This 3 sentence document summary provides the high level information about the reference document:
The reference document outlines a suggested construction sequence for Manhattan Structures 2 and Facilities Fit-Out from September 2011. It relates to contract CM012 and provides a revision of the construction sequence. The document number is C C 012 Cont r ac t CM012 and it contains information to aid the construction project.
This 3 sentence document summary provides the high level information about the reference document:
The reference document outlines a suggested construction sequence for Manhattan Structures 2 and Facilities Fit-Out from September 2011. It relates to contract CM012 and provides a revision of the construction sequence. The document number is C C 012 Cont r ac t CM012 and it contains information to aid the construction project.
This 3 sentence document summary provides the high level information about the reference document:
The reference document outlines a suggested construction sequence for Manhattan Structures 2 and Facilities Fit-Out from September 2011. It relates to contract CM012 and provides a revision of the construction sequence. The document number is C C 012 Cont r ac t CM012 and it contains information to aid the construction project.
REFERENCE DOCUMENT Suggested Construction Sequence (Rev-1) C C 012 Cont r ac t CM012 M h tt St t 2 d F iliti Fit O t Manhattan Structures 2 and Facilities Fit-Out September 2011 p