
21 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
5 Jan 12 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
22 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
3. GENSET NO. 3 27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
5 Jan 12 Selesai
Belum
5 Jan 12 Selesai
Belum
5 Jan 12 Selesai
Belum
27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
5 Jan 12 Selesai
Belum
27 Des 11 Selesai
Belum
27 Des 11 Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
23 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
5 Jan 12 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
24 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
4. GENSET NO. 4 27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
5 Jan 12 Selesai
Belum
5 Jan 12 Selesai
Belum
5 Jan 12 Selesai
Belum
27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
5 Jan 12 Selesai
Belum
27 Des 11 Selesai
Belum
27 Des 11 Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
25 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
5 Jan 12 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
26 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
5. GENSET NO. 5 27 Des 11 Selesai
Belum
5 Jan 12 Selesai
Belum
5 Jan 12 Selesai
Belum
27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
5 Jan 12 Selesai
Belum
6. GENSET NO. 6
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
27 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
28 | P a g e
3.1.6. DEFECT TESCOM PANEL KONTROL GENSET (21 NOPEMBER 2012)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. PANEL NO. 1 27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
Berada di PAKAR
2. PANEL NO. 2 27 Des 11 Selesai
Belum
Berada di PAKAR
27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
3. PANEL NO. 3 27 Des 11 Selesai
Belum
Berada di PAKAR
27 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
29 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
27 Des 11 Selesai
Belum
5 Jan 12 Selesai
Belum
4. PANEL NO. 4 27 Des 11 Selesai
Belum
Berada di PAKAR
27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
30 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
5. PANEL NO. 5 27 Des 11 Selesai
Belum
Berada di PAKAR
27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
6. PANEL NO. 6 27 Des 11 Selesai
Belum
Berada di PAKAR
27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
27 Des 11 Selesai
Belum
7. PANEL NO. 7 27 Des 11 Selesai
Belum
Berada di PAKAR
27 Des 11 Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
31 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
27 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
32 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
8. PANEL NO. 8 27 Des 11
Selesai
Belum
Berada di PAKAR
27 Des 11
Selesai
Belum
27 Des 11
Selesai
Belum
27 Des 11
Selesai
Belum
9. PANEL NO. 9 27 Des 11
Selesai
Belum
5 Jan 12 Selesai
Belum
27 Des 11
Selesai
Belum
27 Des 11
Selesai
Belum
10. PANEL NO. 10 27 Des 11
Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
33 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
Selesai
Belum
27 Des 11
Selesai
Belum
27 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
34 | P a g e
3.1.7. DEFECT TESCOM TRANSFORMATOR (18 OKTOBER 2011)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
25. TRAFO No. 1 29 Des 11 Selesai
Belum
29 Des 11 Selesai
Belum
26. TRAFO No. 2 29 Des 11 Selesai
Belum
29 Des 11 Selesai
Belum
27. TRAFO No. 3 29 Des 11 Selesai
Belum
29 Des 11 Selesai
Belum
28. TRAFO No. 4 29 Des 11 Selesai
Belum
29 Des 11 Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
35 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
29. TRAFO No. 5 29 Des 11 Selesai
Belum
29 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
36 | P a g e
3.1.8. DEFECT TESCOM PANEL (2 NOPEMBER 2011)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. PUTR CR 18 Des 11
Selesai
Belum
18 Des 11
Selesai
Belum
2. P CAPACITOR BANK
1000KVAR (PUTR CR)
18 Des 11
Selesai
Belum
18 Des 11
Selesai
Belum
3. PUTR MALL 1 29 Des 11
Selesai
Belum
5 Jan 11 Selesai
Belum
20 Des 11
Selesai
Belum
18 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
37 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
29 Des 11
Selesai
Belum
4. P CAPACITOR BANK
1000KVAR (PUTR MALL
1 )
29 Des 11
Selesai
Belum
5. PUTR MALL 2 18 Des 11
Selesai
Belum
18 Des 11
Selesai
Belum
Selesai
Belum
Linkup elektronik
18 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
38 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
6. P CAPACITOR BANK
1000KVAR (PUTR MALL
2)
20 Des 11
Selesai
Belum
20 Des 11
Selesai
Belum
7. PANEL CUB.ARRESTER
(CUB 1) 630A/16KA
24KV
20 Des 11
Selesai
Belum
20 Des 11
Selesai
Belum
8. PANEL OUTGOING ALBS
BF 6
630A/16KA 24KV
(CUB No. 4)
20 Des 11
Selesai
Belum
20 Des 11
Selesai
Belum
9. PANEL OUTGOING ALBS
BF 6
630A/16KA 24KV (CUB
No. 3)
20 Des 11
Selesai
Belum
20 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
39 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
10. PANEL OUTGOING ALBS
BF 6
630A/16KA 24KV (CUB
No. 5)
20 Des 11
Selesai
Belum
20 Des 11
Selesai
Belum
11. PANEL OUTGOING ALBS
BF 6
630A/16KA 24KV (CUB
No. 2)
20 Des 11
Selesai
Belum
20 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
40 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
12. PANEL OUTGOING ALBS
BF 6
630A/16KA 24KV (CUB
No. 6)
20 Des 11
Selesai
Belum
20 Des 11
Selesai
Belum
13. PANEL OUTGOING ALBS
BF 6
630A/16KA 24KV (CUB
No. 7)
20 Des 11
Selesai
Belum
20 Des 11
Selesai
Belum
14. PANEL OUTGOING ALBS
BF 6
630A/16KA 24KV (CUB
No. 7)
20 Des 11
Selesai
Belum
20 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
41 | P a g e
3.1.9. DEFECT TESCOM PANEL (3 NOPEMBER 2011)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. P.CAP BANK 1100KVAR
PUTR MALL 3
20 Des 11
Selesai
Belum
2. PUTR MALL 3 20 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
18 Des 11
Selesai
Belum
3. P.CAP BANK 1100KVAR
PUTR MALL 4
29 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
42 | P a g e
3.2. ELEKTRONIK
3.2.1. STATUS PEKERJAAN ELEKTRONIK
Peralatan elektronik untuk Sound System, CCTV, BAS, Fire
Alarm sudah selesai checklist.
Interface peralatan sound system antara BOSE dan BOSCH.
Emergency Call System sudah di fungsikan namun masih
terkendala pada Back Up power.
Ratifikasi bersama defect elektronik antara NAI, PAKAR,
Pengelola dan PP.
Dokumen-dokumen masih belum lengkap, seperti single line
diagram system, test impedance sound system, test internal.
Dan terus kami dorong kontraktor untuk melengkapinya.
CCTV belum sluruhnya terpasang dan akan dipasang oleh pihak
Azbil.
Defect peralatan CCTV belum dikerjakan (By Azbil).
Speaker belum seluruhnya terpasang.
Kabel header MCFA yang melalui R. Pengelola sedang dalam
perapihan.
Equalizer sound system yang rusak masih dalam garansi dan
akan diganti baru oleh PT. Tetra.
Kabel speaker putus sehingga speaker sound system tidak aktif
(hidup) dan saat ini dalam perbaikan oleh pihak Tetra.
Permasalahan dengung atau bergaung sedang diperbaiki oleh
pihak Tetra.
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
43 | P a g e
3.2.2. PROGRES TESCOM ELEKTRONIK
SISTEM
CHECKLIST
(%)
TESTCOM
(%)
KETERANGAN
BAS
Panel BAS 100% 63%
Poin List 100% 13%
SOUND SYSTEM
Panel SS 100% 100%
Ceiling Speaker 100% 99%
Horn Speaker 100% 0%
Wall Speaker 100% 0%
Car Call 100% 0%
FIRE ALARM
Panel FA 100% 13%
Smoke Detector 100% 30%
ROR 100% 47%
Smoke Duct 100% 0%
Beam Detector 100% 0%
Anounciator 100% 100%
CCTV
Panel CCTV 100% 0%
Camera 100% 0%
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
44 | P a g e
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
BAS SOUND
SYSTEM
FIRE ALARM CCTV
Checklist 100% 100% 100% 100%
Test 32% 40% 32% 0%
100% 100% 100% 100%
32%
40%
32%
0%
PROGRESS TESCOM ELEKTRONIK
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
45 | P a g e
3.2.3. DEFECT CHECKLIST PANEL BAS (8 NOPEMBER 2011)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. PANEL BAS CR
B2 s/d Lt. ROOF
17/12/11
Selesai
Belum
14/12/11
Selesai
Belum
CLOSED
Selesai
Belum
17/12/11
Selesai
Belum
14/12/11
Selesai
Belum
2. PANEL BAS / DOC
B2 ZONA B
14/12/11
Selesai
Belum
14/12/11
Selesai
Belum
17/12/11
Selesai
Belum
CLOSED
Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
46 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
20/12/11
Selesai
Belum
20/12/11 Selesai
Belum
19/12/11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
47 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
3. PANEL BAS/DDC
B2 ZONA A
17/12/11 Selesai
Belum
14/12/11
Selesai
Belum
14/12/11
Selesai
Belum
14/12/11
Selesai
Belum
14/12/11
Selesai
Belum
CLOSED
Selesai
Belum
20/12/11 Selesai
Belum
CLOSED
Selesai
Belum
20/12/11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
48 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
4. PANEL BAS / DDC
UG ZONE B
CLOSED
Selesai
Belum
CLOSED
Selesai
Belum
CLOSED
Selesai
Belum
CLOSED
Selesai
Belum
17/12/11 Selesai
Belum
CLOSED
Selesai
Belum
5. PANEL BAS / DDC
LT.1 ZONA D
CLOSED
Selesai
Belum
CLOSED
Selesai
Belum
17/12/11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
49 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
CLOSED
Selesai
Belum
CLOSED
Selesai
Belum
CLOSED
Selesai
Belum
6. PANEL BAS/DDC
LT.3 ZONE B
CLOSED
Selesai
Belum
CLOSED
Selesai
Belum
17/12/11 Selesai
Belum
CLOSED
Selesai
Belum
CLOSED
Selesai
Belum
CLOSED
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
50 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
7. PANEL BAS/DDC
PANEL LT.
CARREFOUR
Selesai
Belum
Selesai
Belum
17/12/11 Selesai
Belum
Selesai
Belum
Selesai
Belum
Selesai
Belum
8. PANEL BAS/DDC
LT. ATAP 1.1
Selesai
Belum
Selesai
Belum
17/12/11 Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
51 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
Selesai
Belum
Selesai
Belum
Selesai
Belum
9. PANEL BAS/DDC
LT. ATAP 1.2
Selesai
Belum
Selesai
Belum
17/12/11 Selesai
Belum
Selesai
Belum
Selesai
Belum
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
52 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
10. PANEL BAS/DDC
LT. UG ZONA D
Selesai
Belum
Selesai
Belum
Selesai
Belum
Selesai
Belum
17/12/11 Selesai
Belum
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
53 | P a g e
3.2.4. DEFECT CHECKLIST CCTV (9 NOPEMBER 2011)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. PERALATAN UTAMA
CCTV
B2 S/D LT. ROOF
23 Des 11 Selesai
Belum
21 Des 11 Selesai
Belum
22 Des 11 Selesai
Belum
2. PANEL ACCESS
SWITCH
B1 ZONE D
23 Des 11 Selesai
Belum
21 Des 11 Selesai
Belum
21 Des 11 Selesai
Belum
3. PANEL ACCESS
SWITCH
B2 ZONE B
23 Des 11 Selesai
Belum
21 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
54 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
22 Des 11 Selesai
Belum
4. PANEL ACCESS
SWITCH
LG ZONE C
23 Des 11 Selesai
Belum
21 Des 11 Selesai
Belum
21 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
55 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
5. PANEL ACCESS
SWITCH
LG ZONE D
23 Des 11 Selesai
Belum
21 Des 11 Selesai
Belum
22 Des 11 Selesai
Belum
6. PANEL ACCESS
SWITCH
LG ZONE A
23 Des 11 Selesai
Belum
21 Des 11 Selesai
Belum
22 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
56 | P a g e
3.2.5. DEFECT CHECKLIST FIRE ALARM (2 NOPEMBER 2011)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. PANEL MCPFA
B2 S?D LT. ROOF
14 Des 11
Selesai
Belum
Selesai
Belum
Selesai
Belum
17 Des 11 Selesai
Belum
14 Des 11 Selesai
Belum
Selesai
Belum
Selesai
Belum
17 Des 11 Selesai
Belum
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
57 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
2. TBFA/JBFA
GF ZONE D
Selesai
Belum
Selesai
Belum
Selesai
Belum
17 Des 11 Selesai
Belum
Selesai
Belum
Selesai
Belum
By other
Selesai
Belum
Selesai
Belum
Selesai
Belum
By other
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
58 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
3. TBFA/JBFA
GF ZONE B
Selesai
Belum
Selesai
Belum
Selesai
Belum
17/12/11 Selesai
Belum
Selesai
Belum
Selesai
Belum
By other
Selesai
Belum
Selesai
Belum
Selesai
Belum
Tidak ada
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
59 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
4. TBFA/JBFA
UG ZONE C
14/12/11
Selesai
Belum
Selesai
Belum
Selesai
Belum
17/12/11 Selesai
Belum
Selesai
Belum
Selesai
Belum
Selesai
Belum
Selesai
Belum
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
60 | P a g e
3.2.6. DEFECT CHECKLIST SOUND SYSTEM (2 NOPEMBER 2011)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. TBSS / JBSS
B1 ZONE B
Selesai
Belum
17/12/11 Selesai
Belum
Selesai
Belum
17/12/11 Selesai
Belum
17/12/11 Selesai
Belum
Selesai
Belum
2. TBSS / JBSS
B2 ZONE D
Selesai
Belum
17/12/11 Selesai
Belum
Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
61 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
17/12/11 Selesai
Belum
Selesai
Belum
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
62 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
3. TBSS / JBSS
B2 ZONE B
Selesai
Belum
17/12/11
Selesai
Belum
17/12/11 Selesai
Belum
17/12/11 Selesai
Belum
Selesai
Belum
4. TBSS / JBSS
LG ZONE D
Selesai
Belum
17/12/11 Selesai
Belum
Selesai
Belum
Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
63 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
Selesai
Belum
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
64 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
5. TBSS / JBSS
LG ZONE B
Selesai
Belum
17/12/11 Selesai
Belum
Selesai
Belum
17/12/11 Selesai
Belum
Selesai
Belum
Selesai
Belum
6. PANEL SOUND
SYSTEM/SYSTEM
MANAGER
B1
Selesai
Belum
Selesai
Belum
17/12/11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
65 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
19/12/11 Selesai
Belum
Selesai
Belum
17/12/11 Selesai
Belum
Selesai
Belum
Selesai
Belum
Selesai
Belum
Ruangan terlalu
sempit
Selesai
Belum
By other
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
66 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
7. TBSS/JBTS
UG ZONE B
Selesai
Belum
17/12/11 Selesai
Belum
Selesai
Belum
17/12/11
Selesai
Belum
17/12/11
Selesai
Belum
Selesai
Belum
By other
Selesai
Belum
8. TBSS/JBTS
UG ZONE D
Selesai
Belum
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
67 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Selesai
Belum
20/12/11 Selesai
Belum
Selesai
Belum
Selesai
Belum
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
68 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
9. TBSS/JBTS
LT. 1 ZONE B
Name plate belum tersedia
Selesai
Belum
Single line diagram belum,
tersedia
17/12/11 Selesai
Belum
Terminasi kabel tidak
menggunakan skun
Selesai
Belum
Perapihan kabel di panel/riser 20/12/11 Selesai
Belum
Lubang masuk kabel pada panel
tidak tertutup rapat
17/12/11 Selesai
Belum
Fire stop belum terpasang Selesai
Belum
Shopdrawing tidak ada Selesai
Belum
10. TBSS/JBTS
LT. 1 ZONE C
Name plate belum tersedia
Selesai
Belum
Single line diagram belum,
tersedia
17/12/11 Selesai
Belum
Terminasi kabel tidak
Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
69 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
menggunakan skun Belum
Perapihan kabel di panel/riser 17/12/11 Selesai
Belum
Lubang masuk kabel pada panel
tidak tertutup rapat
Selesai
Belum
Fire stop belum terpasang Selesai
Belum
Shopdrawing tidak ada
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
70 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
11. TBSS/JBTS
LT. 1 ZONE D
Selesai
Belum
17/12/11 Selesai
Belum
Selesai
Belum
17/12/11 Selesai
Belum
Selesai
Belum
Selesai
Belum
Selesai
Belum
12. TBSS/JBTS
B1 ZONE D
Selesai
Belum
17/12/11 Selesai
Belum
Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
71 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
Selesai
Belum
20/12/11 Selesai
Belum
Selesai
Belum
Selesai
Belum
By other
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
72 | P a g e
3.2.7. DEFECT TESCOM BAS (16 DESEMBER 2011)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. Panel. AC.IDDC
LG Lt. 1
10 Jan 12 Selesai
Belum
10 Jan 12 Selesai
Belum
10 Jan 12 Selesai
Belum
10 Jan 12 Selesai
Belum
4 Jan 12 Selesai
Belum
2. PL 1 DDC.PiB
LG P6
10 Jan 12 Selesai
Belum
10 Jan 12 Selesai
Belum
3 Jan 12 Selesai
Belum
3 Jan 12 Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
73 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
3 Jan 12 Selesai
Belum
3. PL/ P.ESC/ DDC
LG L1
10 Jan 12 Selesai
Belum
10 Jan 12 Selesai
Belum
3 Jan 12 Selesai
Belum
4 Jan 12 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
74 | P a g e
3.3. MVAC
3.3.1. STATUS PEKERJAAN MVAC
4 unit Chiller, Cooling Tower, pompa CWP, dan pompa CHWP,
FCU dan AHU sudah dilakukan checklist peralatan.
Cooling tower, CWP dan CHWP sudah dilakukan pengetesan.
Mempersiapkan pengetesan untuk 4 unit chiller.
Check bersama ratifikasi defect untuk semua peralatan MVAC
antara NAI, PAKAR, Pengelola dan PP.
Collecting kelengkapan dokumen untuk persiapan Serah Terima
Peralatan.
Training Operator Chiller pihak Trane belum siap dilaksanakan.
Masih menunggu kesiapan dari subkon untuk melakukan
pekerjaan testing balancing valve di semua sistem AC.
Pemasangan AC di ruang kontrol elektronik akan ditambah
untuk menjaga agar peralatan elektronik dan suhu ruangan
tidak terlalu panas dan terjaga. Pemasangan akan dilakukan
oleh pihak PP.
Panel Motorize belum dipasang yang berlokasi di ruang Panel
Cooling Tower, pemasangan akan dilakukan oleh pihak Trane.
Pemasangan Inverter AHU akan dikerjakan oleh Trane dengan
target pemasangan 17 Januari 12.
Pengecekan cfm dari AHU akan dilakukan oleh Trane.
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
75 | P a g e
3.3.2. PROGRES TESCOM MVAC
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Fan AHU FCU Chiller CHWP Cooling
Tower
CWP
Checklist 100% 100% 100% 100% 100% 100% 100%
Test 85% 80% 100% 0% 100% 100% 100%
85%
80%
100%
0%
100% 100% 100%
PROGRESS TESCOM MVAC
SISTEM
CHECKLIST
(%)
TESTCOM
(%)
KETERANGAN
Fan 100% 85%
AHU 100% 80%
FCU 100% 100% Sudah BA Tescom
Chiller 100% 0%
CHWP 100% 100% Sudah BA Tescom
Cooling Tower 100% 100% Sudah BA Tescom
CWP 100% 100%
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
76 | P a g e
3.3.3. DEFECT TESCOM FAN
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. IAF B2.01
3 Desember 2011
Selesai
Belum
3 Desember 2011
Selesai
Belum
3 Desember 2011
Selesai
Belum
3 Desember 2011
Selesai
Belum
3 Desember 2011
Selesai
Belum
3 Desember 2011
Selesai
Belum
2. IAF B2.02 3 Desember 2011
Selesai
Belum
3 Desember 2011
Selesai
Belum
3 Desember 2011
Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
77 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
3 Desember 2011
Selesai
Belum
3 Desember 2011
Selesai
Belum
3 Desember 2011
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
78 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
3. EAF B2.01
28 Nopember 2011
Selesai
Belum
28 Nopember 2011
Selesai
Belum
28 Nopember 2011
Selesai
Belum
4. EAF B2.02 28 Nopember 2011
Selesai
Belum
28 Nopember 2011
Selesai
Belum
5. EAF B2.03 1 Desember 2011
Selesai
Belum
1 Desember 2011
Selesai
Belum
6. EAF B2.04 1 Desember 2011
Selesai
Belum
1 Desember 2011
Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
79 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
7. EAF B2.05 1 Desember 2011
Selesai
Belum
1 Desember 2011
Selesai
Belum
8. EAF B2.06 1 Desember 2011
Selesai
Belum
1 Desember 2011
Selesai
Belum
9. EAF B2.07 2 Desember 2011
Selesai
Belum
2 Desember 2011
Selesai
Belum
10. EAF B1.01
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
80 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
11. EAF B1.02
Selesai
Belum
Selesai
Belum
12. EAF B1.03
Selesai
Belum
Selesai
Belum
Selesai
Belum
Selesai
Belum
13. EAF B1.04
Selesai
Belum
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
81 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Selesai
Belum
14. EAF B1.05
Selesai
Belum
Selesai
Belum
Selesai
Belum
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
82 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
15. EAF B1.06 3 Desember 2011
Selesai
Belum
3 Desember 2011
Selesai
Belum
3 Desember 2011
Selesai
Belum
16. EAF B1.07 3 Desember 2011
Selesai
Belum
3 Desember 2011
Selesai
Belum
17. EAF B1.08 3 Desember 2011
Selesai
Belum
3 Desember 2011
Selesai
Belum
18. EAF B1.09 3 Desember 2011
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
83 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
3 Desember 2011
Selesai
Belum
19. EAF B1.10 3 Desember 2011
Selesai
Belum
3 Desember 2011
Selesai
Belum
20. EAF B1.11 5 Desember 2011
Selesai
Belum
5 Desember 2011
Selesai
Belum
5 Desember 2011
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
84 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
21. EAF B1.12 5 Desember 2011
Selesai
Belum
5 Desember 2011
Selesai
Belum
5 Desember 2011
Selesai
Belum
22. EAF B1.13 6 Desember 2011
Selesai
Belum
5 Desember 2011
Selesai
Belum
5 Desember 2011
Selesai
Belum
23. EAF B1.14 6 Desember 2011 Selesai
Belum
6 Desember 2011 Selesai
Belum
6 Desember 2011 Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
85 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
24. EAF B1.19 1 Desember 2011 Selesai
Belum
25. IAE B1.CR.01 6 Desember 2011 Selesai
Belum
6 Desember 2011 Selesai
Belum
26. EAF LG.FC.01 6 Desember 2011 Selesai
Belum
6 Desember 2011 Selesai
Belum
6 Desember 2011 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
86 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
27. IAF LG.FC.01 3 Desember 2011 Selesai
Belum
28. EAF LG.FC.02 3 Desember 2011 Selesai
Belum
29. IAF LG.FC.02 3 Desember 2011 Selesai
Belum
30. EAF LG.FC.03 3 Desember 2011 Selesai
Belum
31. IAF LG.FC.03 3 Desember 2011 Selesai
Belum
3 Desember 2011 Selesai
Belum
32. IAF LG.FC.04 5 Desember 2011 Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
87 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
5 Desember 2011 Selesai
Belum
5 Desember 2011 Selesai
Belum
5 Desember 2011 Selesai
Belum
33. IAF LG.FC.05 5 Desember 2011 Selesai
Belum
5 Desember 2011 Selesai
Belum
5 Desember 2011 Selesai
Belum
5 Desember 2011 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
88 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
34. EAF LG.FC.04 5 Desember 2011 Selesai
Belum
5 Desember 2011 Selesai
Belum
35. EAF LG.FC.05 5 Desember 2011 Selesai
Belum
5 Desember 2011 Selesai
Belum
5 Desember 2011 Selesai
Belum
36. EAF LG.FC.07 6 Desember 2011 Selesai
Belum
37. IAF LG.FC.07 6 Desember 2011 Selesai
Belum
38. SMF LG.01 6 Desember 2011 Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
89 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
6 Desember 2011 Selesai
Belum
39. SMF LG.02 6 Desember 2011 Selesai
Belum
40. EAF GF.FC.01 7 Desember 2011 Selesai
Belum
7 Desember 2011 Selesai
Belum
7 Desember 2011 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
90 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
41. EAF GF.FC.01 7 Desember 2011 Selesai
Belum
7 Desember 2011 Selesai
Belum
7 Desember 2011 Selesai
Belum
42. SMF GF.01 7 Desember 2011 Selesai
Belum
7 Desember 2011 Selesai
Belum
43. SMF GF.02 7 Desember 2011 Selesai
Belum
7 Desember 2011 Selesai
Belum
44. EAF GF.FC.04 7 Desember 2011 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
91 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
7 Desember 2011 Selesai
Belum
45. IAF GF.FC.02 7 Desember 2011 Selesai
Belum
7 Desember 2011 Selesai
Belum
46. IAF GF.FC.01A 7 Desember 2011 Selesai
Belum
7 Desember 2011 Selesai
Belum
47. IAF GF.FC.03 8 Desember 2011 Selesai
Belum
8 Desember 2011 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
92 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
48. EAF GF.FC.03 8 Desember 2011 Selesai
Belum
49. IAF GF.01 8 Desember 2011 Selesai
Belum
8 Desember 2011 Selesai
Belum
50. IAF GF.FC.01 8 Desember 2011 Selesai
Belum
8 Desember 2011 Selesai
Belum
51. IAF UG.01 8 Desember 2011 Selesai
Belum
52. EAF UG.01 8 Desember 2011 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
93 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
53. IAF UG.02 8 Desember 2011 Selesai
Belum
54. EAF L1.01 8 Desember 2011 Selesai
Belum
8 Desember 2011 Selesai
Belum
55. IAF L1.01 8 Desember 2011 Selesai
Belum
56. IAF L1.02 8 Desember 2011 Selesai
Belum
57. EAF L1.02 8 Desember 2011 Selesai
Belum
8 Desember 2011 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
94 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
58. IAF 3.CH.01 9 Desember 2011 Selesai
Belum
59. EAF 3.07 9 Desember 2011 Selesai
Belum
60. EAF 3.01 9 Desember 2011 Selesai
Belum
61. EAF 3.02 9 Desember 2011 Selesai
Belum
62. EAF 3.05 10 Desember 2011 Selesai
Belum
63. PAF PO.02 10 Desember 2011 Selesai
Belum
64. PAF PO.04 10 Desember 2011 Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
95 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
65. PAF PO.03 10 Desember 2011 Selesai
Belum
66. PAF PO.03.01 10 Desember 2011 Selesai
Belum
67. PAF PO.05 10 Desember 2011 Selesai
Belum
68. SMF PO.01 10 Desember 2011 Selesai
Belum
69. IAF G.FC.01 10 Desember 2011 Selesai
Belum
70. SMF G.01 / 02 10 Desember 2011 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
96 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
97 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
71. IAF G.FC 10 Desember 2011 Selesai
Belum
72. EAF G.FC.03 10 Desember 2011 Selesai
Belum
73. IAF G.FC.03 10 Desember 2011 Selesai
Belum
74. IAF G.FC.0A 10 Desember 2011 Selesai
Belum
75. IAF G.FC.05 10 Desember 2011 Selesai
Belum
76. IAF G.FC.04 10 Desember 2011 Selesai
Belum
77. IAF G.FC.04 10 Desember 2011 Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
98 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
78. PANEL PAC B2D 10 Desember 2011 Selesai
Belum
79. PANEL PAC B1D 10 Desember 2011 Selesai
Belum
80. PANEL PAC B2C 10 Desember 2011 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
99 | P a g e
3.3.4. DEFECT CHECKLIST FAN (22 DESEMBER 2011)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
30. EAF-G.FC.1.03 10 Desember 2011
Selesai
Belum
10 Desember 2011
Selesai
Belum
10 Desember 2011
Selesai
Belum
10 Desember 2011
Selesai
Belum
31. IAF-UG.02 10 Desember 2011
Selesai
Belum
10 Desember 2011
Selesai
Belum
32. EAF-UG.02 10 Desember 2011
Selesai
Belum
10 Desember 2011
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
100 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
33. IAF-UG.01 10 Desember 2011
Selesai
Belum
34. EAF-UG.01 10 Desember 2011
Selesai
Belum
10 Desember 2011
Selesai
Belum
35. EAF - 1.03 10 Desember 2011
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
101 | P a g e
3.3.5. DEFECT CHECKLIST AHU & FCU B2 & B1
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. AHU B2.02A
23 Des 11
Selesai
Belum
Selesai
Belum
2. FCU B2.03 22 Des 11
Selesai
Belum
- Selesai
Belum
Tidak ada di point
BAS
22 Des 11
Selesai
Belum
22 Des 11
Selesai
Belum
23 Des 11
Selesai
Belum
3. AHU B2.01A 23 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
102 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Selesai
Belum
23 Des 11
Selesai
Belum
23 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
103 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
4. AHU B2.01B 22 Des 11
Selesai
Belum
20 Des 11 Selesai
Belum
Selesai
Belum
23 Des 11
Selesai
Belum
23 Des 11
Selesai
Belum
5. FCU B2.02 - Selesai
Belum
Tidak ada di point
BAS
22 Des 11
Selesai
Belum
23 Des 11
Selesai
Belum
6. AHU B2.02B 20 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
104 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
22 Des 11
Selesai
Belum
7. AHU B2.03 22 Des 11
Selesai
Belum
24 Des 11
Selesai
Belum
8. AHU B1.01A 23 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
105 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
9. AHU B1.01B 24 Des 11
Selesai
Belum
23 Des 11
Selesai
Belum
22 Des 11
Selesai
Belum
28 Des 11
Selesai
Belum
10. AHU B1.01C 24 Des 11
Selesai
Belum
23 Des 11
Selesai
Belum
22 Des 11
Selesai
Belum
28 Des 11
Selesai
Belum
24 Des 11
Selesai
Belum
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
106 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
107 | P a g e
3.3.6. DEFECT CHECKLIST AHU LG
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. AHU LG.10 27 Des 11
Selesai
Belum
28 Des 11 Selesai
Belum
29 Des 11
Selesai
Belum
24 Des 11
Selesai
Belum
28 Des 11 Selesai
Belum
-
Selesai
Belum
TRANE
26 Des 11
Selesai
Belum
28 Des 11
Selesai
Belum
- Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
108 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
2. AHU LG.11 28 Des 11 Selesai
Belum
29 Des 11 Selesai
Belum
27 Des 11
Selesai
Belum
28 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
109 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
3. AHU LG.12 27 Des 11
Selesai
Belum
28 Des 11 Selesai
Belum
29 Des 11 Selesai
Belum
24 Des 11
Selesai
Belum
4. AHU LG.01 24 Des 11
Selesai
Belum
28 Des 11
Selesai
Belum
- Selesai
Belum
TRANE
27 Des 11
Selesai
Belum
27 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
110 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
28 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
111 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
5. AHU LG.08 24 Des 11
Selesai
Belum
28 Des 11
Selesai
Belum
29 Des 11 Selesai
Belum
28 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
6. AHU LG.09 29 Des 11
Selesai
Belum
29 Des 11 Selesai
Belum
28 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
112 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
27 Des 11
Selesai
Belum
- Selesai
Belum
27 Des 11 Selesai
Belum
28 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
113 | P a g e
3.3.7. DEFECT CHECKLIST AHU (22 & 23 DESEMBER 2011)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. AHU-GF.10 31 Des 11
Selesai
Belum
26 Des 11
Selesai
Belum
31 Des 11
Selesai
Belum
31 Des 11
Selesai
Belum
30 Des 11
Selesai
Belum
31 Des 11
Selesai
Belum
31 Des 11
Selesai
Belum
2. AHU-GF.11 31 Des 11
Selesai
Belum
26 Des 11
Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
114 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
31 Des 11
Selesai
Belum
31 Des 11
Selesai
Belum
30 Des 11
Selesai
Belum
31 Des 11
Selesai
Belum
31 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
115 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
3. AHU-GF.12 31 Des 11
Selesai
Belum
26 Des 11
Selesai
Belum
31 Des 11
Selesai
Belum
31 Des 11
Selesai
Belum
30 Des 11
Selesai
Belum
31 Des 11
Selesai
Belum
31 Des 11
Selesai
Belum
4. AHU-UG.04 27 Des 11
Selesai
Belum
31 Des 11
Selesai
Belum
2 Jan 12
Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
116 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
29 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
117 | P a g e
3.3.8. DEFECT CHECKLIST & TEST POMPA CHWP (16 DESEMBER 2011)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. CHWP- Pump No.1 5 Jan 12
Selesai
Belum
6 Jan 12
Selesai
Belum
21 Des 11
Selesai
Belum
-
Selesai
Belum
31 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
2. CHWP- Pump No.2 5 Jan 12
Selesai
Belum
21 Des 11
Selesai
Belum
-
Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
118 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
31 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
3. CHWP- Pump No.3 5 Jan 12
Selesai
Belum
21 Des 11
Selesai
Belum
-
Selesai
Belum
31 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
119 | P a g e
3.3.9. DEFECT CHECKLIST DAN TEST POMPA CWP (15 DESEMBER 2011)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. CWP- Pump No.1 -
Selesai
Belum
Sudah
kesepakatan
bersama dengan
pengelola
6 Jan 12
Selesai
Belum
-
Selesai
Belum
21 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
31 Des 11
Selesai
Belum
31 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
120 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
2. CWP- Pump No.2 -
Selesai
Belum
6 Jan 12
Selesai
Belum
21 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
31 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
121 | P a g e
3.3.10. DEFECT CHECKLIST COOLING TOWER (15 DESEMBER 2011)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. Cooling Tower 01 30 Des 11
Selesai
Belum
-
Selesai
Belum
29 Des 11
Selesai
Belum
3 Jan 12
Selesai
Belum
2. Cooling Tower 02 30 Des 11
Selesai
Belum
-
Selesai
Belum
29 Des 11
Selesai
Belum
3 Jan 12
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
122 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
3. Cooling Tower 03 3 Jan 12
Selesai
Belum
30 Des 11
Selesai
Belum
24 Des 11
Selesai
Belum
-
Selesai
Belum
29 Des 11
Selesai
Belum
3 Jan 12
Selesai
Belum
4. Cooling Tower 04 3 Jan 12
Selesai
Belum
30 Jan 11
Selesai
Belum
24 Des 11
Selesai
Belum
-
Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
123 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
29 Des 11
Selesai
Belum
3 Jan 12
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
124 | P a g e
3.3.11. DEFECT CHECKLIST CHILLER (16 DESEMBER 2011)
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. Chiller 01 29 Des 11
Selesai
Belum
-
Selesai
Belum
29 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
-
Selesai
Belum
2. Chiller 02 29 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
-
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
125 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
3. Chiller 03 29 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
-
Selesai
Belum
-
Selesai
Belum
30 Des 11
Selesai
Belum
4. Chiller 04 29 Des 11
Selesai
Belum
29 Des 11
Selesai
Belum
-
Selesai
Belum
-
Selesai
Belum
30 Des 11
Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
126 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
5. -
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
127 | P a g e
3.4. PLUMBING
3.4.1. STATUS PEKERJAAN PLUMBING
Pengecekan dan pengetesan sumpit
Perbaikan gutter untuk mencegah masuknya sampah ke dalam
Sumpit Carrefour, perbaikan gutter oleh pihak PP.
Pengecekan pada unit toilet
Test Lab akan terbit hasilnya 3 bulan mendatang..
Intake Fan sudah dipasang dan sudah di Tescom, namun
perapihan lubang dinding belum di kerjakan oleh PP.
Beita Acara Tecom STP sudah di terbitkan dengan catatan Test
Lab dan Lubang dinding Intake Fan di abaikan (tidak menunggu
selesai).
Check ratifikasi defect bersama peralatan plumbing.
Ground Water Tank sudah dilakukan Tescom.
Water Level Indicator sudah dipasang oleh pihak PP.
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
128 | P a g e
3.4.2. PROGRES TESCOM PLUMBING
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
GAS Sewage Sumpit Deepwell STP Toilet
Checklist 100% 100% 100% 100% 100% 100%
Test 100% 100% 100% 100% 100% 100%
PROGRESS TESCOM PLUMBING
SISTEM
CHECKLIST
(%)
TESTCOM
(%)
KETERANGAN
GAS 100% 100%
Sewage 100% 100%
Sumpit 100% 100%
Deepwell 100% 100%
STP 100% 100% Sudah BA Tescom
Toilet 100% 100%
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
129 | P a g e
3.4.3. DEFECT CHECKLIST INSTALASI GAS (8 NOPEMBER 2011)
NO UNIT TARGET PENYELESAIAN KETERANGAN
1. PANEL CONTROL
GAS DETECTOR
GF ZONE B
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
2. PANEL CONTROL
GAS DETECTOR
LG
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
130 | P a g e
NO UNIT TARGET PENYELESAIAN KETERANGAN
3. PANEL CONTROL
GAS DETECTOR
UG ZONE C
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
131 | P a g e
NO UNIT TARGET PENYELESAIAN KETERANGAN
4. PANEL CONTROL
GAS DETECTOR
LT. 1 ZONE B
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
5. PANEL CONTROL
GAS DETECTOR
LT. 1 ZONE C
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
6. PANEL CONTROL
GAS DETECTOR
28 Nop 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
132 | P a g e
NO UNIT TARGET PENYELESAIAN KETERANGAN
UG ZONE B
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
133 | P a g e
3.4.4. DEFECT CHECKLIST STP
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
36. STP 22 Des 11 Selesai
Belum
16 Des 11 Selesai
Belum
15 Des 11 Selesai
Belum
15 Des 11 Selesai
Belum
15 Des 11 Selesai
Belum
15 Des 11 Selesai
Belum
15 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
134 | P a g e
3.4.5. DEFECT CHECKLIST GROUND TANK
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
37. GROUND TANK 9 Des 11 Selesai
Belum
Selesai
Belum
9 Des 11 Selesai
Belum
9 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
135 | P a g e
3.4.6. DEFECT RUANG POMPA
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
38. RUANG POMPA 9 Des 11 Selesai
Belum
9 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
136 | P a g e
3.4.7. DEFECT POMPA TRANSFER
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
39. POMPA TRANSFER 16 Des 11 Selesai
Belum
16 Des 11 Selesai
Belum
16 Des 11 Selesai
Belum
Selesai
Belum
By Elekttrik
16 Des 11 Selesai
Belum
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
137 | P a g e
3.4.8. DEFECT WATER HAMMER
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
40. WATER HUMMER 19 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
138 | P a g e
3.4.9. DEFECT ROOF TANK
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
41. ROOF TANK 9 Desember 2011 Selesai
Belum
9 Desember 2011 Selesai
Belum
Selesai
Belum
9 Desember 2011 Selesai
Belum
9 Desember 2011 Selesai
Belum
Selesai
Belum
9 Desember 2011 Selesai
Belum
9 Desember 2011 Selesai
Belum
9 Desember 2011 Selesai
Belum
By VAC
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
139 | P a g e
3.4.10. DEFECT POMPA BOOSTER
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
42. RUANGAN BOOSTER
PUMP
17 Des 11 Selesai
Belum
17 Des 11 Selesai
Belum
17 Des 11 Selesai
Belum
43. POMPA BOOSTER 9 Des 11 Selesai
Belum
By Elektrik
9 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
140 | P a g e
3.4.11. DEFECT TOILET
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
44. TOILET 17 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
141 | P a g e
3.4.12. DEFECT SUMPIT
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
45. SUMPIT Selesai
Belum
9 Des 11 Selesai
Belum
20 Des 11 Selesai
Belum
9 Des 11 Selesai
Belum
BY SIPIL
9 Des 11 Selesai
Belum
9 Des 11 Selesai
Belum
9 Des 11 Selesai
Belum
By SIPIL
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
142 | P a g e
3.5. FIRE FIGHTING
3.5.1. STATUS PEKERJAAN FIRE FIGHTING
Peralatan fire fighting sudah dilakukan checklist peralatan, namun
peralatan pemadam kebakaran atau fire fighting system belum dapat
dilakukan tescom, dikarenakan seting PRV belum menuju kata sepakat.
Hal ini sudah dibicarakan oleh pihak konsultan desain.
3.5.2. PROGRES TESCOM FIRE FIGHTING
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Pompa
Fire
IHB OHB Siamese Pillar
Hydrant
BCV
Checklist 100% 100% 100% 100% 100% 100%
Test 0% 0% 0% 0% 0% 0%
100% 100% 100% 100% 100% 100%
0% 0% 0% 0% 0% 0%
PROGRESS TESCOM FIRE FIGHTING
SISTEM
CHECKLIST
(%)
TESTCOM
(%)
KETERANGAN
Pompa Fire 100% 0%
IHB 100% 0%
OHB 100% 0%
Siamese 100% 0%
Pillar Hydrant 100% 0%
BCV 100% 0%
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
143 | P a g e
3.5.3. DEFECT CHECKLIST FIRE FIGHTING
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. PERALATAN FIRE
FIGHTING
9 Des 11 Selesai
Belum
9 Des 11 Selesai
Belum
16 Des 11 Selesai
Belum
15 Des 11 Selesai
Belum
16 Des 11 Selesai
Belum
19 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
144 | P a g e
3.6. TRANSPORTASI GEDUNG
3.6.1. STATUS PEKERJAAN TRANSPORTASI GEDUNG
Acrylic pada Lift Service 06 belum tersedia. Pihak Hyundai akan
mendatangkan item tersebut secepatnya.
Kondisi pit Lift Service 06 masih ada rembesan air dari
lantainya, dan akan diperbaiki oleh PP (Civil).
Escalator 46 unit defect sudah closed dan B.A Tescom sudah
diterbitkan, sisa 2 unit yang belum siap operasi.
Travelator 8 unit defect sudah closed dan B.A Tescom sudah
diterbitkan.
Pengecekan defect bersama PP, PAKAR, NAI dan Pengelola.
46 unit Escalator dalam proses BAST-1.
8 unit Travelator dalam proses BAST-1.
Gondola hingga saat ini belum siap dilakukan Tescom (informasi
by owner).
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
145 | P a g e
3.6.2. PROGRES TESCOM TRANSPORTASI GEDUNG
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Escalator Travelator Lift Gondola
Checklist 100% 100% 100% 0%
Test 100% 100% 100% 0%
100% 100% 100%
0%
PROGRESS TESCOM TRANSPORTASI GEDUNG
SISTEM
QTY
(Unit)
CHECKLIST
(%)
TESTCOM
(%)
KETERANGAN
Escalator 100% 100% 2 unit belum opr.
Travelator 100% 100%
Lift 100% 100%
gondola 0% 0%
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
146 | P a g e
3.6.3. DEFECT TESCOM ESCALATOR & TRAVELATOR
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. ESCALATOR 17 9 Desember 2011 Selesai
Belum
12 Desember 2011 Selesai
Belum
2. ESCALATOR 18 9 Desember 2011 Selesai
Belum
12 Desember 2011 Selesai
Belum
3. ESCALATOR 20 12 Desember 2011 Selesai
Belum
4. ESCALATOR 33 12 Desember 2011 Selesai
Belum
5. ESCALATOR 34 12 Desember 2011 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
147 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
6. ESCALATOR 35 12 Desember 2011 Selesai
Belum
7. ESCALATOR 36 12 Desember 2011 Selesai
Belum
8. ESCALATOR 37 12 Desember 2011 Selesai
Belum
9. ESCALATOR 38 12 Desember 2011 Selesai
Belum
10. ESCALATOR 08 16 Desember 2011 Selesai
Belum
11. ESCALATOR 14 16 Desember 2011 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
148 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
12. ESCALATOR 10 9 Desember 2011 Selesai
Belum
13. ESCALATOR 25 16 Des 12 Selesai
Belum
16 Des 12 Selesai
Belum
16 Des 12 Selesai
Belum
14. ESCALATOR 41 16 Des 12 Selesai
Belum
15. ESCALATOR 43 16 Des 12 Selesai
Belum
16. 16 Des 12 Selesai
Belum
17. ESCALATOR 44 16 Des 12 Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
149 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
18. TRAVELATOR 01 16 Des 12 Selesai
Belum
19. TRAVELATOR 02 16 Des 12 Selesai
Belum
20. TRAVELATOR 03 16 Des 12 Selesai
Belum
16 Des 12 Selesai
Belum
21. TRAVELATOR 04 16 Des 12 Selesai
Belum
16 Des 12 Selesai
Belum
22. TRAVELATOR 05 9 Des 12 Selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
150 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Belum
23. TRAVELATOR 06 16 Des 12 Selesai
Belum
24. TRAVELATOR 07 7 Desember 2011 Selesai
Belum
25. TRAVELATOR 07 16 Desember 2011 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
151 | P a g e
3.6.4. DEFECT CHECKLIST ELEVATOR
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
1. Lift Panoramic Selesai
Belum
Lingkup PP
Selesai
Belum
Lingkup PP
Selesai
Belum
Lingkup PP
5 Jan 12 Selesai
Belum
29 Nop 11 Selesai
Belum
Selesai
Belum
Lingkup PP
Selesai
Belum
Lingkup PP
Selesai
Belum
Lingkup PP
28 Des 11 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
152 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Selesai
Belum
Lingkup PP
28 Des 11 Selesai
Belum
Selesai
Belum
Selesai
Belum
Selesai
Belum
Selesai
Belum
Selesai
Belum
28 Nop 11 Selesai
Belum
1 Jan 12 Selesai
Belum
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
153 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
29 Nop 11 Selesai
Belum
16 Des 11 Selesai
Belum
2. Lift Service No.2 12 Des 11 Selesai
Belum
28 Nop 11 Selesai
Belum
30 Nop 11 Selesai
Belum
28 Nop 11 Selesai
Belum
14 Desember 2011 Selesai
Belum
Selesai
Belum
3. Lift Passenger No.5 Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
154 | P a g e
NO UNIT ITEM DEFECT TARGET PENYELESAIAN KETERANGAN
Selesai
Belum
Selesai
Belum
Selesai
Belum
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
155 | P a g e
3.6.5. LIST BERITA ACARA TRANSPORTASI GEDUNG
ESCALATOR
No. Unit No. BA TESCOM Tgl. Penerbitan Melayani Void
ESCALATOR 1
144/SK/ME-NAI/TC/XII/11 17-Dec-11 B1 - LG 4
ESCALATOR 2
ESCALATOR 3
142/SK/ME-NAI/TC/XII/11 17-Dec-11 LG - GF 4
ESCALATOR 4
ESCALATOR 5
141/SK/ME-NAI/TC/XII/11 17-Dec-11 Entrance Timur - LG 6
ESCALATOR 6
ESCALATOR 7
160/SK/ME-NAI/TC/XII/11 27-Dec-11 Entrance Timur - GF 6
ESCALATOR 8
ESCALATOR 9
143/SK/ME-NAI/TC/XII/11 17-Dec-11 B2 - B1 2 ESCALATOR
10
ESCALATOR
11
151/SK/ME-NAI/TC/XII/11 17-Dec-11
Entrance Selatan -
LG
7
ESCALATOR
12
ESCALATOR
13
155/SK/ME-NAI/TC/XII/11 21-Dec-11
Entrance Selatan -
GF
7
ESCALATOR
14
ESCALATOR
15
150/SK/ME-NAI/TC/XII/11 17-Dec-11
Entrance Selatan -
GF
7
ESCALATOR
16
ESCALATOR
17
153/SK/ME-NAI/TC/XII/11 21-Dec-11 B2 - B1 3
ESCALATOR
18
ESCALATOR
19
149/SK/ME-NAI/TC/XII/11 17-Dec-11 B1 -LG 3
ESCALATOR
20
ESCALATOR
21
152/SK/ME-NAI/TC/XII/11 21-Dec-11 LG - GF 3
ESCALATOR
22
ESCALATOR
23 153/SK/ME-NAI/TC/XII/11 21-Dec-11 B2 - B1 3
ESCALATOR
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
156 | P a g e
24
ESCALATOR
25
170/SK/ME-NAI/TC/I/12 9-Jan-12 UG - L1 3
ESCALATOR
26
ESCALATOR
27
167/SK/ME-NAI/TC/I/12 5-Jan-12 L1 - L2 2
ESCALATOR
28
ESCALATOR
29
175/SK/ME-NAI/TC/I/12 10-Jan-12 L2 - L3 2
ESCALATOR
30
ESCALATOR
31
148/SK/ME-NAI/TC/XII/11 17-Dec-11 LG - GF 8
ESCALATOR
32
ESCALATOR
33
147/SK/ME-NAI/TC/XII/11 17-Dec-11 B2 - B1 1
ESCALATOR
34
ESCALATOR
35
146/SK/ME-NAI/TC/XII/11 17-Dec-11 B1 - LG 1
ESCALATOR
36
ESCALATOR
37
145/SK/ME-NAI/TC/XII/11 17-Dec-11 B1 - LG 1
ESCALATOR
38
ESCALATOR
41
159/SK/ME-NAI/TC/XII/11 27-Dec-11 GF - UG 9
ESCALATOR
42
ESCALATOR
43
169/SK/ME-NAI/TC/I/12 5-Jan-12 UG - L1 9
ESCALATOR
44
ESCALATOR
45
158/SK/ME-NAI/TC/XII/11 27-Dec-11 L1 - L2 9
ESCALATOR
46
ESCALATOR
47
174/SK/ME-NAI/TC/XII/11 11-Jan-12 L2 - L3 9
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
157 | P a g e
ESCALATOR
48
TRAVELATOR
No. Unit No. BA TESCOM Tgl. Penerbitan Melayani Void
TRAVELATOR
1
161/SK/ME-NAI/TC/XII/11 27-Dec-11 B1 - LG 2
TRAVELATOR
2
TRAVELATOR
3
171/SK/ME-NAI/TC/I/12 6-Jan-12 UG - GF 2
TRAVELATOR
4
TRAVELATOR
5
166/SK/ME-NAI/TC/I/12 5-Jan-12 GF - UG 2
TRAVELATOR
6
TRAVELATOR
7
168/SK/ME-NAI/TC/I/12 5-Jan-12 UG - L1 7
TRAVELATOR
8
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
158 | P a g e
IV. POTO TEMUAN
4.1. ELEKTRIKAL
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
1.
Photo 001.
Gen-Set No:1
2030KVA
LG Area
Gen-Set No:1 dengan kapasitas 2030KVA
Sebagian
accessories In
Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
159 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
2.
Photo 002.
Gen-Set No:1
2030KVA
LG Area
Pemasangan flow meter sebaiknya di hadapkan ke atas untuk
memudahkan pembacaan
Saran
3.
Photo 003.
Gen-Set No:1
2030KVA
LG Area
Sebagian instalasi Fuel Flow Meter belum selesai dikerjakan In Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
160 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
4.
Photo 004.
Gen-Set No:2
2030KVA
LG Area
Gen-Set No:2 dengan kapasitas 2030KVA
Sebagian
accessories In
Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
161 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
5.
Photo 005.
Gen-Set No:2
2030KVA
LG Area
Sebagian instalasi Flow Meter belum selesai dikerjakan In Progress
6.
Photo 006.
Gen-Set No:2
2030KVA
LG Area
Pemasangan flow meter sebainya di hadapkan ke atas untuk
memudahkan pembacaan
Saran
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
162 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
7.
Photo 007.
Gen-Set No:3
2030KVA
LG Area
Gen-Set No:3 dengan kapasitas 2030KVA
Sebagian
accessories In
Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
163 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
8.
Photo 008.
Gen-Set No:3
2030KVA
LG Area
Sebagian instalasi Flow Meter belum selesai dikerjakan In Progress
9.
Photo 009.
Gen-Set No:3
2030KVA
LG Area
Pemasangan flow meter sebaiknya di hadapkan ke atas untuk
memudahkan pembacaan
Saran
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
164 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
10.
Photo 0010.
Gen-Set No:4
2030KVA
LG Area
Gen-Set No:4 dengan kapasitas 2030KVA
Sebagian
accessories In
Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
165 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
11.
Photo 0011.
Gen-Set No:4
2030KVA
LG Area
Sebagian material yang mudah terbakar belum dibersihkan In Progress
12.
Photo 0012.
Gen-Set No:4
2030KVA
LG Area
Pemasangan flow meter agar di hadapkan ke atas untuk
memudahkan pembacaan
Saran
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
166 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
13.
Photo 0013.
Gen-Set No:5
1125KVA
LG Area
Gen-Set No:5 dengan kapasitas 1125 KVA
Sebagian
accessories In
Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
167 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
14.
Photo 0014.
Gen-Set No:5
1125KVA
LG Area
Sebagian instalasi Flow Meter belum selesai dikerjakan In Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
168 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
15.
Photo 0015.
Gen-Set No:6
2030KVA
LG Area
Gen-Set No:6 dengan kapasitas 2030KVA
Sebagian
accessories In
Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
169 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
16.
Photo 0016.
Gen-Set No:6
2030KVA
LG Area
Sebagian instalasi Flow Meter belum selesai dikerjakan In Progress
17.
Photo 0017.
Gen-Set No:6
2030KVA
LG Area
Pemasangan flow meter agar di hadapkan ke atas untuk
memudahkan pembacaan
Saran
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
170 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
18.
Photo 0018.
Tangki solar
harian 10.000
liter
- LG Area
Instalasi pemipaan tangki harian 10.000 lt dalam progress
penyelesaian.
In Progress
19.
Photo 0019.
Ruang
control- LG
Area
Control Dest masih dalam proses simulasi test internal
kontraktor.
In Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
171 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
20.
Photo 0020.
CHWP
LG Area ruang
Chiller
Instalasi kabel untuk pompa CHWP belum selesai dikerjakan In Progress
21.
Photo 0021.
CHWP
LG Area
Instalasi kabel untuk kebutuhan CHWP belum selesai dikerjakan In Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
172 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
22.
Photo 0022.
CWP
LG Area
Instalasi kabel untuk kebutuhan CWP belum selesai dikerjakan In Progress
23.
Photo 0023.
P .Chiller
LG Area
Instalasi panel chiller sedang dilakukan pengkabelan In Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
173 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
24.
Photo 0024.
Lantai 1
Kolom TM E
Area
Pengkabelan untuk penerangan belum selesai dikerjakan In Progress
25.
Photo 0025.
LCP-AHU 1-
2.B Lantai 1
Pengkabelan untuk panel AHU belum selesai dikerjakan In Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
174 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
26.
Photo 0026.
Tangki solar
bulanan
- LG area
Pemasangan instalasi pemipaan tangki bulanan 20.000 liter
belum selesai dikerjakan
In Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
175 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
27.
Photo 0027.
SDP GRC
Lighting Lobby
+ Corridor
Instalasi kabel untuk panel SDP GRC Lighting Lobby and
Corridor belum selesai dikerjakan
In Progress
28.
Photo 0028.
Void GF Area
Instalasi lampu penerangan belum selesai dikerjakan In Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
176 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
29.
Photo 0029.
External Area
Instalasi kabel penerangan External Area menggunakan kabel
NYY belum selesai dikerjakan
In Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
177 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
30.
Photo 0030.
Ruang Trafo
Semua Unit Tranfo sudah terpasang dan beberapa unit sudah
difungsikan ( energize )
Done
vb
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
178 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
31.
Photo 0031.
External Area
Ruangan Trafo berdebu, karena masih adanya pekerjaan
proyek,
( Ruang trafo sebaiknya harus selalu bersih dari debu, karena
unit trafo sudah di operasikan )
32.
Photo 0032.
Ruang Trafo
Satu sisi pintu pager GRC ruang trafo belum terpasang. In progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
179 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
33.
Photo 0033.
Ruang Trafo
Grounding untuk Trafo sudah terpasang Done
34.
Photo 0034.
Ruang
LVMDP
Semua panel LVMDP sudah terpasang, dan sebagian sudah di
operasikan
Done
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
180 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
35.
Photo 0035.
Ruang
LVMDP
Panel Incoming DG dan Out going to LVMDP sudah terpasang
dan sedang dalam proses pengujian internal oleh contraktor
Done
36.
Photo 0036.
Ruang Trafo
Grounding untuk Trafo sudah terpasang Done
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
181 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
37.
Photo 0037.
Ruang Trafo
Panel TM 20 KV sudah terpasang dan sudah difungsikan
( energize )
Done
38.
Photo 0038.
Penangkal
petir
Roof top
Penangkal petir sudah terpasang. Informasi
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
182 | P a g e
4.2. ELEKTRONIK FIRE ALARM
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
1.
Photo 001.
Lanti LGM
R.Control
Penamaan Ruang kontrol belum terpasang
2.
Photo 002.
Lantai LGM
R.Control
Peralatan utama elektronik belum terpasang secara
keseluruhan
Progres 70%
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
183 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
3.
Photo 003.
Ruang Kontrol
MCPFA
Penamaan panel MCPFA dan MDF-FA belum terpasang On progress
4.
Photo 004.
Ruang Kontrol
Panel MDF-FA
Gambar single diagram dan wiring diagram panel belum
terpasang
On progres
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
184 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
5.
Photo 005.
Lantai LGM
Panel MDF-FA
Lubang akses masuk kabel ke panel belum tertutup rapat On progres
6.
Photo 006.
Lantai LGM
Panel MDF-FA
Grounding panel belum terpasang On progres
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
185 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
7.
Photo 007.
Lantai LGM,
Panel MGA
Pintu Panel MGA (Master General Alarm )belum terpasang On progress
8.
Photo 008.
Lantai LGM,
Panel MGA
Lubang akses masuk kabel ke panel belum tertutup rapat
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
186 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
9.
Photo 009.
Lantai LGM,
Panel MGA
Name plate panel MGA belum terpasang
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
187 | P a g e
4.3. ELEKTRONIK BAS
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
1.
Photo 001.
Lantai LGM
Ruang
Kontrol,Panel
NAE,DDC BAS
Name plate panel belum terpasang On progres
2.
Photo 002.
Lantai LGM
Ruang
Kontrol, Panel
NAE,DDC BAS
Akses lubang kabel masuk kabel ke panel belum terpasang On progres
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
188 | P a g e
4.4. ELEKTRONIK CCTV
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
1.
Photo 001.
Lantai LGM
Ruang Kontrol
Central CCTV
Peralatan utama CCTV belum terpasang On site/on progres
2.
Photo 002.
Lantai GR,
Area korridor
Pemasangan aksesoris elektronik belum terpasang
(CCTV,Smoke detektor,Cealing Speaker)
On progres
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
189 | P a g e
4.5. ELEKTRONIK TATA SUARA
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
1.
Photo 001.
Lantai LGM
Ruang Kontrol
Central Tata
Suara
UPS back up power belum terpasang On progres
2.
Photo 002.
Lantai LGM
Ruang Kontrol
Central Tata
suara
Name Plate/labeling belum terpasang On progres
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
190 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
3.
Photo 003.
Lantai LGM
Ruang
Kontrol,Panel
MDFSS
Name plate/penamaan panel belum terpasang On progres
4.
Photo 004.
Lantai LGM
Ruang
Kontrol,Panel
MDFSS
Instalasi kabel grounding panel belum tersedia On progres
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
191 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
5.
Photo 005.
Lantai LGM
Ruang Kontrol
Central Tata
Suara
Instalasi kabel grounding belum terpasang On Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
192 | P a g e
4.6. TRANSPORTASI GEDUNG (LIFT)
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
1.
Photo 001.
Lantai LGM,
Lift S1
Sangkar Lift S1 masih dalam proses penyelesaian. On Progress
2.
Photo 002.
Lantai LGM,
Lift S1
Atap sangkar Lift S1 masih dalam proses penyelesaian. On Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
193 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
3.
Photo 003.
Lantai LGM,
Lift S2
Kondisi sangkar Lift S2 masih dalam project, indicator lantai dan
half button pada lantai LGM belum terpasang.
On Progress
4.
Photo 004.
Lantai LGM,
Lift S2
Atap sangkar Lift S2 masih dalam proses finishing dan sangkar
lift sedang dalam pekerjaan pemasangan triplek.
On Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
194 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
5.
Photo 005.
Lantai LGM,
Lift S2
Internal Load Test Lift S2 sedang dilakukan oleh kontraktor. On Progress
6.
Photo 006.
Lantai LGM,
Lift S2
Pit Lift S2 yang masih kotor dan masih dalam progress
pekerjaan.
On Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
195 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
7.
Photo 007.
Lantai LGM,
Lift S3
Pintu luar Lift S3 pada lantai LGM masih dalam progress
pekerjaan.
On Progress
8.
Photo 008.
Lantai LGM,
Lift S3
Pit Lift S3 yang masih kotor dan dalam progress pekerjaan. On Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
196 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
9.
Photo 009.
Lantai 1, Lift
Panoramic
Pintu luar Lift panoramic pada lantai 1 belum terpasang. On Progress
10.
Photo 0010.
Lantai 1, Lift
Panoramic
Shaft lift panoramic sudah terpasang stager bambu, sebagai alat
kerja untuk pemasangan rell lift dan assesorisnya
On Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
197 | P a g e
4.7. TRANSPORTASI GEDUNG (ESCALATOR)
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
1.
Photo 001.
Escalator
Lantai 1
Unit escalator pada lantai 1 sebelah barat yang
menghubungkan lantai 1 lantai 2 telah terpasang dan masih
dalam progress pekerjaan.
On Progress
2.
Photo 002.
Escalator
Lantai 1
Unit escalator pada lantai 1 sebelah selatan yang
menghubungkan lantai 1 lantai ground telah terpasang dan
masih dalam p progress pekerjaan.
On Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
198 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
3.
Photo 003.
Escalator
Lantai 1
Unit escalator pada lantai 1 void tengah yang menghubungkan
lantai 1 lantai ground telah terpasang dan masih dalam
progress pekerjaan.
On Progress
4.
Photo 004.
Escalator
Lantai 1
Unit escalator pada lantai 1 void tengah yang menghubungkan
lantai 1 lantai 2 telah terpasang dan masih dalam progress
pekerjaan.
On Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
199 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
5.
Photo 005.
Escalator
Lantai 1
Unit escalator pada lantai 1 sebelah timur yang
menghubungkan lantai 1 lantai ground telah terpasang dan
masih dalam progress pekerjaan.. Untuk menghindari
cacat/rusak pada step & floor plate escalator, sebaiknya kaki
scaf folding diberi alas.
On Progress
6.
Photo 006.
Travelator
Lantai ground
Unit travelator pada lantai ground void tengah yang
menghubungkan lantai 1 lantai ground telah terpasang dan
masih dalam p progress pekerjaan.
On Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
200 | P a g e
4.8. MEKANIKAL PLAMBING
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
1.
Photo 001.
Ruang Chiller - LG
Pekerjaan Instalasi pipa Chiller belum selesai On Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
201 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
2.
Photo 002.
Ruang Chiller - LG
Pekerjaan Isolasi pipa Chiller belum selesai On Progress
3.
Photo 003.
Ruang Chiller - LG
In/Out Pompa Chiller dan Pompa Condenser belum
dilengkapi dengan accessoriesnya
On Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
202 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
4.
Photo 004.
Ruang Chiller - LG
Semua unit Chiller sudah terpasang pada tempatnya
dan sedang dalam proses pekerjaan pemasangan
assesories dan instalasi kabel power.
On Progress
5.
Photo 005.
Ruang Chiller - LG
Semua pemasangan Pompa tidak dilengkapi dengan
Enertia Blok
Kondisi ini tdk
mempengaruhi
sistem instalasi
pompa, dan Sudah di
setujui oleh Pengawas
Lapangan tanpa
enersia blok.
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
203 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
6.
Photo 006.
Ruang Chiller - LG
Pemasangan instalasi kabel power pompa sedang
dalam proses pemasangan.
On propgress
7.
Photo 007.
Lantai 2 - Ruang AHU
2 -1
In-Out AHU 2-1 belum dilengkapi dengan
Accessories dan isolasi.
On Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
204 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
8.
Photo 008
Lantai 2 Ruang AHU
2 -1
Pipa In/Out AHU belum diisolasi On Progress
9.
Photo 009.
Lantai 2 Ruang AHU
2 -1
Main Duct belum di hubungkan ke Unit AHU On Progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
205 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
10.
Photo 0010
Lantai 2 Ruang AHU
2 -1
Fresh Air duct belum dilengkapi dengan Volume
Damper
On Progress
11.
Photo 0011.
Roof tank air bersih
Roof top
Roof Tank no.1 sudah terpasang dan sudah
difungsikan
Informasi
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
206 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
12.
Photo 0012.
Roof tank air bersih
-Roof Top Area
Roof Tank no.2 sudah terpasang dan sudah
difungsikan
Informasi
13.
Photo 0013.
Roof tank air bersih
-Roof Top Area
Instalasi pipa drain Roof Tank Roof Tank No. 2 belum
selesai
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
207 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
14.
Photo 0014.
Roof tank air bersih
-Roof Top Area
Instalasi pipa drain Roof Tank Roof Tank No.1 belum
selesai .
On progress
15.
Photo 0015.
Roof tank air bersih
-Roof Top Area
By Pass Valve belum dilengkapi dengan Handle Valve On progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
208 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
16.
Photo 0016.
Roof tank air bersih-
Roof Top Area
Valve Roof Tank Outlet belum dilengkapi dengan
handle Valve
On progress
17.
Photo 0017.
Roof tank air bersih
-Roof Top Area
Valve Roof Tank Outlet No.2 belum dilengkapi dengan
handle Valve.
On progress.
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
209 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
18.
Photo 0018.
Make Up Water Tank
Cooling Tower
-Roof Top Area
Make Up Water Tank Cooling Tower belum diinstalasi On progres
19.
Photo 0019.
Make Up Water Tank
Cooling Tower
-Roof Top Area
Make Up Water Tank Cooling Tower belum diinstalasi On progres
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
210 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
20.
Photo 0020.
Make Up Water Tank
Cooling Tower
-Roof Top Area
Make Up Water Tank Cooling Tower belum diinstalasi On progres
21.
Photo 0021.
Make Up Water Tank
Cooling Tower
-Roof Top Area
Make Up Water Chiller belum di instalasi On progres
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
211 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
22.
Photo 0022.
Ruang Pressurize fan
-Roof Top Area
Pressurize fan sudah terpasang Informasi
23.
Photo 0023.
Gondola David soket
-Roof Top Area
Gondola sudah terpasang Informasi
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
212 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
24.
Photo 0024.
Gondola David soket
-Roof Top Area
Gondola sudah terpasang Informasi
25.
Photo 0025.
ReLL Gondola
-Roof Top Area
Rell Gondola masih dalam proses penyelesaian
pekerjaan
On progres
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
213 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
26.
Photo 0026.
Gondola David soket
-Roof Top Area
Angkur Fondasi dudukan support gondola David soket
masih terdapat celah dan belum di isi dengan cemen
untuk mencegah angkurnya berkarat,
On progress
27.
Photo 0027.
Cooling tower
Roof top
Cooling Tower sudah terpasang dan masih dalam
proses penyelesaian pemasangan assesoriesnya.
On progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
214 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
28.
Photo 0028.
Cooling tower
Roof top
Instalasi kabel power Fan Cooling Tower sedang
dalam proses pekerjaan.
On progress
29.
Photo 0029.
Cooling tower
Roof top
Inspection Main Hole tidak tersedia tangga,
disarankan setiap ada main hole dilengkapi dengan
tangga untuk inspeksi dan akses maintenance
Usulan
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
215 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
30.
Photo 0030.
Cooling tower
Roof top
Instalasi pipa drain Cooling tower masih belum selesai
terpasang.
On progress
31.
Photo 0031.
Cooling tower
Roof top
Posisi Tangga terlalu tinggi untuk Oprasional,
diusulkan disambung sampai lantai untuk
mempermudah operasional.
Saran
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
216 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
32.
Photo 0032.
Cooling tower
Roof top
Asessories pressure gauge dan thermometer belum
terpasang
On progress
33.
Photo 0033.
Cooling tower
Roof top
Asessories pressure gauge dan thermometer belum
terpasang
On progres
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
217 | P a g e
No
No. Poto
Dan Lokasi
Foto Temuan Keterangan Status
34.
Photo 0034.
Cooling tower
Roof top
Panel control Cooling Tower sedang dalam proses
penyelesaian,
On progress
LAPORAN TESTING & COMMISSIONING
MALL GREEN BAY, JAKARTA
3 SEPTEMBER 2013 3 OKTOBER 2013
218 | P a g e