WPCS NO. DRG. NO.

Customer Component
Item No. Joint Type Weld Class
Weld
Position
Welding
Process
W.P.S. NO.
Preheat
(Min.)
Interpass
(Max.)
NDT (BEFORE &
AFTER SR)
Specification Dia. (mm)
#1
(CS and LS)
As per
Detail-AV
B T25mm 1G/3G SMAW
ATV/QC/WPS/11/2013
REV-0
E7018(AS PER
APPROVED LIST)
3.15,4,
5mm
125 C 250 C VT, MT & UT*
#1 + #2
As per
Sec-A-A
B T25mm 3G SMAW
ATV/QC/WPS/05/2012
REV-0
E7018(AS PER
APPROVED LIST)
3.15,4,
5mm
125 C 250 C VT, MT & UT*
#1 + #11
As per
Detail-U
B T25mm 3G SMAW
ATV/QC/WPS/05/2012
REV-0
E7018(AS PER
APPROVED LIST)
3.15,4,
5mm
125 C 250 C VT, MT & UT*
#1 + #3
As per
Detail-G-G
B T25mm 1G SMAW
ATV/QC/WPS/05/2012
REV-0
E7018(AS PER
APPROVED LIST)
3.15,4,
5mm
125 C 250 C VT, MT & UT*
#1 + #4
As per
Detail-F-F
B T25mm 1G SMAW
ATV/QC/WPS/05/2012
REV-0
E7018(AS PER
APPROVED LIST)
3.15,4,
5mm
125 C 250 C VT, MT & UT*
#1 + #7
As per
Detail-AU
B T25mm 1G SMAW 6-1-BA-1 REV-2
E7018(AS PER
APPROVED LIST)
3.15,4,
5mm
125 C 250 C VT, MT & UT*
#1 + #5
As per
Detail-J-J
B T25mm 1G SMAW 6-1-BA-1 REV-2
E7018(AS PER
APPROVED LIST)
3.15,4,
5mm
100 C 250 C VT, MT & UT*
#1 + #6
As per Sec-
D
B T25mm 3G SMAW
ATV/QC/WPS/05/2012
REV-0
E309 2 to 5mm 100 C 175 C VT, MT, UT* & RT*
#2 + #13
As per
Detail-S
B T25mm 1G/3G SMAW
ATV/QC/WPS/05/2012
REV-0
E7018(AS PER
APPROVED LIST)
3.15,4,
5mm
100 C 250 C VT, MT & UT*
ANDRITZ HYDRO
Welding Consumables
WELDING PROCESS CONTROL SHEET
V0312-S0-8301 Rev B ATV/WPC/V0312/46840 REV-0
OUTLET PIPE PO. NO.- 4500046840 DTD: 07.05.2014
WELD JOINT & PROCESS DETAILS
Page 1 of 4
WPCS NO. DRG. NO.
Customer Component
Item No. Joint Type Weld Class
Weld
Position
Welding
Process
W.P.S. NO.
Preheat
(Min.)
Interpass
(Max.)
NDT (BEFORE &
AFTER SR)
Specification Dia. (mm)
ANDRITZ HYDRO
Welding Consumables
WELDING PROCESS CONTROL SHEET
V0312-S0-8301 Rev B ATV/WPC/V0312/46840 REV-0
OUTLET PIPE PO. NO.- 4500046840 DTD: 07.05.2014
WELD JOINT & PROCESS DETAILS
#7 + #14
As per
Sec-K-K
C T25mm 1G SMAW
ATV/QC/WPS/05/2012
REV-0
E7018(AS PER
APPROVED LIST)
3.15,4,
5mm
75 C 250 C VT & MT
Notes:

Date
3. PT**= PENETRANT TESTING.
1. VT = VISUAL TEST, MT= MAGNETIC PARTICLE INSPECTION ,
2. UT*= ULTRASONIC TESTING, RT*= RADIOGHRAPHY TESTING,
ALOK DAS Prepared By: Approved By: A.C. GARG
Page 2 of 4
Unit No. 1
Proposed
Welder
Remarks Sign/Date
W-19,W-4,
W-1,-21, W-
3
W-2,W-6,
W-8
W-1,W-7 W-
21
W-2,W-6,
W-8
W-1,W-7 W-
21
W-2,W-6
W-2,W-6
W-2,W-6,
W-8
W-2,W-6,
W-8
Verification
WELDING PROCESS CONTROL SHEET
V0312-S0-8301 Rev B
OUTLET PIPE PO. NO.- 4500046840 DTD: 07.05.2014
WELD JOINT & PROCESS DETAILS
Page 3 of 4
Unit No. 1
Proposed
Welder
Remarks Sign/Date
Verification
WELDING PROCESS CONTROL SHEET
V0312-S0-8301 Rev B
OUTLET PIPE PO. NO.- 4500046840 DTD: 07.05.2014
WELD JOINT & PROCESS DETAILS
W-1,W-7 W-
21
Date
30.05.14
Page 4 of 4