26 Engi neer ed Syst ems September 2011

BY AMANDA MCKEW
AHU WORKORDER Unit Tag CAHU-1
TheFacilityFiles
CARBON FOOTPRINT
Carbon Neutral

Equipment Type
Manufacturer
Model No.
Serial No
Building
Floor
Room name
Year installed
AHU
XXX
DT-111
111010293
Hospital
Roof
Mechanical room
2000
McKew is a senior project engineer with
InterPro Solutions. Reach her at amckew@
interprosoft.com.
Equipment Information
Description Item
quantity
Actual
quantity
1 system
Special Instructions Yes No N/A
1 Make sure you have special tools.
2 Follow lock out/tag out procedures and safety procedures.
3 Attach manufacturer's maintenance checklist.
4
5
6
Task #
Monthly
Semi-
Annually
Start Up Shutdown Annually
10
WARNING: To prevent personal injury, follow lock out/tag out procedures and safety
procedures identied in the manufacturer's manual.
20 Check with operating personnel for deciencies.
30 Check controls and unit for proper operation.
40 Check for unusual noise and vibration.
50 Check tension, conditions, and alignment of belts, and adjust if necessary.
60 Check coils, drain pan, blower, motor, and drain piping.
70 Lubricate shaft and motor bearings.
80 Replace lters.
90 Clean fan.
100 Inspect exterior piping and valves for leaks and tighten connections.
110 Inspect exterior ductwork and unit enclosure for leaks and tighten connections.
120
Check operation and clean dampers, louvers and shutters, lubricate all pivot points, and
linkage.
130 Clean area around equipment.
140 Complete the workorder and report any deciencies.
Technician's Comments
1 Inspect insulation for damage and repair as needed.
2
3