This document summarizes the review and approval of drawings and documents for a 388 MW combined cycle power plant project. The transmittal is marked as option A, indicating the drawings have been approved as submitted and the contractor can proceed with fabrication and construction. While approved, the contractor is still responsible for ensuring the work is correct and meets all contract requirements.
This document summarizes the review and approval of drawings and documents for a 388 MW combined cycle power plant project. The transmittal is marked as option A, indicating the drawings have been approved as submitted and the contractor can proceed with fabrication and construction. While approved, the contractor is still responsible for ensuring the work is correct and meets all contract requirements.
This document summarizes the review and approval of drawings and documents for a 388 MW combined cycle power plant project. The transmittal is marked as option A, indicating the drawings have been approved as submitted and the contractor can proceed with fabrication and construction. While approved, the contractor is still responsible for ensuring the work is correct and meets all contract requirements.
This document summarizes the review and approval of drawings and documents for a 388 MW combined cycle power plant project. The transmittal is marked as option A, indicating the drawings have been approved as submitted and the contractor can proceed with fabrication and construction. While approved, the contractor is still responsible for ensuring the work is correct and meets all contract requirements.
PIONEER GAS POWER LIMITED 388 MWCOMBINEDCYCLE POWER PLANT
PIONEER GAS POWER LTD 388 MW CCPP
PGPL Tranmittal no : APSIPL/05/transmittal/158
A Drawing/Document approved as submitted: Proceed with fabrication/ construction. B Drawing/Document approved subject to comments noted: proceed with fabrication/ construction considering our comments.
C Our comments are noted on this marked up print. D Our comments are noted in the memo attached to this transmittal. E Correct original of this drawing/document to reflect our comments and resubmit for approval. F Correct original of this drawing/document to reflect our comments and resubmit for records. G Drawing/Document of this category are for information only and not for approval. Information furnished on the drawing/document is noted.
H Drawing/Document reviewed against our previous comments and other revisions highlighted and identified by the Contractor.
I Drawing/Document returned without review.
Date : 18/09/2012 This document has been reviewed as noted with regard to general conformity with the contract specifications and requirements. The vendor/contractor is responsible for correctness of design, calculation and details. Approval of this document does not relieve the Vendor/Contractor of his responsibility in carrying out the work correctly and fulfilling the complete requirements of the contract nor does it limit the Purchasers rights under the Contract.