The document provides status updates and comments on engineering drawings and documents submitted for the Mong Duong 1 Thermal Power Plant Project. It includes:
- The status is "Received for Information – Returned Rejected", indicating the drawings were received but require a complete redesign.
- There are 5 comments noting issues with the notes, dismantling sequence, load testing of the operating floor, missing storage locations, and illegible notes that must be addressed before resubmission.
- Resubmission will require confirmation from HDEC that the comments have been addressed and operating floor loads have been evaluated before approval can be granted.
The document provides status updates and comments on engineering drawings and documents submitted for the Mong Duong 1 Thermal Power Plant Project. It includes:
- The status is "Received for Information – Returned Rejected", indicating the drawings were received but require a complete redesign.
- There are 5 comments noting issues with the notes, dismantling sequence, load testing of the operating floor, missing storage locations, and illegible notes that must be addressed before resubmission.
- Resubmission will require confirmation from HDEC that the comments have been addressed and operating floor loads have been evaluated before approval can be granted.
The document provides status updates and comments on engineering drawings and documents submitted for the Mong Duong 1 Thermal Power Plant Project. It includes:
- The status is "Received for Information – Returned Rejected", indicating the drawings were received but require a complete redesign.
- There are 5 comments noting issues with the notes, dismantling sequence, load testing of the operating floor, missing storage locations, and illegible notes that must be addressed before resubmission.
- Resubmission will require confirmation from HDEC that the comments have been addressed and operating floor loads have been evaluated before approval can be granted.
APPROVED WITH COMMENTS AC Approved Subject to Incorporation of comments RETURNED FOR CORRECTION RT Insufficient Information/ Detail Resubmit for Approval REJECTED RJ Complete redesign required RECEIVED FOR INFORMATION I Returned without comments RECEIVED FOR INFORMATION IC Returned with comments any obligations covered under contract Engineer: Discipline: Date: Note: Approval or comments does not relieve the Contractor of Pyry Energy TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT David Langhorne Senior Mec Engineer 22-May-13 Pyry Comment Two(2) x 500MW Mong Duong 1 Thermal Power Plant Project
Dwg. / Doc. Title Guidance for Maintenance Disassembly Areas for U1 & U2 Steam Turbine Dwg. / Doc. No. MD1-0-V-111-01-00047 MD1-0-V-111-01-00048 HDEC DT No. MD1-HDH-EVN-X-3205 Submitted Date Rev. A Pyry TR No. Received Date New HDEC DT No. Re-Submitted Date
Status Received for Information Returned Rejected
Page 1 / 1 No. Pyrys Comments Contractors Reply / Action 1 The notes shall be removed. The content of the notes is totally unacceptable.
2 The arrangement of the components shall considered dismantling sequence and shall not be random.
3 Before resubmission HDEC shall confirm and demonstrate that the operating floor can withstand the loads applied by the stored components.
4 Indicate the storage location for the lifting frames and fixtures required for dismantling the turbine.
5 The notes at storage areas C, D, N and O are not legible.