Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

APH Tube expansion calculation

Project :- 170 TPH Bagasse fired Boiler


Tube sheet thickness Top 20mm
Bottom 32mm
Tube Thickness 2.04mm
Tube Sheet Hole Diameter 64.3 A
Tube Out side Diameter 63.5 B
Seat clearence (A - B) 0.8
Tube diameter 63.5
Tube thickness (2 x 2.04 ) 4.08 C
Tube ID ( B -C ) 59.42
Add seat clearence 0.8 60.22 D
6% of Tube Thick 0.2448 E
expanded Tube ID 6% (D + E ) 60.4648
60.47
expanded Tube ID 9% 60.59
expanded Tube ID 8% 60.55 Mximumum allowed
Mximumum allowed

You might also like