Summary List of Settlement and Sliding Monitor Device New Thu Thiem Road
Summary List of Settlement and Sliding Monitor Device New Thu Thiem Road
Summary List of Settlement and Sliding Monitor Device New Thu Thiem Road
Design Current
No. STA Side Propose Embankment Remarks
Surchage Embankment
Height (elev.) Thickness Day Month
Level (elev.) Level (elev.)
(m) (m)
(m) (m)
20 16+300 LHS 3.503 5.003 4.80 5.75 5111 170.4 Trial PVD 1
RHS 3.503 5.003 5.01 4.75 5040 168.0 Add. Surcharge
21 16+400 LHS 3.803 5.303 5.35 5.60 5048 168.3 ditto
RHS 3.803 5.303 5.42 4.80 5035 167.8 ditto
22 16+500 LHS 4.044 5.544 5.28 5.84 5021 167.4 Finished Sur.
RHS 4.044 5.544 5.41 5.54 5020 167.3 ditto
23 16+600 LHS 3.791 5.291 5.20 5.20 5038 167.9 ditto
RHS 3.791 5.291 5.13 5.20 5032 167.7 ditto
24 16+700 LHS 3.491 4.991 4.71 5.44 4997 166.6 ditto
RHS 3.491 4.991 4.93 4.99 5000 166.7 ditto
25 16+780 LHS 3.251 4.751 4.46 5.35 4999 166.6 ditto
RHS 3.251 4.751 4.64 4.75 4940 164.7 ditto
26 16+900 LHS 3.035 4.535 4.33 5.04 5010 167.0 ditto
Page1/3
SUMMARY LIST OF SETTLEMENT AND SLIDING MONITOR DEVICE
NEW THU THIEM ROAD
Design Current
No. STA Side Propose Embankment Remarks
Surchage Embankment
Height (elev.) Thickness Day Month
Level (elev.) Level (elev.)
(m) (m)
(m) (m)
Page2/3
SUMMARY LIST OF SETTLEMENT AND SLIDING MONITOR DEVICE
NEW THU THIEM ROAD
Design Current
No. STA Side Propose Embankment Remarks
Surchage Embankment
Height (elev.) Thickness Day Month
Level (elev.) Level (elev.)
(m) (m)
(m) (m)
Page3/3