Wbs Jacket

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

Pengadaan material

Material stock yard


Marking & cutting profile
Butt joint frame & brace member
Setting of final assembly support
Install of jacket botom legs to final position
Block assembly of jacket panels
Roll of jacket panels
Install of guy wire
Install of diagunal braces
Install of jacket top legs
Install of horizontal & diagonal braces
Install of mudmat panel
Install of top panel
Install of jacket appurtanance
Touch up coating
jacket load out
jacket sail out
jacket launch
Pile lifting
Pile driving / hammering
Conductor and boat landing installation
Crown plate welding
up ending jacket
A1 Procurement
A2 Fabrikasi
A3 Instalasi
kode pekerjaan sub pekerjaan
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1
4
2
3
4
1
2
2
3
1
3
3
3
3
2
1
4
1
3
1
ballast control and flooding 1
Lifting process 1
1
1
1
1
WAKTU
sub-sub pekerjaan
Durasi
(minggu)
6 1 2 3 4 5
2 3 4 1 2 3 4
WAKTU
6 7
Pengadaan material
Material stock yard
lower deck
upper deck
lower deck
upper deck
lower deck
upper deck
lower deck
upper deck
lower deck
upper deck
Pre-commisioning
Lifting Padeye install
Deck load out
Deck sail out
Lifting process
Crown plate welding
Deck connection
Deck Installed
B1 Procurement
B2 Fabrikasi
B3 Instalasi
Deck erection
Deck panel assembly
floor plate install
handrail and grating install
Piping & E/I support install
Painting
kode pekerjaan sub pekerjaan sub-sub pekerjaan
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
4
2
5
5
4
4
3
3
3
3
2
2
1
1
1
1
1
3
1
1
1
1
WAKTU
1 2 3 4 5 6 7
Durasi
(minggu)