This document lists 18 civil drawings and 1 hydro-mechanical drawing that were issued by the consulting firm M/S BHEC to M/S Skipper, Kano for the Tiga Hydroelectric Power Project in Kano State, Nigeria. The drawings cover a range of aspects of the project including the tail race channel, access roads, site facilities, power house plans and sections, excavation plans, and draft-tube gate arrangements. The document provides details on the drawing number, revision number, type (e.g. excavation, GA, concrete outline), and issue date for each drawing transmitted.
This document lists 18 civil drawings and 1 hydro-mechanical drawing that were issued by the consulting firm M/S BHEC to M/S Skipper, Kano for the Tiga Hydroelectric Power Project in Kano State, Nigeria. The drawings cover a range of aspects of the project including the tail race channel, access roads, site facilities, power house plans and sections, excavation plans, and draft-tube gate arrangements. The document provides details on the drawing number, revision number, type (e.g. excavation, GA, concrete outline), and issue date for each drawing transmitted.
This document lists 18 civil drawings and 1 hydro-mechanical drawing that were issued by the consulting firm M/S BHEC to M/S Skipper, Kano for the Tiga Hydroelectric Power Project in Kano State, Nigeria. The drawings cover a range of aspects of the project including the tail race channel, access roads, site facilities, power house plans and sections, excavation plans, and draft-tube gate arrangements. The document provides details on the drawing number, revision number, type (e.g. excavation, GA, concrete outline), and issue date for each drawing transmitted.
FROM TYPE DWG.No Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-04
1 TAIL RACE CHANNEL EXCAVATION PLAN & SECTIONS M/S BHEC Excavation Drawing C/001 TR.102/ 26.03.14 TR.109/ 08.05.14 TR.111/1 0.05.14 TR.123/2 4.06.14 2 ACCESS ROAD PLAN & TYPICAL CROSS SECTIONS M/S BHEC GA Drawing C/002 TR.102/2 6.03.14 TR.110/ 08.05.14 3 SITE OFFICES & FACILITIES: LAYOUT PLAN M/S BHEC GA Drawing C/003 TR.102/2 6.03.14 TR.104/ 27.03.14 4 GA DRAWING FOR EXISTING OFFICE AND FACILITIES TO BE RESSETTLED M/S BHEC GA Drawing C/004 TR.102/2 6.03.14 5 GENERAL LAYOUT PLAN M/S BHEC GA Drawing C/005 TR.100/1 3.03.14 TR.110/ 08.05.14 6 GENERAL ARRANGEMENT: L-SECTION THROUGH THE SCHEME (CBU & RBU) M/S BHEC GA Drawing C/006 TR.100/1 3.03.14 TR.110/ 08.05.14 7 GENERAL ARRANGEMENT: POWER HOUSE PLAN AT DIFFERENT LEVELS M/S BHEC GA Drawing C/007 TR.100/1 3.03.14 TR.116/ 24.05.14 8 GENERAL ARRANGEMENT: L- SECTION THROUGH UNITS (CBU & RBU) M/S BHEC GA Drawing C/008 TR.100/1 3.03.14 TR.110/ 08.05.14 9 POWER HOUSE & TAIL RACE POOL EXCAVATION PLAN M/S BHEC Excavation Drawing C/009 TR.100/1 3.03.14 TR.114/ 20.05.14 TR.118/2 7.05.14 Not Issued TR.119/0 4.06.14 TR.124/2 5.06.14 10 GENERAL ARRANGEMENT: POWER HOUSE CROSS SECTIONS 1-1 & 2-2, & CROSS SECTIONS OF TAIL RACE POOL - (CBU & RBU) M/S BHEC GA Drawing C/010 TR.100/1 3.03.14 TR.110/ 08.05.14 TR.118/2 7.05.14 ISSUED THROUGH AFC TRANSIMTTAL/ DATE CIVIL DRAWINGS: PROJECT: TIGA (1x2+ 1x 8 MW) HEP, KANO STATE, NIGERIA LIST OF DRAWINGS ISSUED TO M/S SKIPPER, KANO SR. NO. DESCRIPTION DETAILS OF DRAWING REMARKS FROM TYPE DWG.No Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-04 ISSUED THROUGH AFC TRANSIMTTAL/ DATE SR. NO. DESCRIPTION DETAILS OF DRAWING 11 POWER HOUSE EXCAVATION: SECTIONS M/S BHEC Excavation Drawing C/011 TR.102/2 6.03.14 TR.114/ 20.05.14 TR.118/2 7.05.14 Not Issued TR.119/0 4.06.14 TR.124/2 5.06.14 12 PENSTOCK AND MANIFOLD CHAMBER: PLAN, L- SECTION & CROSS SECTIONS (ALTERNATIVE-1) M/S BHEC GA Drawing C/012 TR.104/2 7.03.14 - - for Study only 13 TAIL RACE CHANNEL (CBU) EXCAVATION PLAN AND SECTIONS M/S BHEC Excavation Drawing C/015 NA TR.114/ 20.05.14 14 PENSTOCK TAKE OFF AND MANIFOLD CHAMBER GENERAL ARRANGEMENT M/S BHEC GA Drawing C/016 NA TR.110/ 08.05.14 15 EXCAVATION IN HARD ROCK- SLOPE STABILISATION MEASURES M/S BHEC Excavation Drawing C/020 TR.117/2 6.05.14 16 POWERHOUSE (RBU) PLAN AT DIFFERENT ELEVATIONS CONCRETE OUTLINE M/S BHEC Concrete Outline C/021 TR.123/2 4.06.14 17 POWERHOUSE (RBU) CONCRETE OUTLINE LONGITUDINAL SECTIONS M/S BHEC Concrete Outline C/022 TR.123/2 4.06.14 18 POWERHOUSE (RBU) CONCRETE OUTLINE CROSS SECTIONS M/S BHEC Concrete Outline C/023 TR.123/2 4.06.14 18 POWERHOUSEEXCAVATION CROSS SECTIONS M/S BHEC Excavation Drawing C/027 TR.124/2 5.06.14 1 Challawa HEP (25 MW) Draft-Tube Gate General Arrangement M/S BHEC M/S BHEC GA Drawing H&M/C/001 TR.104/ 27.03.14 H&M DRAWINGS:
Sub: BSP-7.0 MT Expansion-Structural Works For Balance Outdoor Piping and Cable Gallery For Augmentation of Make-Up and Drinking Water System - (Package-078B3)