The document contains performance rankings and metrics for several subcontractors (PMT, Masindo, Trimba, etc.) across various regions and categories in February 2014. Masindo ranked first overall with a score of 96.82, followed by Trimba with 97.63, and PMT with 98.27. The metrics include things like technical branch scores, preventative maintenance achievement, TT SLA achievement, punchlist completion rates, and both 2G and 3G network availability across different regions. Overall network availability was highest for PMT at 98.38% for 3G and 98.17% for 2G.
The document contains performance rankings and metrics for several subcontractors (PMT, Masindo, Trimba, etc.) across various regions and categories in February 2014. Masindo ranked first overall with a score of 96.82, followed by Trimba with 97.63, and PMT with 98.27. The metrics include things like technical branch scores, preventative maintenance achievement, TT SLA achievement, punchlist completion rates, and both 2G and 3G network availability across different regions. Overall network availability was highest for PMT at 98.38% for 3G and 98.17% for 2G.
The document contains performance rankings and metrics for several subcontractors (PMT, Masindo, Trimba, etc.) across various regions and categories in February 2014. Masindo ranked first overall with a score of 96.82, followed by Trimba with 97.63, and PMT with 98.27. The metrics include things like technical branch scores, preventative maintenance achievement, TT SLA achievement, punchlist completion rates, and both 2G and 3G network availability across different regions. Overall network availability was highest for PMT at 98.38% for 3G and 98.17% for 2G.
The document contains performance rankings and metrics for several subcontractors (PMT, Masindo, Trimba, etc.) across various regions and categories in February 2014. Masindo ranked first overall with a score of 96.82, followed by Trimba with 97.63, and PMT with 98.27. The metrics include things like technical branch scores, preventative maintenance achievement, TT SLA achievement, punchlist completion rates, and both 2G and 3G network availability across different regions. Overall network availability was highest for PMT at 98.38% for 3G and 98.17% for 2G.
2 Masindo 92.65 2 92.65 2 3 Trimba 92.43 3 92.43 3 4 Infratech 90.78 4 90.78 4 5 Xerindo 84.85 5 84.85 5 6 ADW 81.40 6 81.40 6 Subcont Ranking - Feb 2014 X-1 (month) Rank Tech Branch Score Rank Score Rank NAV 40% 2 Masindo 96.82 3 Trimba 97.63 5 Xerindo 96.47 1 PMT 98.27 6 ADW 98.61 4 Infratech 99.23 Ranking Region TT SLA Achievement Reporting Preventive maintenance Total Score 30% 0% 30% 80.89 98.85 92.65 78.38 99.55 92.43 58.27 95.92 84.85 90.09 99.77 96.27 59.92 79.93 81.40 70.98 99.3 90.78 Subcont Total PM Scoring Remark Trimba 99.29% PMT 99.60% Masindo 98.11% Infratech 99.29% Xerindo 94.65% Adyawinsa 83.67% PM Scoring =0.6*PM Achiement + 0.4*BoQ Submission Punchlist BoQ submission Subcont Boq Submission remark Trimba 100% PMT 100% Masindo 99% Infratech 99% Xerindo 96% Adyawinsa 80% Boq Submission = Total BoQ Submitted/Total Punchlist required BoQ PM Achivement Subcont Month Region Plan Actual Adyawinsa Feb CEK 230 186 Adyawinsa Feb Central Java 732 732 Adyawinsa Feb East Java 586 404 Adyawinsa Feb Jakarta 527 499 Masindo Feb Bodetaban 635 647 Masindo Feb Central Sumatera 99 99 Masindo Feb East Java 275 275 Masindo Feb N.Sul 69 69 Masindo Feb North Sumatera 422 351 Masindo Feb S.Sul 172 172 Trimba Feb Central Java 295 296 Trimba Feb SSE 349 349 Trimba Feb SSW 275 275 Trimba Feb West Java 256 256 Trimba Feb Central Sumatera 304 285 PMT Feb Bali Lombok 315 310 PMT Feb Bekasi 175 174 PMT Feb West Java 606 607 Xerindo Feb Central Sumatera 304 285 Infratech Feb West Kalimantan 196 195 PM Achivement = Actual/Plan Persentage/Month 81% 100% 69% 95% 102% 100% 100% 100% 83% 100% 100% 100% 100% 100% 94% 98% 99% 100% 94% 99% Count of Subcont Weigting Crit I 20% Crit II 30% Maj I 40% Maj II 10% Running TT % TT running/Total TT Total TT Achievement = Note : if In region there is no some TT Criteria, weighting of That TT will be cumulative with 1 step low or High another TT severity For Example if in Region X there is no Crit I TT, Weighting Crit I will sum up with Crit II become total Weighting Crit II TT Per Subcont Within SLA Out Of SLA Total TT Close SLA Achivement ADYAWINSA Crit_I 3 3 0.00% Crit_II 67 10 77 87.01% Maj_I 60 24 84 71.43% Maj_II 7685 905 8590 89.46% Min_I 20 20 100.00% INFRATECH Crit_II 9 2 11 81.82% Maj_II 930 236 1166 79.76% MASINDO Crit_II 83 12 95 87.37% Maj_I 96 31 127 75.59% Maj_II 12318 1282 13600 90.57% Close 20% * SLA Crit I +30% SLA Crit II +40% SLA Maj I + 10 % SLA Maj II - Running TT Min_I 104 17 121 85.95% PMT Crit_II 50 50 100.00% Maj_I 76 15 91 83.52% Maj_II 5568 493 6061 91.87% Min_I 37 2 39 94.87% TRIMBA Crit_I 1 1 100.00% Crit_II 45 7 52 86.54% Maj_I 50 24 74 67.57% Maj_II 5149 665 5814 88.56% Min_I 42 3 45 93.33% XERINDO Crit_I 1 1 0.00% Crit_II 37 7 44 84.09% Maj_I 32 16 48 66.67% Maj_II 2393 632 3025 79.11% Min_I 22 1 23 95.65% Grand Total 34917 4389 39306 Critical I (20%) Runing TT Total TT Note : if In region there is no some TT Criteria, weighting of That TT will be cumulative with 1 step low or High another TT severity For Example if in Region X there is no Crit I TT, Weighting Crit I will sum up with Crit II become total Weighting Crit II Total TT Running Total TT %Running TT TT SLA Achivement total TT Achivement 3.70% 59.92% 3 0.00% 77 26.10% 7 91 28.57% 319 8909 8.95% 11 31 0 9.81% 70.98% 11 40.91% 128 1294 39.88% 0 2.09% 80.89% 95 43.68% 11 138 30.24% 212 13812 9.06% 20% * SLA Crit I +30% SLA Crit II +40% SLA Maj I + 10 % SLA Maj II - Running TT 75 196 0 2.50% 90.09% 50 50.00% 5 96 33.41% 97 6158 9.19% 58 97 0 3.47% 78.38% 1 20.00% 52 25.96% 11 85 27.03% 164 5978 8.86% 40 85 0 1.54% 58.27% 1 0.00% 44 25.23% 1 49 26.67% 45 3070 7.91% 3 26 1188 40494 Critical2 (30% Major I (40%)Major 2 (10%) Running TT Subcont 3G NAV 2G NAV ADYAWINSA 99.15% 98.06% INFRATECH 99.24% 99.23% MASINDO 97.16% 96.49% PMT 98.38% 98.17% TRIMBA 98.49% 97.18% XERINDO 96.75% 96.19% Grand Total 98.12% 97.32% Regional Subcont NAV 3G ADYAWINSA Central East Kalimantan 98.72% ADYAWINSA Central Java 98.99% ADYAWINSA East Java 99.62% ADYAWINSA Jabodetabek 99.13% INFRATECH West Kalimantan 99.24% MASINDO Central Sumatera 98.29% MASINDO East Java 99.14% MASINDO Jabodetabek 96.00% MASINDO North Sulawesi 98.28% MASINDO North Sumatera 96.25% MASINDO South Sulawesi 99.81% PMT Bali Lombok 99.67% PMT Jabodetabek 97.76% PMT West Java 98.07% TRIMBA Central Java 99.06% TRIMBA South Sumatera East 98.16% TRIMBA South Sumatera West 97.49% TRIMBA West Java 99.53% XERINDO Central Sumatera 96.71% XERINDO North Sumatera 98.19% Grand Total 98.12% Average Subcont 98.61% 99.24% 96.83% 98.28% 97.83% 96.47% 97.72% Regional Subcont NAV 2G ADYAWINSA Central Java 98.96% ADYAWINSA East Java 97.09% ADYAWINSA Jabodetabek 99.00% INFRATECH West Kalimantan 99.23% MASINDO Central Sumatera 95.79% MASINDO East Java 96.81% MASINDO Jabodetabek 95.90% MASINDO North Sulawesi 98.19% MASINDO North Sumatera 96.09% MASINDO South Sulawesi 99.75% PMT Bali Lombok 99.63% PMT Jabodetabek 97.62% PMT West Java 97.52% TRIMBA Central Java 99.09% TRIMBA South Sumatera East 95.86% TRIMBA South Sumatera West 95.70% TRIMBA West Java 99.21% XERINDO Central Sumatera 96.15% XERINDO South Sumatera East 97.47% Grand Total 97.32%