PT.

Proserve Engineering Indonesia


BILL OF MATERIAL
Date : 02/May/2012
Product Name : Drain Pipe
Specification : Fire Pump
Dwg. Number : 036/0412/BP/A1
HARGA HARGA
SATUAN TOTAL
A MATERIAL
1 Pipe 1 inch Mild Steel 1.5 meter 352,000 88,000
2 Elbow 1 inch Carbon St. 2 pcs 22,000 44,000
3 Nipple 1 inch Carbon St. 1 pcs 28,000 28,000
4 Siku 40x40 L:160mm Mild Steel 1 pcs 90,000 24,000
5 Klem 1 inch Mild Steel 1 pcs 1,750 1,750
Rp. 185,750
B CONSUMABLES
1 Seal Tip Onda Teflon 3 roll 2,000 6,000
2 Kawat Las -
3 Batu Gerinda Potong Nippon Resibon 14" 0.5 pcs 48,000 24,000
4 Thinner Super ND 1 klg 40,000 40,000
5 Cat Ftalit 0.5 klg 49,000 24,500
6 Synchromate Garda 0.5 klg 32,000 16,000
Rp. 110,500
C PROCESS COST
1 Cutting 0.5 hr 40,000 20,000
2 Thread 1 hr 40,000 40,000
3 Welding
4 Painting 2 hr 40,000 80,000
6
Rp. 140,000
D TOTAL COST
Rp. 436,250
Profit 40% Rp. 610,750
KET. SPESIFIKASI BAHAN QTY UNIT