Ravi Singh responds to Susmit Paul and Amit Mallick regarding a report on a direct feeding system and moveable elbow. He provides feedback on three points from the report. For point 9, the 925mm dimension is acceptable. For point 10, altering the groove dimension is not acceptable and is rejected. For point 11, altering the position of lifting lugs is also not acceptable as all dimensions must match the drawing, so that point is also rejected.
Ravi Singh responds to Susmit Paul and Amit Mallick regarding a report on a direct feeding system and moveable elbow. He provides feedback on three points from the report. For point 9, the 925mm dimension is acceptable. For point 10, altering the groove dimension is not acceptable and is rejected. For point 11, altering the position of lifting lugs is also not acceptable as all dimensions must match the drawing, so that point is also rejected.
Ravi Singh responds to Susmit Paul and Amit Mallick regarding a report on a direct feeding system and moveable elbow. He provides feedback on three points from the report. For point 9, the 925mm dimension is acceptable. For point 10, altering the groove dimension is not acceptable and is rejected. For point 11, altering the position of lifting lugs is also not acceptable as all dimensions must match the drawing, so that point is also rejected.
To: Paul, Susmit IN CCU SL; Mallick, Amit IN CCU SL Cc: Sharma, Bhartendu IN CCU SL; Dawn, Amitava IN CCU SL Subject: RE: Report Direct feeding system & Moveable Elbow
Dear Susmit, Please find detail below: --Point 9: 925mm dimension is acceptable. --Point 10: Groove is not acceptable with alter dimension. Rejected. --Point 11: Position of lifting lugs is altered, which is not acceptable. All dimensions should be according to drawing. Rejected.
With best regards, Ravi Prakash Singh Siemens Ltd. RC-IN I MT OP M-EN Infinium Digi Space, CP 15, Sector V, Salt Lake City Kolkata 700091, India Tel: +91 33 30171389 Mobile: +91 9831038213 mailto:singh.ravi@siemens.com
URCC Group of Companies Mail - (L-2700)- Submission Design & DVE Verified Drawings(R0) of Working Pile for Viaduct Pier CP897 to CP902 in Between Bhawarsala Square & MR10 Road Station for Package in-03