Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

1 2 3 4 5 6 7 8 9 10 11 12

I.
II.
1
1.1 Field visit atau survey lapangan
1.2 Review dan analisa data proses fasilitas existing
1.3 Pengumpulan Data
2
2.1
1 Applicable Codes and Standards
2 General Documentation Symbols & Legends
3 Overall Project Schedule
4 Project Philosophies
5 Master Plan Drawings for Facilities
6 Overall Plant Layout Drawing
7 Overall Piping and Equipment
8 Operating Philosophies
9 Master Document and Item List Index
10 Engineering Design Calculation Sheets
11 Cost Estimate
2.2 Process
1 Design Basis
2 Process Description
3 Process Block Flow Diagram
4 Process Flow Diagram (PFD), Incl. Material Balance
5 Process & Instrumentation Diagram (P&ID)
6 Process Equipment Datasheet
7 Process Heat & Material Balance
8 Line Sizing Criteria
9 Utilities Block Flow Diagram
10 Utility Consumption / Requirement Summary
11 Process Equipment List
2.3
Pump Equipment Datasheet
Separator Equipment Datasheet
2.4
Material Selection
General Piping Specifications
Line List
Piping Plan
Stress Analysis
Tie-in List
Bill of Material & Bill of Quantity
Minggu URAIAN PEKERJ AAN
Overall (General)
Kick Off Meeting
Engineering Package
Survey
Deriverables
Mechanical
Piping
2.5
1 SOW for Electrical
2 Electric Data Sheet
3 Power Layout
4 Lighting Layout
5 Grounding Layout
6 Electric Hazardous Area Classification
7 Bill of Material & Bill of Quantity
2.6
1 SOW for Instrumentation
2 Instrument Data Sheet
3 Cable & Wiring Layout
4 Bill of Material & Bill of Quantity
2.7
1 SOW for Civil& Structures
2 Site Preparation and Earth Work Specifications
3 Construction Methodologies Design Basis
4 Roads, Drainage and Fencing Layout
5 Structural Drawing
6 Foundation Drawing
7
Major Materials for Concrete, Structural Steel, Earthworks,
Painting & Fire Proofing, etc
8 Bill of Material & Bill of Quantity
3
III Tender Package
Kerangka Acuan Kerja Operability) analysis
Electrical
Instrument
Civil

You might also like