Schedule 1.3 - 1 PLTU SIMEULUE (2 x 7 MW) SCHEDULE 1.3 - TRAINING
The Bidder shall enter in this schedule, Bid Prices for training as specified in Volume II, Part I, Section 1 K shall be attached herewith on a separate sheet.
No. DESCRIPTION TOTAL COST LOCAL FOREIGN
1.
2.
3.
4.
Bidder's fee for Owner's operation and maintenance personnel training, excluding trainees travel, living and accommodation expenses as specified in volume II part 1, section 1K Personnel Training.
Site training of the Owner's operation and maintenance personnel.
Training shall be continuous from commencement of assembly of Unit 1 through 12 months after the date of full commercial operation of the Unit 1.
Provision of one full time instructors at site from commencement of assembly of Unit 1 through 12 months after the date of full commercial operation of Unit 1.
Provisional lump sum for trainees air-fares, hotel accommodation and other living expenses.
Rp. 42.000.000
Rp. 365.000.000
Rp. 645.000.000
Rp.130.5000.000
TOTAL FOR TRAINING CARRIED TO SCHEDULE 1.1 Rp. 1.182.500.000
5.
6.
Adjustment rate for training of Owner's staff at manufacturers per man month.
Adjustment rate for provision of instructors at Site per man month.
???
???
Note: Not withstanding the number and periods specified in Volume II, Part I, Section 1 K the prices for items 1 and 2 shall be based on 3 (three) of Owners trainees being located at the manufacturer's works each for a period of 2 (two) weeks and on 10 (ten) trainees receiving Site training. Items 1 and 5 shall include for the cost of insuring trainees while undergoing works training against - Accidental death to a value of US$ 190,000.00 and 100% of medical, dental and hospitalization expenses.