Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

(gm)

(gm)
(gm) (gm)
(gm) (%)
(gm) (%)
Observations:
Conform to the specifications
100
47
Pan mass
Fine mass
SIEVE ANALYSIS FOR SAND
81.1
14
2.7
315.89
University of Nairobi
Department of Civil & Construction Engineering
(Highways Laboratory)
Initial dry sample mass
100.0
2.36
1.18
0
0.075
2.7
91.83
26.61
43.37 4.3
10 27 97.3
9.2
4.76 94.6
49.5
16.6 33.0
#VALUE!
997.02
4.7
Min(%) Max (%)
Acceptance Criteria
Equipment
0.6
0.3 329.73
20.85
Sieve set N :
141.74 14.2
GRADING CURVE
0.0
Washed dry sample mass
Initial dry sample mass + pan 1100
90.3
31.6

Sieve size (mm)
Acceptance Criteria
1000
Fine percent 1053
953
Washed dry sample mass + pan
Verified :Lab. Incharge
Retained mass (gm) % Retained (%)
Cumulative passed
percentage (%)
Scale N :
Date 0-Jan-00
Technician
0-Jan-00
2.4 0.15
Shaker N

0
10
20
30
40
50
60
70
80
90
100
0.01 0.1 1 10 100
P
a
s
s
i
n
g

(
%
)

Sieves (mm)

You might also like