QIR 121 Bolts Torque Report

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

eni Iraq b.v.

- Zubair Oil Field Development Project


Work Package of Existing DGS Modification
BOLT TORQUE REPORT

Form No. QIR -121


Report No.:
Sheet

of

Reference : Steel Structure Fabrication / Installation Procedure No. 00250600DBPC4053M

SYSTEM TITLE or NO:_____________________


AREA / ISOMETRIC NUMBER : ___________________________ SHT NO :___________ DWG NO : ___________
JOINT REFERENCE/ LOCATION:______________________________

SPEC NO:________________________

FLANGE DETAILS (SIZE / RATING ) _____________________________________________________________


BOLT SIZE:___________________ NO OF BOLTS:________________BOLTING MATERIAL:____________________
REQUIRED TORQUE:_______________________________

NO OF STEPS _____________________________

WRENCH MANUFACTURER: ______________________________________________________________________


SERIAL NUMBER: ________________________
TIGHTENING SEQUENCE:

CALIBRATION DATE__________________________________
REMARKS:

THE ABOVE BOLT TORQUE RECORD HAS BEEN SATISFACTORILY VERIFIED IN ACCORDANCE WITH THE DRAWINGS &
SPECIFICATIONS.
SIGNED :______________________________
Contractor Construction

SIGNED :

___________________
Contractor QCI

____________________________
NAME

____________________________
NAME

_______________
DATE:

_______________
DATE:

SIGNED
Company

NAME

DATE

You might also like