This document is a bill of materials from PT. Proserve Engineering Indonesia for a drain pipe fire pump system. It lists the materials, consumables, and process costs including 1 inch mild steel and carbon steel pipes and fittings, teflon seals, grinding wheels, welding materials, and painting labor. The total cost is Rp 436,250 with a 40% profit margin bringing the total to Rp 610,750.
This document is a bill of materials from PT. Proserve Engineering Indonesia for a drain pipe fire pump system. It lists the materials, consumables, and process costs including 1 inch mild steel and carbon steel pipes and fittings, teflon seals, grinding wheels, welding materials, and painting labor. The total cost is Rp 436,250 with a 40% profit margin bringing the total to Rp 610,750.
This document is a bill of materials from PT. Proserve Engineering Indonesia for a drain pipe fire pump system. It lists the materials, consumables, and process costs including 1 inch mild steel and carbon steel pipes and fittings, teflon seals, grinding wheels, welding materials, and painting labor. The total cost is Rp 436,250 with a 40% profit margin bringing the total to Rp 610,750.
BILL OF MATERIAL Date : 02/May/2012 Product Name : Drain Pipe Specification : Fire Pump Dwg. Number : 036/0412/BP/A1 HARGA HARGA SATUAN TOTAL A MATERIAL 1 Pipe 1 inch Mild Steel 1.5 meter 352,000 88,000 2 Elbow 1 inch Carbon St. 2 pcs 22,000 44,000 3 Nipple 1 inch Carbon St. 1 pcs 28,000 28,000 4 Siku 40x40 L:160mm Mild Steel 1 pcs 90,000 24,000 5 Klem 1 inch Mild Steel 1 pcs 1,750 1,750 Rp. 185,750 B CONSUMABLES 1 Seal Tip Onda Teflon 3 roll 2,000 6,000 2 Kawat Las - 3 Batu Gerinda Potong Nippon Resibon 14" 0.5 pcs 48,000 24,000 4 Thinner Super ND 1 klg 40,000 40,000 5 Cat Ftalit 0.5 klg 49,000 24,500 6 Synchromate Garda 0.5 klg 32,000 16,000 Rp. 110,500 C PROCESS COST 1 Cutting 0.5 hr 40,000 20,000 2 Thread 1 hr 40,000 40,000 3 Welding 4 Painting 2 hr 40,000 80,000 6 Rp. 140,000 D TOTAL COST Rp. 436,250 Profit 40% Rp. 610,750 KET. SPESIFIKASI BAHAN QTY UNIT