CIN User Manuval For MM: BPX Community Project
CIN User Manuval For MM: BPX Community Project
USER MANUAL
MATERIAL MANAGEMENT
TABLE OF CONTENT
1THECOUNTRY INDIA VERSION(CIN)........................................................................................................................................ 3
1.1EXCISE REGISTRATION....................................................................................................................................................... 3
1.2EXCISE GROUP.................................................................................................................................................................... 3
Page 1 of 23 CIN User manuval for MM - BPX Community Project - SCN Wiki
21/09/2013 http://wiki.scn.sap.com/wiki/display/bpxproj/CIN+User+manuval+for+MM
1.3SERIES GROUP..................................................................................................................................................................... 3
2ESSENTIALMASTERDATAFOR EXCISE.................................................................................................................................... 3
2.1Chapter Id......................................................................................................................................................................... 3
2.2MaterialChapterID combination.................................................................................................................................... 3
2.3MaterialAssessable value................................................................................................................................................. 3
2.4CENVAT Determination...................................................................................................................................................... 3
2.5VendorExcise details......................................................................................................................................................... 3
3TAXCONDITION RECORDS........................................................................................................................................................ 3
3.1CenvatableExciseDuties Conditions (%ge)...................................................................................................................... 3
3.2CenvatableExciseDuties Conditions (Qty)...................................................................................................................... 3
3.3Non- Cenvatable Excise Duties Conditions(%ge)............................................................................................................. 3
3.4Non- Cenvatable Excise Duties Conditions(Qty).............................................................................................................. 3
3.5VAT Conditions................................................................................................................................................................... 3
3.6CST Conditions................................................................................................................................................................... 3
3.7ServiceTaxConditions: Non-Inventoried........................................................................................................................ 3
3.8ServiceTaxConditions: Inventoried................................................................................................................................. 3
3.9TaxConditionstobe Maintained...................................................................................................................................... 3
4ProcedureforClaimingCENVATfor Raw Materials.............................................................................................. 3
4.1CreatethePurchase Order................................................................................................................................................ 3
4.2Goods Receipt...................................................................................................................................................................... 3
4.2.1OptionI:Capture Excise Invoice @ Goods Receipt............................................................................................... 3
4.2.2OptionII:Capture Excise Invoice seperately.......................................................................................................... 3
4.3Tocheckthestatusofall the excise invoices captured.................................................................................................. 3
4.4PostExcise Invoice.............................................................................................................................................................. 3
5ProcedureforClaimingCENVATfor Capital Goods............................................................................................... 3
6ProcedureforClaimingDutiesfor Imported Goods............................................................................................. 3
7ProcedureforClaimingCENVATfor Raw Materials without Material ID.................................................... 3
8ClaimingCustomDutiesPurchased fromDealer (who has imported the Matrl)...................................... 3
9ProcedureforInventorizingCustom Duties Purchased for a Depot............................................................. 3
10ProcedureforCENVAT Reversals................................................................................................................................ 3
10.1ReturnDelivery(MvT: 122).............................................................................................................................................. 3
10.2CancellationofMaterial Documents.............................................................................................................................. 3
10.3PurchaseOrder Returns................................................................................................................................................... 3
10.4CENVATAdjustmentPostings(J1IH Excise J V).............................................................................................................. 3
10.4.1MakingAdjustmentPostingsfor Scrap................................................................................................................. 3
10.4.2MakingAdjustmentPostingsfor Materials Not Used in Production................................................................. 3
10.4.3MakingAdjustmentPostingsfor Additional Excise Paid to Vendors................................................................ 3
10.4.4MakingAdjustmentPostingsfor Money Transferred to PLA............................................................................. 3
10.4.5CancelingExcise Invoices......................................................................................................................................... 3
10.4.6MakingAdjustmentPostingsfor Other Transactions.......................................................................................... 3
11Subcontract Challan..................................................................................................................................................... 3
11.1NormalSubcontract Process........................................................................................................................................... 3
11.2SubcontractProcesswhereScrapisreceived fromVendor......................................................................................... 3
11.3SubcontractProcess:ReturnDeliveryTo Vendor.......................................................................................................... 3
11.4SubcontractProcess:CancellationofGoods Receipt................................................................................................... 3
11.5Subcontractingoverconsumptionorunder consumption.......................................................................................... 3
11.6Challancompleted180daysreverseand recredit the challan.................................................................................... 3
12FrequentlyAsked Question........................................................................................................................................... 3
Page 2 of 23 CIN User manuval for MM - BPX Community Project - SCN Wiki
21/09/2013 http://wiki.scn.sap.com/wiki/display/bpxproj/CIN+User+manuval+for+MM
1.1EXCISE REGISTRATION
Each entity is assigned its own excise registration number. Every factory that manufactures excisable goods is required to register separately.
1.2EXCISE GROUP
This is a unit within an excise registration, in India, which keeps its own set of excise records.
Whereas the excise registration reports to the excise authorities, the excise group is a purely internal organizational unit. Each excise group keeps records of all transactions that have to be reported to the
excise authorities. When the time comes to present these records to the authorities, the excise registration compiles the information fromall of its excise groups.
Excise Group determines Excise Register number range
All excise Reports (RT-12, PLA, RG23A Part I &II , RG23C Part I & II) will be generated based on this Excise Group.
1.3SERIES GROUP
Series Group determines number range for outgoing excise invoice / challan ( e.g. 57AC5 challan etc.)
2.1Chapter Id
Select Chapter Id
Go to New Enteries and Enter Chapter Id and Description.
Page 3 of 23 CIN User manuval for MM - BPX Community Project - SCN Wiki
21/09/2013 http://wiki.scn.sap.com/wiki/display/bpxproj/CIN+User+manuval+for+MM
2.2 Material Chapter ID combination
Select material chapter ID combination box and then press icon.
Select Material & Chapter Id
Enter material, plant and chapter ID combination in the respective tabs.
Go to New Enteries and Enter the details
If the material can be sent outside for subcontracting purpose then put a tick in the check box
In the material type tab select appropriate material type.
If it is a input material then select the tab Raw material
If it is capital itemthen select Assets.
If it is a in-house produced material then select RG1.
Select GR --X ref to specify whether credit is allowed only for single goods receipt or multiple goods receipt with single credit or multiple goods receipt with multiple credits.
In the declared column enter X if the material is declared to excise
Also enter the date of declaration.
2.4CENVAT Determination
In this section you have to enter the input and output relationship of the material with combination of plant, default indicator for modvat.
Companies are required to file with the Excise authorities, a list containing the excisable finished products manufactured and the excisable input materials required for such production, to avail Modvat.
It is possible that an input material may be used in the production of more than one finished product. However, if such a material is mainly used for the manufacture of a particular finished product then the
input material is identified to be the default material. The default indicator
is marked for such material.
Select Cenvat Determination
Go to New Enteries and Enter the details
For VAT, the key combination will be as shown below. Select one combination and maintain values
For service Tax, the key combination will be only tax classification
Page 6 of 23 CIN User manuval for MM - BPX Community Project - SCN Wiki
21/09/2013 http://wiki.scn.sap.com/wiki/display/bpxproj/CIN+User+manuval+for+MM
Page 8 of 23 CIN User manuval for MM - BPX Community Project - SCN Wiki
21/09/2013 http://wiki.scn.sap.com/wiki/display/bpxproj/CIN+User+manuval+for+MM
The following can be changed at the time of Capturing
(1) Chapter ID
(2) Excise invoice quantity
(3) Base Value
(4) Excise Rates / Amount.
The Goods Receiver will make one GR for each excise invioce. The Supplier can later on submit a
separate Commercial invoice for all the supplies & excise Invoices. Invoice verification will be based on Purchase Order against which several line items will appear based on GR document number.
At the end of the day, the Goods receiver will generate a list of cases where items are cenvatable &
excise invoices are `Captured. This report will show the Internally generated excise serial numbers. The goods receiver will send this report attaching all the cenvat documents received during the day.
4.3 To check the status of all the excise invoices captured
Transaction code J1I7
Selection criteria can be mainly Excise Group.
You can select further the following
(1) No posting done
(2) Part I & Part II posted
(3) Part 1 posted, part II not posted.
4.4Post Excise Invoice
At the end of the day, the Excise Personnel will receive a list from Stores attaching all the cenvat documents during the day. Then based on this list, he will enter transaction code J 1IEX / J 1IEX_P Select
`POST if no change is required.
Now you can `POST CENVAT
Systemwill post the cenvat amount in RG23 Part II based on material type (inputs / Capital Goods).
Page 9 of 23 CIN User manuval for MM - BPX Community Project - SCN Wiki
21/09/2013 http://wiki.scn.sap.com/wiki/display/bpxproj/CIN+User+manuval+for+MM
However if you want to change the excise details go to the Change mode...
Here you can change the following:
1. Chapter Id
2. Description of material
3. Invoice No.
4. Document date
5. Ship from( under miscellaneous tab)
6. Base price
7. Excise duty (both higher side as well as lower side, then that present)
Systemwill show the RG23 Part 1 serial no., GR no. PO number. You can change the excise vendor also.
5 Procedure for Claiming CENVAT for Capital Goods
8 Claiming Custom Duties Purchased from Dealer (who has imported the Matrl)
Use : The materials are procurred froma domestic vendor who imports the material. This domestic Vendor passes on the CVD and SAD duties, which have to be captured as BED and AED.
Step Descripti on Input s T.Code Role
1 Maintain Excise Rate Maintenance details Material, chapter Id, Assessable Value J 1ID Purchaser / Buyer /
Excise Personnel
2 Maintain Tax conditions Maintian tax conditions with BED / AED conditions as 0%, as this is going to be
replaced by CVD and SAD values fromthe pricing procedure.
FV11 Purchaser / Buyer /
Excise Personnel
3 Create Purchase Order Vendor / Material / Qty / Plant / Price / Tax Code ME21N Purchaser / Buyer
NOTE Maintain CVD and SAD values in the pricing
procedure PO Condition Tab.
PO Line Item Condition tab specify CVD Amt for the condn type J EXCand
SAD for condn type ZADC.
ME21N Purchaser / Buyer
3 Post Invoice for CustomVendor and Foreign
Vendor.
PO / Vendor code : Planned Delivery Costs MIRO Accounts
4 Goods Receipt (Capture Excise Invoice) PO No. / Qty / Excise Inv #/ Ex. Invoice Dt MIGO Stores
5 List of Excise Invoice, where it is captured but
not Posted
Excise Group J 1I7 Excise Personnel
6 Change Excise Invoice ( if Required) Vendor Ex. Inv / Date J 1IEX Excise Personnel
7 PostExciseInvoice Vendor Ex. Inv / Date J 1IEX Excise Personnel
8 Updation of Registers Excise Group / Start Dt / End Dt J 1I5 Excise Personnel
9 Print of Registers Excise Group / Start Dt / End Dt ZJ 2I6 /
ZJ 2I6RG23C
Excise Personnel
9 Procedure for Inventorizing Custom Duties Purchased for a Depot
Use : The materials are procurred for a depot, where, the CustomDuties get inventorized, captured in transaction J 1IG and then the same duties are picked in sales invoice for passing on to Customer.
Process:
Step Descripti on Input s T.Code Role
1 Maintain Excise Rate Maintenance details Material, chapter Id, Assessable Value J 1ID Purchaser / Buyer / Excise
Personnel
2 Maintain Zero Tax conditions Maintain Zero Tax conditions FV11 Purchaser / Buyer / Excise
Personnel
3 Create Purchase Order Vendor / Material / Qty / Plant / Price / Zero Tax Code ME21N Purchaser / Buyer
NOTE Maintain all the CustomDuties in PO Line item condition tab For External
Vendors and also Inter Company purchases
The following Condition types needs to be selected for
inventorizing the Custom Duties:
J CDB - IN Basic Customs
J CV3- IN CVD Inventory
J ECI- IN ECS-CVD:Inventory
J 1CI- IN HECS-CVD: Inven'y
J EDB- IN ECS on Cust Duty
J SDB- IN SH ECS on BCD
J ADI- IN Ad Duty Cus:Inven
ME21N Purchaser / Buyer
4 Goods Receipt (Do not capture Excise Invoice) PO No. / Qty MIGO Stores
Page 12 of 23 CIN User manuval for MM - BPX Community Project - SCN Wiki
21/09/2013 http://wiki.scn.sap.com/wiki/display/bpxproj/CIN+User+manuval+for+MM
5 Capture Excise Invoice for Depot Material Doc #(GR), Excise Group, Excise Inv #/ Dt. J 1IG Excise Personnel
Header Material
Page 16 of 23 CIN User manuval for MM - BPX Community Project - SCN Wiki
21/09/2013 http://wiki.scn.sap.com/wiki/display/bpxproj/CIN+User+manuval+for+MM
Sub-Component
2. Transfer Post ing of Sub-component s to Vendor: (ME2O) 1.
Select the Line Itemand Create Delivery or Post Goods Issue
3. Create Subcontract Chal lan w.r.t t he Transferred Mat erial Document: (J1IF01) 2.
4.
3.
4. Pri nt of Subcont ract Challan (J1IF11)
4.
Page 17 of 23 CIN User manuval for MM - BPX Community Project - SCN Wiki
21/09/2013 http://wiki.scn.sap.com/wiki/display/bpxproj/CIN+User+manuval+for+MM
5. Goods Receipt: (MIGO)
5.
Select Refer Subcontracting Challan, and in the sub-window, specify the correct Challan No
If the Challan No specified is that of different Vendor, then the following below message is shown.
If the Challan No specified is that of different PO, then the following below message is shown.
Page 18 of 23 CIN User manuval for MM - BPX Community Project - SCN Wiki
21/09/2013 http://wiki.scn.sap.com/wiki/display/bpxproj/CIN+User+manuval+for+MM
13
Complete the cahllan Challan number/fiscal year J 1IF13 Excise
personnel
11.6 Challan completed 180 days reverse and recredit the challan
Step Descripti on Input s T.Code Role
1 Challan Reverse Challan No./Fiscal year J 1IF13 Excise Personnel
2 Option I: Recive the material back . 542 movement type/ material/ vendor MIGO Stores
3 Reconcile the challan with 542 Matrl Doc. Materail doc / Fiscal year / challan no/Excise group / Series group J 1IFQ Excise Personnel
4 Complete & Recredit the challan. Challan number /fiscal year J 1IF13 Excise Personnel
5 Option II: Receive the Material after 180 days as finished goods as per PO. MIGO Goods Receipt MIGO
6 Reconcile the challan with above GR Doc. Materail doc / Fiscal year / challan no/Excise group / Series group J 1IFQ Excise Personnel
7 Complete& recredit the challan. Challan number /fiscal year J 1IF13 Excise Personnel
12 Frequently Asked Question
Question: For capital Goods, in normal posting the AED CENVAT posted for the present year is 50%, whereas it should be 100%.
Answer : Select Excise Subtransaction type IPat the time of Posting at Excise Header Tab, which will post AED as 100%, and BED, Ecess and SHEcess as 50% for this financial year.
Question:DuringPostofExciseInvoice, the system doesnt allow to increase the Excise Duty Value.
Answer: The change in duty values needs to be done in Change Excise Invoice transaction @ J 1IEX and not during Posting of Excise Invoice.
Question : I have to specify BED manually and not through condition records.
Answer:Themanualexcise amount for BED can be specified in the Pricing Procedure ( PO Condition tab), wherein it will update the Tax Procedure.
1 Child Page
cin bh
No labels
1 Comment
Guest
verynice work pramod kumar.
Follow SCN
Cont act Us SAP Help Portal
Privacy Terms of Use Legal Disclosure Copyright
Page 23 of 23 CIN User manuval for MM - BPX Community Project - SCN Wiki
21/09/2013 http://wiki.scn.sap.com/wiki/display/bpxproj/CIN+User+manuval+for+MM