CONCRETO (BASICO) F'c=100 KG/CM2

MATERIALES
CEMENTO
GRIS NORMAL
AGUA

TON

$2,560.00

0.262000

ARENA

$670.72

M3

$50.00

0.202000

$10.10

M3

$800.00

0.605000

$484.00

GRAVA
M3
TRITURADA 3/4

$875.00

0.630000

$551.25

Subtotal: MATERIALES

$1,716.07

Costo directo

$1,716.07

Anlisis: BACON100

Unidad: M3

CONCRETO (BASICO) F'c=100 KG/CM2

MATERIALES
CEMENTO
GRIS NORMAL
AGUA

TON

$2,560.00

0.262000

$670.72

M3

$50.00

0.202000

$10.10

ARENA

M3

$800.00

0.605000

$484.00

GRAVA
M3
TRITURADA 3/4

$875.00

0.630000

$551.25

Subtotal: MATERIALES

$1,716.07

Costo directo

$1,716.07

Anlisis: BACON150

Unidad: M3

CONCRETO (BASICO) F'c=150 KG/CM2

MATERIALES
AGUA

M3

$50.00

0.202000

$10.10

CEMENTO
GRIS NORMAL
ARENA

TON

$2,560.00

0.306000

$783.36

M3

$800.00

0.580000

$464.00

GRAVA
M3
TRITURADA 3/4

$875.00

0.630000

$551.25

Subtotal: MATERIALES

$1,808.71

Costo directo

$1,808.71

Anlisis: BACON200

Unidad: M3

CONCRETO (BASICO) F`c=200KG/CM2

MATERIALES
CEMENTO
GRIS NORMAL
ARENA

TON

$2,560.00

0.348000

$890.88

$800.00

0.555000

$444.00

AGUA

M3

$50.00

0.202000

$10.10

GRAVA
M3
TRITURADA 3/4

$875.00

0.630000

$551.25

M3

Subtotal: MATERIALES

$1,896.23

Costo directo

$1,896.23

Anlisis: BAMOR013

Unidad: M3

MORTERO (BASICO) CEM:ARE 1:3

MATERIALES
CEMENTO
GRIS NORMAL
ARENA

TON

$2,560.00

0.458000

$1,172.48

M3

$800.00

1.131000

$904.80

AGUA

M3

$50.00

0.241000

$12.05

Subtotal: MATERIALES

$2,089.33

Costo directo

$2,089.33

64.43%
1.15%
8.06%
26.36%

100.00%

64.43%
1.15%
8.06%
26.36%

100.00%

1.04%
68.11%
6.99%
23.86%

100.00%

71.03%
6.13%
0.96%
21.88%

100.00%

87.27%
11.67%
1.07%
100.00%