Professional Documents
Culture Documents
General Arrangement and Sectional Drawing of Bottom Ash Overflow Transfer Pump
General Arrangement and Sectional Drawing of Bottom Ash Overflow Transfer Pump
PLL PLL-GVK-PEM-144-E-055 0
TSL 559-40/255-01 0
0 M.D.D 28.06.12
REV. NO. BY DATE
PROJ ECT
DESCRIPTION
Initial Submission
GOINDWAL SAHIB PUNJ AB
TECPRO SYSTEMS LIMITED
(ASHTECH DIVISION)
2x270 MW, COAL BASED TPP
General Arrangement and Sectional Drawing of Bottom Ash Overflow
Transfer Pump
Package: ASH HANDLING SYSTEM
Discipline: MECHANICAL
OWNER
OWNER'S
CONSULTANT
BOP
CONSULTANT
(ASHTECH DIVISION)
BANGALORE.
TECPRO SYSTEMS LIMITED
95 INSTITUTIONAL AREA ,SECTOR 32.
GURGAON 122-001.
FICHTNER Consulting Engineers (India) Private Limited
CHENNAI.
PUNJ LLOYD LIMITED,
GVK POWER (GOINDWAL SAHIB) LIMITED
CONSULTING ENGINEERS LIMITED
HAA
10-07-12
TCE.5370A-ME-CO-570-02-94
BOTTOM ASH OVERFLOW PUMP
04
HAA
10-07-12
TCE.5370A-ME-CO-570-02-94