Transportation 2.3% Material Price

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

Transportation = 2.

3% Material Price
Galvanization = 15% Material Price
SMAW M/C per day 100 LE (SMAW Welder 36 inch per day)
GTAW M/C per day 120 LE (GTAW Welder 25 inch per day)
Rigger 2 LE/INCH
Helper 1.5 LE/INCH
Grinder 3 LE/INCH
Pipe Fitter 7 LE/INCH
GTAW Welder 5.5 LE/INCH
SMAW Welder 4.17 LE/INCH
Engineering = 2% Material Price
Test & Commissioning = 5% Material Price






















P
i
p
i
n
g

Material Price
Transportation
Storage
Painting Work (Sand Plasting
Painting Material - Equipments -
Manpower - Waste)
Fabrication (Welding & Fitup)
Erection
Erection Materials ( Supports -
Bolts - Accessories)
NDT Works
Insulation
Waste (Material & Accessories)
Tools & Equipments (Erection &
Fab)
Materila Handling & Lifting
(Er)ection & Fab
Manpower
Engineering (Shop DWG -
Supervision - Quality -etc)
Test & Commisioning
OVerheads
V
a
l
v
e
s

&

F
l
a
n
g
e
s

Material Price
Transportation
Storage
Erection
Erection Materials ( Supports -
Bolts - Accessories
Insulation
Waste (Material & Accessories)
Tools & Equipments
Materila Handling & Lifting
Manpower
Engineering (Shop DWG -
Supervision - Quality -etc)
Test & Commisioning
OVerheads

E
q
u
i
p
m
e
n
t
s

Material Price
Transportation
Storage
Erection
Hookup Valves & Instrumentation
Pipes (Refer to Piping breakdown)
Erection Materials ( Supports -
Flanges - Bolts - Accessories)
Insulation
Waste (Material & Accessories)
Tools & Equipments
Materila Handling & Lifting
Manpower
Engineering (Shop DWG -
Supervision - Quality -etc)
Test & Commisioning
OVerheads