This document provides an overview of the status of various systems for the Fahed Al Salem branch handover. Many systems are still pending completion by the contractor, including meggar testing, earthing, panels and distribution boards, external lights, fire alarm testing, low voltage system cable testing, photocell installation, generator, automatic transfer switch, safe deposit lockers, and UPS. Systems that have been approved include internal lights, emergency and night lights, teller lights, normal power, HVAC, exhaust, hot and cold water, firefighting, doors and closers, vault doors, elevator, water tank, ATM, plasmas and DVDs, CCTV, access and interior alarm, PABX, Q-
This document provides an overview of the status of various systems for the Fahed Al Salem branch handover. Many systems are still pending completion by the contractor, including meggar testing, earthing, panels and distribution boards, external lights, fire alarm testing, low voltage system cable testing, photocell installation, generator, automatic transfer switch, safe deposit lockers, and UPS. Systems that have been approved include internal lights, emergency and night lights, teller lights, normal power, HVAC, exhaust, hot and cold water, firefighting, doors and closers, vault doors, elevator, water tank, ATM, plasmas and DVDs, CCTV, access and interior alarm, PABX, Q-
This document provides an overview of the status of various systems for the Fahed Al Salem branch handover. Many systems are still pending completion by the contractor, including meggar testing, earthing, panels and distribution boards, external lights, fire alarm testing, low voltage system cable testing, photocell installation, generator, automatic transfer switch, safe deposit lockers, and UPS. Systems that have been approved include internal lights, emergency and night lights, teller lights, normal power, HVAC, exhaust, hot and cold water, firefighting, doors and closers, vault doors, elevator, water tank, ATM, plasmas and DVDs, CCTV, access and interior alarm, PABX, Q-
2 Connecting of Cable to Branch N/A 3 Arrival of Power to branch N/A 4 Meggar Testing Pending By Contractor 5 MEW Rotation Test N/A 6 Earthing Pending By Contractor 7 Panels & DB`s Pending By Contractor 8 Internal Lights Approved 9 Emergency & Night Lights Approved 10 Teller Lights Approved 11 External Lights Approved 12 Normal Power Approved 13 UPS Power Approved 14 Photocell Pending Installation pending 15 System Links Approved 16 Fire Alarm Pending Tested but to finish the comments 17 Data System Pending By Contractor 18 LV System Cable Testing Approved 19 HVAC System Approved 20 HVAC System - Summer In Summer Testing during Summer 21 Exhaust System N/A 22 Hot & Cold Water Approved 23 Fire Fighting Approved 24 Furniture Exact Location Approved 25 Autodoor Approved 26 Rolling Shutter Approved 27 Doors & Closers Approved 28 Vault Doors Approved 29 Waterproofing Approved Toilet area only. Guarranttee to be submitted 30 Shaft Waterproofing N/A 31 Elevator AUB 32 Elevator Load Test By Third Party AUB 33 Water Tank N/A 34 Irrigation System N/A 35 UPS Pending Awaiting operating the branch (for guarantee) 36 ATM AUB 37 Plasmas & DVD`s AUB 38 Generator N/A 39 ATS N/A 40 CCTV System AUB 41 Acc & Int Alarm AUB 42 PABX System AUB 43 Q-Matic AUB 44 Music AUB 45 Satellite TV N/A 46 Video Intercom AUB 47 Safe Deposit Lockers Pending End of February 48 KFBD Final Inspection Approved 49 MEW Compliance Letter N/A 50 KFB Compliance Letter N/A TESTING & COMMISSIONING SN # System Status Remarks Fahed Al Salem Branch Handover AUB/ OHA