TTX-RFG-20030623-01.

doc
23/06/2003

Solidstate Controls, Inc.
de Argentina SRL
Oliv 1954 2000 Rosario - Argentina
Tel. 54-341 4553332
Fax 54-341 4540142

Transmittal Document
Order No. 054 Transmittal No.
Job No. A10899 TTX-RFG-
20030623-01.doc

To:

URUTECNA S.A.
JUNCAL 1327 PISO 22
MONTEVIDEO
Date: 06-23-2003
Attn: CLAUDIA FINOCCIO Via: Correo
Quantity and Type of Copies
Print Vellum Mylar Document No. Description Rev. Act.
1+CD
ROM
95-J100118-00 Manual de Operacion ProcessPower Espaol KPD SCIC (3-
50KVA - 240VCC)
A 5
1+CD
ROM
- APENDICE MANUAL COMUNICACION MODBUS - 5
1+CD
ROM
10-754320 (5 PAGS.) UPS 15KVA - PPR015-48-24-12-60 DIMENSIONAL GABINETE B 5
1+CD
ROM
20-754321 (5 PAGS.) UPS 15KVA - PPR015-48-24-12-60 ESQUEMATICO DEL
SISTEMA
B 5
1+CD
ROM
85-JUS0150-10 UPS 15KVA - PPR015-48-24-12-60 BILL OF MATERIALS B 5
1+CD
ROM
A108990111 NB-
0201
UPS 15KVA - PPR015-48-24-12-60 ENSAYO INFORME UPS A 5
1+CD
ROM
A108990111 BT-
0201
UPS 15KVA - PPR015-48-24-12-60 ENSAYO INFORME
BATERIAS
A 5



















Action Codes:
(1) Initial Approval DrawingManufacturing will not proceed until drawings are approved and returned. (Approval Required)
(2) Revised Approval DrawingManufacturing will not proceed until drawings are approved and returned. (Approval Required)
(3) Approved DrawingNot subject to change. Manufacturing is proceeding. (No Approval Required)
(4) Document for Reference OnlyNot subject to change from specification. Manufacturing is proceeding. (No Approval Required)
(5) Final Certified Document(No Approval Required)
Note: All items with action code (1) to be returned to Solidstate Controls within 2 weeks after date of this transmittal. Any delay