Project: Redelivering the wet GAS from NamConSon to DINHCO GPP

Item: Document list


Rev: A Date: 2-Jul-14
Task Date
1.Process calculation
Process sizing Carbis filtration 16-7-2014
2. Mechanical calculation
2.1 Pipe sizing Alpha-ECC 8/7/2014
2.2 ME Calculation Filter F22008A/B Carbis filtration 24-7-2014
lifting calculation for filter vessel
3. E&I
Wiring diagram Alpha-ECC 16-7-2014
Cable schedule. 16-7-2014
Instrument Hook-up drawing 30-7-2014
4. Structure
Structure calculation Alpha-ECC 16-7-2014
Lifting calculation Alpha-ECC 16-7-2014
C.O.G Alpha-ECC 16-7-2014
5. Drawing
5.1 G.A drawing for filter SKID Alpha-ECC 16-7-2014
5.2 ISO metric drawing Alpha-ECC 16-7-2014
5.3 Structure drawing Alpha-ECC 30-7-2014
5.4 GA drawing for filter F22008A Carbis filtration 16-7-2014
GA drawing for filter F22008B Carbis filtration 16-7-2014
Fabricationdrawing for filter F22008A Carbis filtration 30-7-2014
Fabricationdrawing for filter F22008B Carbis filtration 30-7-2014