REMAINING WORKS IN THE CONTAINER

WINDOWS : Window main locks , hinges are broken, window stopper locks in all the containers to be
provided
DOORS : door main locks , hinges , locks are not working and keys are not provided in some of the
cabins all should be rectified in all container
Power supply : earth pit , bulbs not provided in all containers fans are not provided in some of the
container
EXTERIOR : logo should be printed in the container with the luminious paint
RUSTING WORKS : Since top portion of the container was in bad shape and leaking while small rain
occurred in site . Hence a proper frb sheet pasted with a proper steps should be provided
WELGING AND TINKERING WORKS : both works should be done in the container wherever
necessary


The above works are necessary to be done in all the containers