Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

REMARKS

FROM TYPE DWG.No Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-04


1 TAIL RACE CHANNEL EXCAVATION PLAN & SECTIONS
M/S BHEC
Excavation
Drawing
C/001
TR.102/
26.03.14
TR.109/
08.05.14
TR.111/1
0.05.14
TR.123/2
4.06.14
2 ACCESS ROAD PLAN & TYPICAL CROSS SECTIONS
M/S BHEC GA Drawing C/002
TR.102/2
6.03.14
TR.110/
08.05.14
3 SITE OFFICES & FACILITIES: LAYOUT PLAN
M/S BHEC GA Drawing C/003
TR.102/2
6.03.14
TR.104/
27.03.14
4 GA DRAWING FOR EXISTING OFFICE AND FACILITIES
TO BE RESSETTLED
M/S BHEC GA Drawing C/004
TR.102/2
6.03.14
5 GENERAL LAYOUT PLAN
M/S BHEC GA Drawing C/005
TR.100/1
3.03.14
TR.110/
08.05.14
6 GENERAL ARRANGEMENT: L-SECTION THROUGH THE
SCHEME (CBU & RBU) M/S BHEC GA Drawing C/006
TR.100/1
3.03.14
TR.110/
08.05.14
7 GENERAL ARRANGEMENT: POWER HOUSE PLAN AT
DIFFERENT LEVELS M/S BHEC GA Drawing C/007
TR.100/1
3.03.14
TR.116/
24.05.14
8 GENERAL ARRANGEMENT: L- SECTION THROUGH
UNITS (CBU & RBU) M/S BHEC GA Drawing C/008
TR.100/1
3.03.14
TR.110/
08.05.14
9 POWER HOUSE & TAIL RACE POOL EXCAVATION PLAN
M/S BHEC
Excavation
Drawing
C/009
TR.100/1
3.03.14
TR.114/
20.05.14
TR.118/2
7.05.14
Not
Issued
TR.119/0
4.06.14
TR.124/2
5.06.14
10 GENERAL ARRANGEMENT: POWER HOUSE CROSS
SECTIONS 1-1 & 2-2, & CROSS SECTIONS OF TAIL
RACE POOL - (CBU & RBU)
M/S BHEC GA Drawing C/010
TR.100/1
3.03.14
TR.110/
08.05.14
TR.118/2
7.05.14
ISSUED THROUGH AFC TRANSIMTTAL/ DATE
CIVIL DRAWINGS:
PROJECT: TIGA (1x2+ 1x 8 MW) HEP, KANO STATE, NIGERIA
LIST OF DRAWINGS ISSUED TO M/S SKIPPER, KANO
SR.
NO.
DESCRIPTION
DETAILS OF DRAWING
REMARKS
FROM TYPE DWG.No Rev-00 Rev-01 Rev-02 Rev-03 Rev-04 Rev-04
ISSUED THROUGH AFC TRANSIMTTAL/ DATE SR.
NO.
DESCRIPTION
DETAILS OF DRAWING
11 POWER HOUSE EXCAVATION: SECTIONS
M/S BHEC
Excavation
Drawing
C/011
TR.102/2
6.03.14
TR.114/
20.05.14
TR.118/2
7.05.14
Not
Issued
TR.119/0
4.06.14
TR.124/2
5.06.14
12 PENSTOCK AND MANIFOLD CHAMBER: PLAN, L-
SECTION & CROSS SECTIONS (ALTERNATIVE-1)
M/S BHEC GA Drawing C/012
TR.104/2
7.03.14
- - for Study only
13 TAIL RACE CHANNEL (CBU) EXCAVATION PLAN AND
SECTIONS
M/S BHEC
Excavation
Drawing
C/015 NA
TR.114/
20.05.14
14 PENSTOCK TAKE OFF AND MANIFOLD CHAMBER
GENERAL ARRANGEMENT M/S BHEC GA Drawing C/016 NA
TR.110/
08.05.14
15 EXCAVATION IN HARD ROCK- SLOPE STABILISATION
MEASURES
M/S BHEC
Excavation
Drawing
C/020
TR.117/2
6.05.14
16 POWERHOUSE (RBU) PLAN AT DIFFERENT
ELEVATIONS CONCRETE OUTLINE
M/S BHEC
Concrete
Outline
C/021
TR.123/2
4.06.14
17 POWERHOUSE (RBU) CONCRETE OUTLINE
LONGITUDINAL SECTIONS
M/S BHEC
Concrete
Outline
C/022
TR.123/2
4.06.14
18 POWERHOUSE (RBU) CONCRETE OUTLINE CROSS
SECTIONS
M/S BHEC
Concrete
Outline
C/023
TR.123/2
4.06.14
18 POWERHOUSEEXCAVATION CROSS SECTIONS
M/S BHEC
Excavation
Drawing
C/027
TR.124/2
5.06.14
1 Challawa HEP (25 MW) Draft-Tube Gate General
Arrangement
M/S BHEC M/S BHEC GA Drawing H&M/C/001
TR.104/
27.03.14
H&M DRAWINGS: