Daily system Report
for
20/Feb/2014

0 of 7

State Load Dispatch Center,Airoli (MSETCL)


Daily system Report for 20/Feb/2014 THURSDAY
GENERATION (MUs)
II
EXCHANGES (MUs)

I
A) MSGENCO

Daily

1) Thermal
2) Hydro
3) Gas
Total MSGENCO
B) 1) JSW JAIGAD
2) WPCL
3) ADANI
4) Other CPP / IPP
5) Wind Generation
6) PENCH (MS)
7) SOLAR
C) 1) TPCL Thermal
2) TPCL Hydro
TOTAL TPCL
3) REL Thermal
D) STATE
1) Thermal

Monthly

129.692
24.655
7.625
161.972
19.643
2.321
14.680
23.028
5.202
0.514
0.937
15.995
5.358
21.353
12.563

(A2+B6+C2)
2) Hydro
(A3)
3) Gas
(B5)
4) Wind
5)CPP/IPP (B1+B2+B3+B4)
(B7)
6) SOLAR

158.250
30.527
7.625
5.202
59.672
0.937

TOTAL STATE

262.213

(A1+C1+C3)

E) Central Sector

2436.953
353.287
129.026
2919.266
381.109
55.534
615.720
359.978
115.529
8.735
21.709

Daily

1) Gujrat
2) Madhya Pradesh
3) Chattisgarh
4) Maharashtra Net
(Incl. 765kV Solapur-Raichur)

5) Goa
6) TAPS 1&2 Injection
7) RGPPL Injection
8) Pench (Excess)

# Total Cent. Sector


F) Other Exchanges
295.966 1) With TPCL (Excess)
74.155 G) Bilateral Power *
370.121 1) MSEDCL Bilateral
234.318
Include PX

2967.237
436.177
129.026
115.529
811.301
21.709
4480.979

2) MUMBAI Bilateral
Include PX
3) MUMBAI Schedule

Monthly

1.270
17.303
9.360
86.585

106.631
336.492
177.500
1708.734

-0.912

-11.176

-6.263
7.536
0.000
-0.514

-112.617
139.466
0.000
-8.683

115.277

2347.523

-16.748

-336.109

14.626
-0.903
15.974
2.608
15.974

300.387
-3.623
285.719
95.799
291.238

326.826

6488.994

32.965

607.402

17.700

333.098

377.491

7429.494

H) ENERGY CATERED (MUs)


1) MSEDCL
2) TPCL
3) REL
TOTAL STATE

DETAILS OF MAHARASHTRA STATE PEAK DEMAND(MW)


PARTICULARS
MSGENCO Thermal
MSGENCO Hydro
MSGENCO Gas
MSGENCO Total Generation
Central Sector Receipt
WIND
CPP / IPP
SOLAR
Exchange with Mumbai
MSEDCL DEMAND MET
Load Shedding
MSEDCL DEMAND
TPCL GENERATION
R-INFRA GENERATION
TPCL+R-INFRA DEMAND
STATE DEMAND MET
STATE DEMAND
Frequency (Hz)

A. Morning Peak at 12
Hrs
5901
2292
307
8500
4900
113
2559
132
-939
15296
1371
16667
1167
521
2627
17923
19294
49.97

B. Evening Peak at 17
Hrs
5488
1156
310
6954
4866
328
2552
52
-887
13888
1615
15503
1080
522
2489
16377
17992
49.99

C. Night Minimum at 3
Hrs
5094
128
324
5546
4428
109
2442
0
-227
12325
18
12343
660
527
1414
13739
13757
49.93

FREQUENCY PARTICULARS
MAXIMUM FREQ.

MINIMUM FREQ.

50.28 Hz at 17.54 Hrs 49.57 Hz at 09.06 Hrs

AVERAGE FREQ.

FREQ. BELOW 49.2 Hz

49.95

0 % of Time(min)

* Displayed for information, not added in total. # Total Cent. Sector includes MSEDCL and TPCL bilateral power.

Shift Engineer

Shift Incharge
1 of 7

State Load Dispatch Center,Airoli (MSETCL)


Daily and Progressive Generation,Maximum,Minimum,OLC Details for 20/Feb/2014
Generating
unit

Generation
Daily
(Mus)

Monthly Max
(Mus) (MW)

Min
(MW)

OLC
(MW)

Koradi

Generating
unit
Total

Unit 5
Unit 6
Unit 7

0.00
0.01
4.08

44.42
19.76
70.38

Total

4.09

134.56

Unit 2
Unit 3
Unit 4
Unit 5

3.22
3.36
9.08
7.60

68.60
74.92
182.30
133.66

Total

23.26

459.47

Unit 3
Unit 4
Unit 5
Unit 6
Unit 7

0.00
3.97
3.91
5.24
5.09

0.00
56.12
76.60
101.57
98.58

Total

18.20

332.88

Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7

2.99
0.00
4.42
4.83
5.80
9.62
8.10

64.85
0.00
84.81
92.12
8.44
169.00
162.63

Total

35.77

581.85

Unit 3
Unit 4

4.78
5.39

103.90
93.57

Total

10.17

197.47

Unit 1
Unit 2
Unit 3
Unit 4
Unit 5

3.82
3.46
4.17
3.95
9.66

81.35
72.66
87.08
86.45
208.09

Total

25.05

535.63

0
6
190

0
0
155

KDPH
VTRNA
TILLARI
BHTGR/VEER
BHIRA T.R.
RNGR+BHTSA
BHANDARDRA
ELDARY
SMLHY_PTN
GHATGHAR

0.22
0.00
0.41
0.03
0.22
0.36
0.71
0.00
1.06
1.33

11.43
0.00
8.00
1.16
2.12
6.90
1.57
5.34
20.28
40.08

Total

4.34

96.88

MalharPeth
Vankuswadi
ATIT
Kale
Satara
Shirala
K Mahankal
Supa
Vita
Dondaicha
Sakri
Nandurbar
Khandke
Khaparale

0.19
0.55
0.06
0.18
1.91
0.25
0.03
0.11
0.88
0.64
0.06
0.07
0.06
0.21

4.16
7.60
1.27
2.65
32.37
3.01
0.79
1.82
17.50
29.50
4.24
2.68
4.01
3.93

250
250

Total

5.20

115.53

500
180
160
195
190
400

JSW_JAIGAD
WARDHA
Adani
Other_CPPs

19.64
2.32
14.68
23.03

381.11
55.53
615.72
359.98

Total

59.67

1412.34

Total

0.94

21.71

1125

Total

0.94

21.71

Trombay 4
Trombay 5
Trombay 6
Trombay 7A
Trombay 7B
Trombay 8
TATA Hydro

0.00
11.47
0.00
2.88
1.64
0.00
5.36

0.00
207.11
0.00
56.68
32.17
0.00
74.16

Total

21.35

370.12

1&2

12.56

234.32

Total

12.56

234.32

145
150
350
301
946

Parli

0
178
172
250
260

0
129
152
190
176

0
175
170
200
210
755

Chandrapur

135
0
191
210
310
433
396

108
0
170
180
0
359
260

130
0
190
204
225
410
280
1439

Paras

210
250

190
205

Khaparkheda

195
170
197
193
506

130
125
145
141
80

Monthly Max
(Mus) (MW)
256.41

170
120
125
290
285

Daily
(Mus)
20.32

0
0
170

Bhusawal

145
150
500
345

Generation

Nasik

Min
(MW)

OLC
(MW)
1020

Hydro

19
0
63
2
41
15
47
0
52
250

0
0
0
1
0
14
13
0
41
0

19
0
63
3
41
14
0
0
35
0
175

Wind

CPP

894
100
620

764
93
600

784
95
617
465
1961

SOLAR

Tata

Unit 3
Unit 4
Unit 5

4.30
4.49
4.36

43.58
74.14
77.38

Total

13.15

195.10

All Units

7.62

129.03

Total

7.62

129.03

190
194
189

165
175
170

190
190
190
570

Uran

327

305

320
320

PENCH (MS)

Pench (MS)

0.51

8.74

Total

0.51

8.74

50

5.46
11.58
3.28

72.38
138.86
45.16

Koyna 12&4 Total

17.04

211.25

435
1120
320

40
0
0

0
324
0
114
66
0
0

0
500
0
120
60
0
447
1127

REL

Koyna

Stage 1-2
Stage 4
Stage 3

0
502
0
128
71
0
471

450
250
320
700

527

519

500
500

Cent_Sect

Share

4941

Total

4941

Thermal
Thml+Gas
Hydro
Total
State Total
MS
PG
CL

129.69
137.32
24.66
161.97
262.21

2436.95
2565.98
353.29
2919.27
4480.98

5505
5825
1195
7020
15549

2 of 7

State Load Dispatch Center,Airoli (MSETCL)


Hourly Load Data As on 20/Feb/2014

TIME MSPGCL GEN.


Mum. MSEDCL LOAD MSEDCL TPCL + R
CPP /
CS
CS Mum.S
STATE FREQ.
SR.
TOTAL WIND
SOLAR
NET
DEM. SHEDDI DEM.
-INFRA
IPP
SHARE RECPT CH.
DEMAND (Hz)
NO. THM HY GAS
EXCH.
MET
NG
WITH LS DEMAND
1 4946

473

321

5740

61

2439

4541

4504

-510

-446

12304

12311

1619

13930

49.93

2 5066

173

324

5563

101

2453

4653

4531

-471

-270

12407

18

12425

1478

13903

49.93

3 5094

128

324

5546

109

2442

4731

4428

-467

-227

12325

18

12343

1414

13757

49.93

4 5226

129

325

5680

74

2461

4705

4762

-441

-300

12688

18

12706

1396

14102

49.94

5 5233

228

324

5785

107

2421

4706

4655

-420

-320

12675

43

12718

1416

14134

49.85

6 5170

309

326

5805

123

2408

4950

4995

-462

-336

13012

298

13310

1539

14849

49.92

7 5279

785

327

6391

157

2441

4928

4955

-522

-497

13447

768

14215

1712

15927

49.78

8 5447 1841

327

7615

138

2478

4704

4828

-493

-544

14551

966

15517

1892

17409

49.90

9 5693 2253

321

8267

109

2634

40

4617

4629

-605

-640

15062

1247

16309

2139

18448

49.87

10 5854 2325

316

8495

62

2609

78

4671

4895

-728

-748

15414

1204

16618

2402

19020

49.89

11 5917 2273

311

8501

101

2559

129

4786

4706

-871

-933

15086

1381

16467

2617

19084

49.91

12 5901 2292

307

8500

113

2559

132

4817

4900

-887

-939

15296

1371

16667

2627

19294

49.97

13 5629 2111

306

8046

111

2542

141

4821

5227

-852

-914

15200

1283

16483

2602

19085

49.88

14 5563 2127

308

7998

109

2598

132

4745

5140

-793

-854

15173

1532

16705

2504

19209

49.94

15 5437 1961

305

7703

167

2559

121

4701

4846

-778

-853

14593

1661

16254

2516

18770

49.96

16 5441 1852

309

7602

281

2560

87

4766

4479

-780

-882

14147

1826

15973

2513

18486

50.00

17 5488 1156

310

6954

328

2552

52

4841

4866

-789

-887

13888

1615

15503

2489

17992

49.99

18 5440

443

314

6197

310

2539

17

4695

4699

-789

-926

12859

985

13844

2446

16290

50.04

19 5443

372

317

6132

345

2569

4721

4844

-829

-999

12914

162

13076

2447

15523

49.96

20 5483

641

317

6441

451

2516

4949

5150

-814

-896

13685

123

13808

2515

16323

50.04

21 5431

333

319

6083

454

2374

4976

5170

-802

-905

13186

72

13258

2420

15678

50.03

22 5177

183

319

5679

443

2380

4624

4642

-728

-832

12312

47

12359

2171

14530

50.09

23 5159

134

323

5616

472

2312

4520

4772

-589

-843

12329

26

12355

2006

14361

50.01

24 5175

133

325

5633

476

2267

4773

4657

-553

-757

12276

21

12297

1784

14081

50.07

129.6
24.66 7.62 161.97
5.20 59.67
0.94 113.94 115.28 -15.97 -16.75 326.83 16.69
343.52
50.66
394.18
9
NOTE : ALL VALUES IN MW
Mumbai Sch./Net Exch is shown with reference to MSETCL System. (+) indicates Mum. to MSETCL and (-) indicates
MSETCL to Mum. Mumbai Schedule is calculated for MSETCL periphery (taking 4% loss for import & 4.85% MSETCL loss
MUs

# Without Applying Load Diversity Factor

3 of 7

49.95

State Load Dispatch Center,Airoli (MSETCL)


Details of Generating Unit Outages/Trippings for 20/Feb/2014
Position as on 6.30 Hrs of 21/Feb/2014
Name of Generating
Unit

Capacity

Tripped
Date

Trippe
Sync.Date
d Time

Sync.
Time

Expected
Date

Parli Unit 3

210

13/02/2013

23.50

Continued. Water Shortage

Chandrapur Unit 2

210

14/01/2014

12.38

Continued. AOH

Koyna Unit 2

75

10/02/2014

12.10

Continued. Pressure Shaft work

01/03/2014

Koyna Unit 1

75

10/02/2014

12.25

Continued. Pressure Shaft work

01/03/2014

Dabhol 1B

230

28/05/2013

22.02

Continued. Gas shortage.

Dabhol 3A

230

06/06/2013

08.28

Continued. Gas Shortage

Dabhol 2A

230

06/06/2013

09.10

Continued. Gas Shortage

Dabhol 1X

290

27/06/2013

21.46

Continued. Gas Shortage

Dabhol 1A

230

27/06/2013

21.47

Continued. Gas Shortage

Dabhol 2X

290

15/07/2013

15.09

Continued. Gas Shortage

Tata Trombay 6

500

19/07/2013

23.54

Continued. Economic shut down.

Dabhol 2B

230

08/08/2013

15.03

Continued. Gas Shortage

300

02/10/2013

00.45

Continued.

CPP JSW (J) U2

300

21/10/2013

00.00

Continued. Lack of Shedule.

Dabhol 3X

290

29/12/2013

05.47

Continued. Gas Shortage

Dabhol 3B

230

29/12/2013

06.14

Continued. Gas Shortage

Uran Unit 8

108

03/01/2014

14.06

Continued. Gas Shortage

250

09/01/2014

22.54

Continued.

Uran Unit B0

120

29/01/2014

17.50

Continued. Gas Shortage.

Uran Unit 7

108

29/01/2014

18.05

Continued. Gas Shortage.

CPP WPCL U-1

135

30/01/2014

12.45

Continued. turbine vibration

CPP WPCL U-4

135

12/02/2014

16.53

Continued. Asp Prob.

Koradi Unit 5

200

14/02/2014

01.53

Continued. I D Fan.

CPP Adani U1

660

15/02/2014

20.59

Continued. Turbine Problem.

CPP Adani U-2

660

17/02/2014

11.25

Continued. Boiler Tube Leakage

CPP WPCL U-2

135

18/02/2014

00.02

Continued. Ash Conveying problem

Khaparkheda Unit 5

500

19/02/2014

21.03

Koradi Unit 6

210

19/02/2014

23.55

500

20/02/2014

20.50

Reason of Outage

PLANNED OUTAGE

FORCED OUTAGE

CPP VIPL

Tata Trombay 8

Chandrapur Unit 5

20/02/2014

00.07

Turbine bearing vibration


high.

Emergency H/T,Fire at
turbine track.

Flame Failure.

Continued. Electrical Board Earth Fault.


21/02/2014

03.56

Generator Cold Gas Temp


High

4 of 7

State Load Dispatch Center,Airoli (MSETCL)


Details of Line outages/Trippings for 20/Feb/2014
Position as on 6.30 Hrs of 21/Feb/2014

Name of Line

Tripped
Date

Tripped Synchronise Synchronise


Time
d Date
d Time

Reason of Outage

InterState
Voltage Level :

400KV

Padgha-Tarapur - II

19/02/2014

10.01

Kalwa - Talegaon (PGCIL) 20/02/2014

10.34

Voltage Level :

220KV

Borivali -Tarapur
Voltage Level :

20/02/2014

Outage Type PLANNED OUTAGE


For Attending SF6 Leakage @ Tarapur
Continued.
End.(4 Days)
19.24
Replace Display Card.
Outage Type

07/12/2013

10.15

Continued.

400KV

PLANNED OUTAGE

MUMBAI STRENGTHENING WORK

Outage Type

HAND TRIPPED

Kolhapur - Mapusa - I

19/02/2014

22.01

20/02/2014

07.11

Over Voltage.

Dhule-Sar'Sarovar - I

19/02/2014

23.05

20/02/2014

05.43

Over Voltage.

Kolhapur - Mapusa - I

20/02/2014

16.40

Continued.

Over Voltage.

Dhule-Sar'Sarovar - I

20/02/2014

22.01

05.33

Over Voltage.

20/02/2014

IntraState
Voltage Level :
Talegaon PG Aurangabad - II
Warora-Tiroda-I

400KV

Lonikand - Jejuri
Voltage Level :

Outage Type
Continued.

PLANNED OUTAGE

14/02/2014

07.50

19/02/2014

11.33

20/02/2014

14.58

Testing of Metering CT & CVT.

20/02/2014

09.17

20/02/2014

17.37

Replacement Of CVT & CT.

220KV

Stringing Work.

Outage Type

PLANNED OUTAGE

Pusad-Nanded
Ghodbandar - Bhoisor
(MSETCL)

05/12/2013

06.03

Continued.

220KV Ghatodi S/S LILO Work.

07/12/2013

10.38

Continued.

MUMBAI STRENGTENING WORK

Borivali - Ghodbandar - II

05/02/2014

10.14

Continued.

Uran - JNPT

18/02/2014

11.11

20/02/2014

15.23

Tower Erection of Loc.8 & M/C


Stringing.
Fixing of X ARM

Jejuri - Phursungi - II

20/02/2014

08.09

20/02/2014

18.02

To Attend Missing N&B.

Pedambe - Oni

20/02/2014

09.15

20/02/2014

17.25

Cleaning Of Insulator.

Mumewadi-Mudshingi

20/02/2014

09.15

20/02/2014

17.34

Replacement Of Insulator.

Pedambe - Adlab

20/02/2014

09.40

20/02/2014

18.00

Talandage-Hamidwada

20/02/2014

14.54

20/02/2014

To Attend Emergency Tree Cutting.


Shifted On TBC For Servicing &
16.01
Alignment Of Bus Isolator.
Outage Type PLANNED OUTAGE

20/02/2014

10.01

20/02/2014

19.00

Voltage Level :

100KV

Kolshet-Vasai
Voltage Level :

400KV

Replacement Of Old Insulator.

Outage Type

HAND TRIPPED

Dabhol - Nagothane - I

05/02/2014

17.37

Continued.

New Koyna - Dabhol - I

06/02/2014

00.02

Continued.

Bhusawal- Aurangabad

18/02/2014

17.40

20/02/2014

09.20

Over Voltage.
Over Voltage.(RFC 20.35 Hrs on
16.02.14)
Over Voltage

Karad-Jaigad I

19/02/2014

16.38

20/02/2014

07.01

Over Voltage.

Bhusawal- Aurangabad

19/02/2014

18.05

20/02/2014

09.20

Over Voltage.

Karad - Kolhapur - II

19/02/2014

18.08

20/02/2014

06.58

Over Voltage.

Lonikand- Koyna Stage IV

19/02/2014

21.50

20/02/2014

08.35

Over Voltage.

Karad-Jaigad I

20/02/2014

16.02

Continued.

Over Voltage.

Karad - Kolhapur - II

20/02/2014

16.37

Continued.

Over Voltage.

Bhusawal- Aurangabad

20/02/2014

17.36

Continued.

Over Voltage.

Lonikand- Koyna Stage IV

20/02/2014

21.39

Continued.

Over Voltage.

Voltage Level :

220KV

Outage Type

HAND TRIPPED
5 of 7

State Load Dispatch Center,Airoli (MSETCL)


Details of Line outages/Trippings for 20/Feb/2014
Position as on 6.30 Hrs of 21/Feb/2014

Name of Line
Chikhali - Jalna - II
Babaleshwar Ranjangaon
Voltage Level :
220KV
Talandge - Sawantwadi II.
220/132 KV 200 MVA ICT
- II @ Parbhani
Khaparkheda-KawlewadaII
Pusad 220kv - 132kv @
Jambazar CKT
Pusad 220kv - 132kv @
Gunj CKT
Hinganghat - RLY TSS - II

Tripped
Date

Tripped Synchronise Synchronise


Time
d Date
d Time

10/02/2014

19.10

20/02/2014

09.36

Continued.
20/02/2014

17.09

Reason of Outage
To avoid O/L Paras-Chikhali line
Over Voltage.

Outage Type
Continued.

TRIPPED

29/10/2013

17.30

Dist Prot.

20/02/2014

06.42

20/02/2014

09.14

Attending Hot Spot At HV Side R


Phase CT Clamp and Replacement.

20/02/2014

09.41

20/02/2014

18.40

Replacement Of E/W.

20/02/2014

10.14

20/02/2014

10.26

Load Trimming Operated.

20/02/2014

10.14

20/02/2014

10.27

Load Trimming Operated.

20/02/2014

15.15

20/02/2014

17.20

Measurement Of TAN Delta Of Ct.

6 of 7

State Load Dispatch Center,Airoli (MSETCL)


Details of On Line Capacity for 21/Feb/2014
Generating unit
Koradi
Unit 5
Unit 6
Unit 7
Bhusawal
Unit 2
Unit 3
Unit 4
Unit 5
Parli
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7
Chandrapur
Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7
Paras
Unit 3
Unit 4
Khaparkheda
Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Nasik
Unit 3
Unit 4
Unit 5
Uran
All Units
PENCH (MS)
Pench (MS)
Koyna
Stage 1-2
Stage 4
Stage 3
Hydro
KDPH
VTRNA

Derated Capacity
(MW)

OLC (MW)

200
210
210
620

0
0
170
170

210
210
500
500
1420

140
150
500
344
1134

210
210
210
250
250
1130

0
165
158
197
190
710

210
210
210
210
500
500
500
2340

140
0
180
210
300
380
380
1590

250
250
500

210
250
460

210
210
210
210
500
1340

140
140
150
150
500
1080

210
210
210
630

190
190
190
570

852
852

320
320

Generating unit
TILLARI
BHTGR/VEER
BHIRA T.R.
RNGR+BHTSA
BHANDARDRA
ELDARY
SMLHY_PTN
GHATGHAR
Wind
MalharPeth
Vankuswadi
ATIT
Kale
Satara
Shirala
K Mahankal
Supa
Vita
Dondaicha
Sakri
Nandurbar
Khandke
Khaparale
CPP
JSW_JAIGAD
WARDHA
Adani
Other_CPPs
SOLAR
Total
Tata
Trombay 4
Trombay 5
Trombay 6
Trombay 7A
Trombay 7B
Trombay 8
TATA Hydro
REL
1&2
Cent_Sect
Share

53
53
600
1000
320
1920

450
250
320
1020

40
60

19

Derated Capacity
(MW)

OLC (MW)

60
21
80
20
45
23
12
250
611

63
2
41
15
30
27
197

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1200
405
1980
300
3885

784
95
617
465
1961

0
0
150
500
500
120
60
250
444
2024

0
500
0
120
60
0
447
1127

500
500

500
500

3455
3455

5097
5097

21280

7 of 7