LO16-27D Log and Shot Job Report

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

WELL LO16-27D JOB SHOOT JOB STAGE 1st

Date To From Remarks


13-Jan-14 0:00 2:45 Rig up Artex unit
2:45 3:00 Safety meeting for RBT-CBL-VDL-CNL-GR-CCL
3:00 7:00 Run RBT-CBL-VDL-CNL-GR-CCL tool, log from 9832' to 5200'. POOH tool.
8:30 8:45 Safety meeting for shoting job.
8:45 11:00 Test lubricator with 2500 psi, ok.
13:00 14:30 1st run with 4" gun, <9249'-9243'>, <9239'-9235'>, 30 shots, 3spf, 0 psi . FL: 3350'
14:30 16:00 2th run with 4" gun, <9226'-9216'>, <9196'-9186'>, 60 shots, 3spf, 30 psi . FL: 2570'
16:00 17:10 3th run with 4" gun, <9216'-9208'>, 24 shots, 3spf, 85 psi . FL: 1800'
17:10 Rig downArtex unit.
Shooting Performance
Gun/Charge used:
Production Engineering Department D. Cajavilca & Trainees: FQ, JS, DS.
FORMATION: UPPER BASAL SALINA (9249'-9186')
4" gun: TC47H 39 gr, EH: 0.55", Pen: 46.2", 3spf
SISTEMA INTEGRADO DE
GESTION
FORMATO

CDIGO:
FO-PRODENG-001
VERSIN:
00
REPORTE DE BALEO/SENTAR TAPON