APPROVED A

Approved without exception


APPROVED WITH COMMENTS AC
Approved Subject to Incorporation of comments
RETURNED FOR CORRECTION RT
Insufficient Information/ Detail
Resubmit for Approval
REJECTED RJ
Complete redesign required
RECEIVED FOR INFORMATION I
Returned without comments
RECEIVED FOR INFORMATION IC
Returned with comments
any obligations covered under contract
Engineer:
Discipline:
Date:
Note: Approval or comments does not relieve the Contractor of
Pyry Energy
TWO(2) X 500MW
MONG DUONG 1 THERMAL POWER PLANT
David Langhorne
Senior Mec Engineer
22-May-13
Pyry Comment
Two(2) x 500MW Mong Duong 1 Thermal Power Plant Project

Dwg. / Doc. Title
Guidance for Maintenance
Disassembly Areas for U1
& U2 Steam Turbine
Dwg. / Doc. No.
MD1-0-V-111-01-00047
MD1-0-V-111-01-00048
HDEC DT No. MD1-HDH-EVN-X-3205 Submitted Date Rev. A
Pyry TR No. Received Date
New HDEC DT No.
Re-Submitted
Date

Status Received for Information Returned Rejected

Page 1 / 1
No. Pyrys Comments Contractors Reply / Action
1 The notes shall be removed. The content of
the notes is totally unacceptable.


2 The arrangement of the components shall
considered dismantling sequence and shall not
be random.


3 Before resubmission HDEC shall confirm and
demonstrate that the operating floor can
withstand the loads applied by the stored
components.


4 Indicate the storage location for the lifting frames
and fixtures required for dismantling the turbine.


5 The notes at storage areas C, D, N and O are
not legible.