ALLOCATION OF EFFECTIVE LENGTH & ERROR

YD
YD
ZD ZD
STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 30-May-14
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0 0; 2 0 6 0; L
MEMBER INCIDENCES
1 1 2;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
1 PRIS YD 0.4 ZD 0.6
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
1 FIXED
LOAD 1 LOADTYPE None TITLE LOAD CASE 1
JOINT LOAD
2 FY -120
PERFORM ANALYSIS PRINT ALL
START CONCRETE DESIGN
CODE INDIAN
ULY 1.33333 ALL
ULZ 1.16668 ALL
TRACK 2 ALL
DESIGN COLUMN 1
END CONCRETE DESIGN
FINISH
FILE 2
JOINT COORDINATES
1 0 0 0; 2 0 6 0;
MEMBER INCIDENCES
1 1 2;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
1 PRIS YD 0.6 ZD 0.4
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
1 FIXED
LOAD 1 LOADTYPE None TITLE LOAD CASE 1
JOINT LOAD
2 FY -120
PERFORM ANALYSIS PRINT ALL
START CONCRETE DESIGN
CODE INDIAN
ULY 1.333333 ALL
ULZ 1.166677 ALL
TRACK 2 ALL
DESIGN COLUMN 1
END CONCRETE DESIGN
FINISH