Description AMOUNT
Labor- Fitting the new bath, Plastering walls where required and preparation of all
surfaces
for the installation of the new suite, Tiling wall up the ceiling and the floor (laying 1,250.00
underlay if
needed), Fitting all needed accessories, Painting and decorating the ceiling and
Cleaning and leaving the bathroom in a usable condition.
TOTAL OF THE ABOVE £1,500.00