Unit wt of: conc=25kn/m3, brick=19kn/m3

3
3
3
Steel=7850kg/ m , water=1000lit/m , cem=1440kg/m
3
1Gallon=4.81lits, 1Link=8=200mm, 1m =35.31 cft
2
2
1Hect=2.471Acr(10000m ),1Acr=4046.82 m (100cent)
Dev.Len-com-38D, Tension-47D&60D, D-Dia of bar
1cent=435.60sft, 1m=3.2808 Feet, 1 m2=10.764sft
1Feet = 0.3048m, 1 KN = 100kg, 1KN= 1000N
1Tone = 1000 kg = 10,000N = 10KN, 1Kg = 9.81N(10N)
Sloped Footing volume = h/3x{(a1+a2)+(a1xa2)}
M5-2.54Bg/m3 , m7.5-3.18Bg/m3 , m10-4.32Bg/m3
M20-8.64Bg/m3, M25-12.96Bg/m3, M40-500+100kg/m3
1m3conc = 0.9 m3 jelly+0.55m3 sand+0.225m3 cement
Br-wt 3.17-3.80kg-water ob-12to15%,com 36kN/cm^2
230 wall / m3 = 460 Bricks + 20cft sand + 66kg cemt
115 wall / m2 = 50 Brick + 8cft sand + 8.50kg cemt
3
SSM 1:7 / m = size95 + soling8cft + sand20cft + 60.5kg

Current - 1000watts = 1unit, 25wx40hr = 1unit


Sunshade-65mm- 0.56bag/m2 , 90mm-78 bag/ m2
Tiles, Kotta,Marble - 0.33 bag/ m2
Cel & Rcc Plast 1:3 - 0.13 ,wall 1:5 -0.09bag/m2
Smooplast-1:3-0.18,8 Brick on edge-0.08/ Rmt
Pavemt - 75tk 0.49/m2, open tera 1:4 - 0.15bag/m2
Eff.cover = FOT-50, column-40, slab-20, Beam-25
NitoFloor Hardner-3kg/m2,Fibre Mesh-0.9kg/m3
Reinforment steel For Concrete item-kg/m3
Column-125,Footing-75,Beam-120,slabs-65,
Walls-80.Min plot Area req for Approval-95 m2
Fabrication steels (Truss+purlin)
20-30m span 1m2 = 25kg ,40m&Above 1m2 = 33kg
UG Sumps-12kl(2x3x2m) , 24kl(2.5x4x2.5m)
Column Load for resi-2.0T/m2 per floor
2
2
2
2
FSI-Shop17 m /200 m ,Rasi 17 m /250 m ,w-6m

Maniadi Sastra : 6, 8, 10, 11, 16, 17, 20, 21, 22, 26, 27, 28, 29, 30, 31, 32, 33, 35, 36*, 37, 39, 41, 42, 45, 52, 56*, 60
63, 64, 66, 68, 70, 71, 72, 73, 77, 79, 80, 84, 85, 87, 88, 89, 90, 91, 92, 95, 97, 98, 99, 100, 101, 102, 106, 108, 109
110, 111, 112, 113, 115, 116, 117, 119 (* BEST )

You might also like