SUB-CON RATES:

As of May 8, 2014
SUNNYSIDE(Townhouse)
MASONRY
CHB LAYING:
-6" CHB = 95/sq.m.
-4" CHB = 80/sq.m.
PLASTERING:
-Surface area = 95/sq.m.
-Linear meter = 60/li.m.
CONCRETE TOPPING:
-Surface area = 50/sq.m.
PEBBLE WASHOUT:
-Surface area = 100/sq.m.
-Linear meter = ___/li.m.
TILEWORKS:
-Surface area = 100/sq.m.
DECORATIVE STONE:
-Surface area = 120/sq.m.
CARPENTRY
CEILING: (Light Aluminum Framing & Fiber Cement Board)
-Framing = 45/sq.m.
-Board = 85/sq.m.
DRY WALL PARTITION:(Light Aluminum Framing & Fiber Cement Board)
-Framing = 45/sq.m.
-Board = 85/sq.m.
CORNICE:
-Victorian Cornice = 18/li.m.
-Quarter Round = 10/li.m.
BASEBOARD:
-4" Victorian Baseboard = 15/li.m.
DOOR JAMB:
-2" x 6" Door Jamb = 150/set
-2" x 4" Door Jamb = 150/set
-PVC Door Jamb = 120/set
DOORS:
-Panel Door = 200/set
-Flush Door = 140/set
-PVC Door = 90/set
KITCHEN HANGING CABINET:
-Fabrication and Installation = 800/set
-Installation of Clear Glass =100/set
KITCHEN COUNTER:
-Installation of Covers and Hinges = 1000/set
BEDROOM CLOSETS:
-1.2m for Master's Bedroom = 2200/set
-0.9m for Non-Master's Bedroom = 2000/set
STAIRS:
-Fabrication and Installation = 1500/set
MUZON(School Building)
MASONRY
CHB LAYING:
-6" CHB = 95/sq.m.
-4" CHB = 80/sq.m.
PLASTERING:
-Surface area = 95/sq.m.
-Linear meter = 60/li.m.
CONCRETE TOPPING:
-Surface area = 50/sq.m.
TILEWORKS:
-Surface area = 100/sq.m.
CARPENTRY
CEILING: (1/4" Ord. Plywood on 2"x2" Good Lumber)
-Framing = 45/sq.m.
-Board = 85/sq.m.
CORNICE:
-Quarter Round = 10/li.m.
DOOR JAMB:
-2" x 6" Door Jamb = 150/set
-2" x 4" Door Jamb = 150/set
DOORS:
-Panel Door = 200/set
-Flush Door = 180/set
-Swing Door = 75/set
ARCHITECTURAL
WINDOW GLASS:
JALOUSIE:
STEEL CASEMENT