Detail calculation of progress report
L(m)
Total Volume
Vf =Af*L
(m3)
filling selected material of bridged dyke
Project:- 4000 Hectare Farm System & Flood Protection Works for West Godey Irrigation Project
Location : West Godey/Ber Ano Woreda /Shabele Zone / Ethiopian Somali Regional State
Client:- F.D.R.E.Ministry of Agriculture
Contractor:-Somali Water Works Construction Enterprise(SRWWCE)
Consultant:- Somali Design and Supervision Works Enterprise(SDSWE)
(Af)
(2hf*Q)+(2*Z*
hf^2) (m2)
CHA. OGL (m)
Top level
(m)
OGL+2.57M
Top Width
(m)Q
Bed width
(m)
Z Hf (m)