Golf Ball Bridge Challenge
Golf Ball Bridge Challenge
Materials __________________________________
Presenters ___________________________________________________________________________
The Challenge
free-standing bridge
has a track that is capable of
supporting a rolling golf ball
must span an opening of 30cm wide
one side of the track must be at least
5cm above the surface of the table
golf ball must roll from one end of
the bridge to the other without
being pushed
the bridge must withstand at least 3
trials
Materials
Time limit
15 minutes designing
40 minutes building
testing will be done
the following day
Designing
In the space below, sketch two design ideas to share with your team. Add labels including
measurements. As a group, you will select one design to follow.
Design 1
Design 2
Final Design: Sketch your final design below. Include final measurements
Conclusion
Did your bridge pass the test? ________________________
What are some areas of weakness (structural stress, fatigue, or failure) that your structure had?
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
What ways could you have made it better?
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________