SUMMARY LIST OF SETTLEMENT AND SLIDING MONITOR DEVICE

NEW THU THIEM ROAD

Embankment Status Surcharge Duration

Design Current
No. STA Side Propose Embankment Remarks
Surchage Embankment
Height (elev.) Thickness Day Month
Level (elev.) Level (elev.)
(m) (m)
(m) (m)

1 14+870 CL 1.957 3.457 0.00 3.96 0 0.0 Finished Sur.

2 14+900 CL 2.433 3.933 0.00 4.45 0 0.0 ditto

3 14+930 LHS 2.539 4.039 0.00 4.56 0 0.0 ditto


RHS 2.539 4.039 0.00 4.36 0 0.0 ditto
4 15+000 LHS 2.475 3.975 3.87 4.69 5191 173.0 Finished Sur.
RHS 2.475 3.975 3.85 5.04 5191 173.0 ditto
5 15+100 LHS 2.189 3.689 3.24 4.22 5182 172.7 ditto
RHS 2.189 3.689 3.24 3.92 5182 172.7 ditto
6 15+200 LHS 2.479 3.979 3.47 4.68 5069 169.0 ditto
RHS 2.479 3.979 3.68 3.98 5069 169.0 ditto
7 15+275 LHS 3.589 5.089 4.28 5.34 5052 168.4 ditto
RHS 3.589 5.089 4.39 5.09 5046 168.2 ditto
8 15+472 LHS 4.993 6.493 5.91 6.49 4974 165.8 ditto
RHS 4.993 6.493 5.90 6.49 4958 165.3 ditto
9 15+500 LHS 4.485 5.985 5.44 6.19 4974 165.8 ditto
RHS 4.485 5.985 5.55 6.09 4958 165.3 ditto
10 15+600 LHS 2.780 4.280 3.98 4.38 4976 165.9 ditto
RHS 2.780 4.280 3.99 4.48 4998 166.6 ditto
11 15+700 LHS 2.824 4.324 3.91 4.32 4954 165.1 ditto
RHS 2.824 4.324 3.89 4.32 4999 166.6 ditto
12 15+800 LHS 3.748 5.248 4.61 5.70 4950 165.0 ditto
RHS 3.748 5.248 4.75 5.60 4963 165.4 ditto
13 15+900 LHS 4.672 6.172 5.71 6.62 4956 165.2 ditto
RHS 4.672 6.172 5.58 6.72 4945 164.8 ditto
14 15+940 LHS 5.041 6.541 6.17 7.29 4970 165.7 ditto
RHS 5.041 6.541 6.07 6.74 4946 164.9 ditto
15 16+060 LHS 5.181 6.681 1.85 1.85 0.00 0.00 Shift to Sta16+075
RHS 6.181 7.681 2.85 1.85 0.00 0.00 Finished Sur.
16 16+075 LHS 4.881 6.381 6.30 6.85 4997 166.6 Add. Surcharge
RHS 4.881 6.381 6.21 7.55 4995 166.5 ditto
17 16+100 LHS 4.484 5.984 6.02 6.48 4999 166.6 ditto
RHS 4.484 5.984 5.81 5.48 4994 166.5 ditto
18 16+200 LHS 3.203 4.703 5.04 5.15 5044 168.1 ditto
RHS 3.203 4.703 5.11 5.00 5042 168.1 ditto
19 16+250 LHS 3.383 4.883 5.27 5.33 5293 176.4 Trial PVD 1

20 16+300 LHS 3.503 5.003 4.80 5.75 5111 170.4 Trial PVD 1
RHS 3.503 5.003 5.01 4.75 5040 168.0 Add. Surcharge
21 16+400 LHS 3.803 5.303 5.35 5.60 5048 168.3 ditto
RHS 3.803 5.303 5.42 4.80 5035 167.8 ditto
22 16+500 LHS 4.044 5.544 5.28 5.84 5021 167.4 Finished Sur.
RHS 4.044 5.544 5.41 5.54 5020 167.3 ditto
23 16+600 LHS 3.791 5.291 5.20 5.20 5038 167.9 ditto
RHS 3.791 5.291 5.13 5.20 5032 167.7 ditto
24 16+700 LHS 3.491 4.991 4.71 5.44 4997 166.6 ditto
RHS 3.491 4.991 4.93 4.99 5000 166.7 ditto
25 16+780 LHS 3.251 4.751 4.46 5.35 4999 166.6 ditto
RHS 3.251 4.751 4.64 4.75 4940 164.7 ditto
26 16+900 LHS 3.035 4.535 4.33 5.04 5010 167.0 ditto

Page1/3
SUMMARY LIST OF SETTLEMENT AND SLIDING MONITOR DEVICE
NEW THU THIEM ROAD

Embankment Status Surcharge Duration

Design Current
No. STA Side Propose Embankment Remarks
Surchage Embankment
Height (elev.) Thickness Day Month
Level (elev.) Level (elev.)
(m) (m)
(m) (m)

RHS 3.035 4.535 4.37 4.89 4976 165.9 ditto


27 16+960 LHS 4.131 5.631 0.00 2.70 5060 168.7 ditto
RHS 4.131 5.631 0.00 2.50 5059 168.6 ditto
28 17+260 LHS 5.332 6.832 0.00 4.00 5058 168.6 ditto
RHS 5.332 6.832 0.00 2.80 5057 168.6 ditto
29 17+320 LHS 3.858 5.358 5.13 5.33 4991 166.4 ditto
RHS 3.858 5.358 5.34 5.08 4979 166.0 ditto
30 17+400 LHS 2.761 4.261 4.07 4.44 5024 167.5 ditto
RHS 2.761 4.261 4.25 4.24 4914 163.8 ditto
31 17+500 LHS 2.787 4.287 3.99 4.06 5024 167.5 ditto
RHS 2.787 4.287 4.28 4.46 4929 164.3 ditto
32 17+600 LHS 4.130 5.630 5.32 5.85 4952 165.1 ditto
RHS 4.130 5.630 5.53 6.20 4955 165.2 ditto
33 17+640 LHS 4.717 6.217 1.60 1.60 0 0.0 ditto
RHS 4.717 6.217 1.60 1.60 0 0.0 ditto
33 17+740 LHS 4.717 6.217 3.69 3.89 0.00 0.00 Sur 4th
RHS 4.717 6.217 2.79 2.94 0.00 0.00 Sur 1st
34 17+800 LHS 3.630 5.130 4.66 4.75 5082
> 14 - Removed Surcharge
Finished Sur.
RHS 3.630 5.130 4.68 4.80 5093
> 14 - Removed Surcharge ditto
34 17+855 LHS 2.765 4.265 4.11 3.99 4943
> 14 - Removed Surcharge ditto
RHS 2.765 4.265 4.16 3.99 4945
> 14 - Removed Surcharge ditto
35 17+900 LHS 2.780 4.280 3.92 4.05 5075
> 14 - Removed Surcharge ditto
RHS 2.780 4.280 4.01 4.05 5142
> 14 - Removed Surcharge ditto
36 18+000 LHS 3.080 4.580 4.33 4.30 5105
> 14 - Removed Surcharge ditto
RHS 3.080 4.580 4.47 4.20 5021
> 14 - Removed Surcharge ditto
37 18+100 LHS 3.327 4.827 4.54 4.60 5156
> 14 - Removed Surcharge ditto
RHS 3.327 4.827 4.72 4.80 5053
> 14 - Removed Surcharge ditto
38 18+200 LHS 3.080 4.580 4.25 4.20 5155
> 14 - Removed Surcharge ditto
RHS 3.080 4.580 4.52 4.15 5113
> 14 - Removed Surcharge ditto
39 18+300 LHS 2.780 4.280 3.90 3.95 5152
> 14 - Removed Surcharge ditto
RHS 2.780 4.280 4.01 3.95 5113
> 14 - Removed Surcharge ditto
40 18+400 LHS 2.668 4.168 3.83 3.94 5151
> 14 - Removed Surcharge ditto
RHS 2.668 4.168 3.97 4.34 5113
> 14 - Removed Surcharge ditto
41 18+475 LHS 3.323 4.823 4.44 5.33 5151
> 14 - Removed Surcharge ditto
RHS 3.323 4.823 4.71 5.33 4955
> 14 - Removed Surcharge ditto
42 18+520 LHS 3.360 4.860 4.39 5.53 5165
> 14 - Removed Surcharge ditto
RHS 3.360 4.860 4.60 5.73 5171
> 14 - Removed Surcharge ditto
43 18+620 LHS 2.598 4.098 3.77 3.67 5177
> 14 - Removed Surcharge ditto
RHS 2.598 4.098 3.94 3.72 5178
> 14 - Removed Surcharge ditto
44 18+700 LHS 2.660 4.160 3.99 3.55 5177
> 14 - Removed Surcharge ditto
RHS 2.660 4.160 4.12 3.65 5179
> 14 - Removed Surcharge ditto
45 18+800 LHS 3.080 4.580 3.80 3.00 4979 166.0 Finished Sur.
RHS 3.080 4.580 3.80 3.00 4978 165.9 ditto
46 18+900 LHS 3.293 4.793 4.00 3.20 4977 165.9 ditto
RHS 3.293 4.793 4.00 3.20 4976 165.9 ditto
47 18+980 LHS 3.080 4.580 4.00 3.40 4975 165.8 ditto
RHS 3.080 4.580 4.20 3.80 4974 165.8 ditto
48 19+100 LHS 2.960 4.460 296.00 -2.00 5466 182.2 Finished Sur.
RHS 2.960 4.460 389.00 -2.00 5466 182.2 ditto
49 19+200 LHS 3.260 4.760 389.00 -3.00 5460 182.0 ditto
RHS 3.260 4.760 311.00 -1.00 5474 182.5 ditto

Page2/3
SUMMARY LIST OF SETTLEMENT AND SLIDING MONITOR DEVICE
NEW THU THIEM ROAD

Embankment Status Surcharge Duration

Design Current
No. STA Side Propose Embankment Remarks
Surchage Embankment
Height (elev.) Thickness Day Month
Level (elev.) Level (elev.)
(m) (m)
(m) (m)

50 19+300 LHS 3.170 4.670 352.00 -3.00 5460 182.0 ditto


RHS 3.170 4.670 355.00 -1.00 5474 182.5 ditto
51 19+400 LHS 2.928 4.428 277.00 -1.00 5456 181.9 ditto
RHS 2.928 4.428 286.00 -3.00 5457 181.9 ditto
52 19+520 LHS 3.328 4.828 371.00 -1.00 5455 181.8 ditto
RHS 3.328 4.828 370.00 -1.00 5462 182.1 ditto
53 19+600 LHS 2.654 4.154 359.00 0.00 5456 181.9 ditto
RHS 2.654 4.154 413.00 -1.00 5459 182.0 ditto
54 19+695 LHS 2.840 4.340 351.00 0.00 5456 181.9 ditto
RHS 2.840 4.340 422.00 -1.00 5457 181.9 ditto
55 19+800 LHS 3.090 4.590 3.750 2.85 5466 182.2 Finished Sur.
RHS 3.090 4.590 3.480 2.38 5403 180.1 ditto
56 19+900 LHS 3.030 4.530 3.600 2.65 5473 182.4 ditto
RHS 3.030 4.530 3.560 2.46 5776 192.5 ditto
57 20+000 LHS 2.730 4.230 3.660 3.06 5466 182.2 ditto
RHS 2.730 4.230 3.360 2.51 5411 180.4 ditto
58 20+100 LHS 2.764 4.264 3.980 3.61 5062 168.7 Removed Sur.
RHS 2.764 4.264 4.150 3.96 5048 168.3 Finished Sur.
59 20+120 LHS 2.955 4.455 3.989 3.80 5062 168.7 ditto
RHS 2.955 4.455 4.311 4.15 5048 168.3 ditto
60 20+200 LHS 3.523 5.023 4.740 4.27 5062 168.7 ditto
RHS 3.523 5.023 4.834 5.17 5048 168.3 ditto
61 20+280 LHS 3.320 4.820 4.741 4.17 5114 170.5 ditto
62 20+300 LHS 3.260 4.760 4.845 3.61 5114 170.5 Removed Sur.
RHS 3.260 4.760 5.221 3.71 5048 168.3 Finished Sur.
63 20+400 LHS 2.960 4.460 3.750 2.95 5174 172.5 Finished Sur.
RHS 2.960 4.460 3.390 2.59 5173 172.4 ditto
64 20+500 LHS 2.660 4.160 3.630 3.08 5172 172.4 ditto
RHS 2.660 4.160 3.350 2.35 5171 172.4 ditto
65 20+600 LHS 2.360 3.860 3.620 3.42 5170 172.3 ditto
RHS 2.360 3.860 3.460 2.86 5169 172.3 ditto
66 20+700 LHS 2.230 3.730 3.693 3.69 5168 172.3 ditto
RHS 2.230 3.730 3.850 4.00 5167 172.2 ditto
67 20+800 LHS 2.355 3.855 3.510 3.21 5166 172.2 ditto
RHS 2.355 3.855 4.300 4.60 5165 172.2 ditto

Page3/3