Meeting Records: Project Comments Contract # Time Table

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Meeting Records

FT///001 /
2
Meeting #: office meeting Record # 12001
Our Meeting Leaderken
Autotec Presents:

bz-vdm
Your Meeting Leader: Daniel
Your Comapny Presents: Marcio

Meeting Date:27 November 2012
Place office
Writerken



Project

Comments
/
Contract #

Time Table

Project Manager
. New products
DEVELPOMENT
CLUTCH DISC DAFRA RIVA 150
CLUTCH DISC DAFRA APACHE 150 FROM TVS COMPANY
CLUTCH DISC HONDA BIZ 100 2013 22201-KVR-C01
CLUTCH DISC HONDA CBR250R 22201-KYJ-902
CLUTCH DISC HONDA CB500 98-04 22201-KAE-000,22201-KM4-000,22202-
ML4-611
CLUTCH DISC KAWASAKI NINJA 250 13088A-13088
CLUTCH DISC YAMAHA XT600Z/E 5Y1-16321-00,5Y1-16331-01
CLUTCH DISC SUZUKI GS500 21441-37100
AIR FILTER DAFRA RIVA 150
AIR FILTER DAFRA APACHE 150
AIR FILTER HONDA BIZ 100 2013 17210-K19-910
AIR FILTER HONDA CBR250 17221-KYJ-640
AIR FILTER HONDA POP 100 17211-KRE-850
AIR FILTER HONDA LEAD 110 17210-GFM-K00
AIR FILTER KAWASAKI NINJA 250
AIR FILTER SUZUKI BURGMAN 125 13700-37G00
AIR FILTER SUZUKI EN125 13780-38301
OIL FILTER SUZUKI BURGMAN 125 16510-05240
CARBURETOR REPAIR KIT CRF230
CARBURETOR REPAIR KIT YES 125 AFTER 2008
CARBURETOR REPAIR KIT YES 125 BEFORE 2008

Meeting Records
FT///001 /


2. Product correction
Vedamotors give the sample of HONDA NX400 FALCON complete air box and
autotec will send revised counter sample asap.

.Claims
REAR HUB BUSH IN 12-KEN-073,total claim amount is $5900.00 and autotec
need to make free replacement asap after check with supplier.
WRONG STICKER IN SHIPMENT 12-KEN-060,total cost $6700 and need to check
out while back to office.
WRONG STICKER IN SHIPMENT 12-KEN-023,total labor cost to pay
$1275.00.autotec need to compensate it.
PUSH ROD in shipment 12-KEN-071,model 397 wasnt tube type and model KCH
was welding with drill instead of without drill point. Autotec need to correct it in the
next shipment.
CARBURETOR REPAIR KITS in shipment 11-KEN-055,parts missing or
wrongly,total claim amount is $8476.00 and will talk to supplier to get claim.

4. Packing pallet Ken will inform the cost of wood pallet and decide if it is suitable to use it.

Confirmed by parties as above, All Team will follow up,and Feedback Results In time.
.

Signature :

You might also like