This document provides a schedule for completing various electrical works for a switchyard and downstream areas by specific dates in January 2013, including installing capacitors, cables, windows, and completing other works for the switchyard, transformer, panels, cabling, and earthing by dates ranging from January 8th to 30th, 2013.
This document provides a schedule for completing various electrical works for a switchyard and downstream areas by specific dates in January 2013, including installing capacitors, cables, windows, and completing other works for the switchyard, transformer, panels, cabling, and earthing by dates ranging from January 8th to 30th, 2013.
This document provides a schedule for completing various electrical works for a switchyard and downstream areas by specific dates in January 2013, including installing capacitors, cables, windows, and completing other works for the switchyard, transformer, panels, cabling, and earthing by dates ranging from January 8th to 30th, 2013.
Switchyard 1 Supply and installation of capacitors 31/12/12 2 S&I of HT cables and termination 5/1/13 3 S&I of windows in control room 25/01/13 4 TNEB portion of switchyard works 25/01/2013 5 TNEB metering room construction 25/01/2013 6 TNEB tower erection works 25/01/2013 7 HT cable works from Transformer to Panel board 8/1/13 8 Testing and pre commissioning of EHT and HT system 30/01/2013 9 Gate works + fencing works 8/1/13 Downstream works 10 HT cable works from HT Panel board to Soft starters and LBS panels 10/1/13 11 630 KVA transformer earthing 10/1/13 12 630 KVA transformer cabling and termination - Primary and secondary 10/1/13 13 S&I of of Main panel, SSB, MCC,MLSB and APFC panel 30/01/2013 14 Cabling between main panel and sub panels 10/1/13 15 Equipment cabling and termination 20/01/2013 16 Earthing for plant 20/01/2013 Timing plan for balance works as on 25.12.12