This document provides a checklist for primary cable measurement tests conducted at substation AFL-07. It lists the type of cable tested, test equipment used including manufacturer and serial numbers, weather conditions, circuit details like section and length. It also records continuity and insulation resistance test results for the cable identified as QLE-C1 that is part of the Runway Edge Light & Windcone circuit. The inspection results are pending sign off by representatives of Safegate, Galfar and Hill International.
This document provides a checklist for primary cable measurement tests conducted at substation AFL-07. It lists the type of cable tested, test equipment used including manufacturer and serial numbers, weather conditions, circuit details like section and length. It also records continuity and insulation resistance test results for the cable identified as QLE-C1 that is part of the Runway Edge Light & Windcone circuit. The inspection results are pending sign off by representatives of Safegate, Galfar and Hill International.
This document provides a checklist for primary cable measurement tests conducted at substation AFL-07. It lists the type of cable tested, test equipment used including manufacturer and serial numbers, weather conditions, circuit details like section and length. It also records continuity and insulation resistance test results for the cable identified as QLE-C1 that is part of the Runway Edge Light & Windcone circuit. The inspection results are pending sign off by representatives of Safegate, Galfar and Hill International.
Insulation Resistance [MOhm] Test Voltage: 5000V for 60 sec [Megger] Line to Earth Line to Earth
Inspection Passed:
Test carried out by: Safegate Name, Date, Signature Test witnessed / accepted by: Galfar Name, Date, Signature Test witnessed / accepted by: Hill International Name, Date, Signature 1 of 1