VOLUME III

Schedule 1 Base Prices


Schedule 1.3 Training


Schedule 1.3 - 1 PLTU SIMEULUE (2 x 7 MW)
SCHEDULE 1.3 - TRAINING


The Bidder shall enter in this schedule, Bid Prices for training as specified in Volume II,
Part I, Section 1 K shall be attached herewith on a separate sheet.

No. DESCRIPTION
TOTAL COST
LOCAL FOREIGN

1.




2.






3.




4.

Bidder's fee for Owner's operation and maintenance
personnel training, excluding trainees travel, living
and accommodation expenses as specified in
volume II part 1, section 1K Personnel Training.

Site training of the Owner's operation and
maintenance personnel.

Training shall be continuous from commencement of
assembly of Unit 1 through 12 months after the date
of full commercial operation of the Unit 1.

Provision of one full time instructors at site from
commencement of assembly of Unit 1 through 12
months after the date of full commercial operation of
Unit 1.

Provisional lump sum for trainees air-fares, hotel
accommodation and other living expenses.


Rp. 42.000.000




Rp. 365.000.000






Rp. 645.000.000




Rp.130.5000.000


TOTAL FOR TRAINING CARRIED TO SCHEDULE
1.1
Rp. 1.182.500.000

5.


6.

Adjustment rate for training of Owner's staff at
manufacturers per man month.

Adjustment rate for provision of instructors at Site
per man month.

???


???




Note: Not withstanding the number and periods specified in Volume II, Part I, Section 1 K
the prices for items 1 and 2 shall be based on 3 (three) of Owners trainees being
located at the manufacturer's works each for a period of 2 (two) weeks and on 10
(ten) trainees receiving Site training. Items 1 and 5 shall include for the cost of
insuring trainees while undergoing works training against - Accidental death to a
value of US$ 190,000.00 and 100% of medical, dental and hospitalization
expenses.