Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

NDEX

ACKNOWLEDGEMENT
1. INTRODUCTION
2.1. ABOUT THE ORGANIZATION
2.2. CAPABILITY SPECTRUM OF L&T ECC
2.3. L&T VISION
2.4. SAFETY POLICY
2.5. QUALITY POLICY
2.6. HR POLICY
2.7. L&T VALUES
2.8. DEPARTMENTS AND THEIR ROLES

2. PROJECT OVERVIEW
3.9. HIGHLIGHTS
3.10. PARTIES INVOLVED
3.11. PROJECT SYNOPSIS
3.12. ORGANIZATION CHART LEVEL 1

3. HEALTH, SAFETY & ENVIRONMENT
4.13. OBJECTIVE OF HSE
4.14. INTIATIVES OF EHS
4.15. GENERAL HSE PPES & SAFETY DEVICES
4.16. ACTS FOLLOWED AT THE L&T SITE
4.17. LIST OF ALL THE DOCUMENTS IN THE DEPARTMENT
4. QUALITY
5.18. PROJECT QUALITY PLAN (PQP)
5.19. QUALITY MANUAL
5.20. QUALITY MANAGEMENT SYSTEM (QMS)
5.21. QUALITY IMPLEMENTATION AT SITE
5.22. LIST OF ALL THE DOCUMENTS
5.23. VARIOUS TEST CONDUCTED
5.24.1. SIEVE ANALYSIS
5.24.2. WATER ABSORPTION TEST
5.24.3. MOISTURE CONTENT CORRECTION
5.24.4. SLUMP TEST
5.24.5. COMPRESSIVE STRENGTH OF THE CONCRETE

5. FORMWORK
6.24. L&T FORMWORK BUSINESS UNIT
6.25. TYPES OF FORMWORK USED AT RMZ GALLERIA
6.26. DESIGN OF FORMWORK
6.27. COMPONENTS OF FORMWORK
6.28. LIST OF ALL THE DOCUMENTS

6. PLANT AND MACHINERY
7.29. INTRODUCTION
7.30. BATCHING PLANT
7.31.6. KEY FEATURES
7.31. RESPONSIBLE STAFF
7.32. EQUIPMENT CURRENTLY ON SITE
7.33. APPLICABLE DOCUMENTS

7. OBSERVATIONS ON SITE