ITEM NO.

1
2
3
4
5
6
7
8
9

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

DESCRIPTION
CONTROL ROOM
SECURITY ROOM
CONCRETE PLATFORM (6.1X3.05)
DRAWING SYSTEM
TUBE WELL
3.75 m ROAD
3 m ROAD
1.20 m PATH WAY
CABLE TRENCH
900X600
600X600
SUMP PIT
RCC BOX CULVERT
EQUIPMENT FOUNDATION
C.T (2+2)=4 SET
P.T
CIRCUIT BREAKER
CABLE TERMINATION
VHF MAST
TRANSFORMER FOUNDATION
6.3/10 MVA
STATION SERVICE RTRANSFORMER
SOIL INVESTIGATION
DRILLING 5 NO. BORE HOLE
1 BORE HOLE
SURVEY WORK
LAND DEVELOPMENT
ANTITERMITE
GRAVEL SPREADING
BOUNDARY WALL(1.5 m RETAINNING WALL)
FENCING AROUND SWITCH YARD
TOTAL

QTY
1
1
1
1
1
40
20
80

UNIT
L.S
L.S
L.S
L.S
L.S
metre
metre
metre

40
120
1
1

metre
metre
L.S

ESTIMATION OF SUBSTATION DATED 23/05/2014


RATE
AMT
6,500,000.00
6500000.00
230,000.00
230000.00
56,000.00
56000.00
250,000.00
250000.00
200,000.00
200000.00
8,875.00
355000.00
6,200.00
124000.00
1,500.00
120000.00
7,200.00
5,400.00
70,000.00
300,000.00

288000.00
648000.00
70000.00
300000.00

4
1
2
2
1

25,000.00
25,000.00
37,000.00
23,000.00
190,000.00

100000.00
25000.00
74000.00
46000.00
190000.00

2
1

93,000.00
37,000.00

186000.00
37000.00

1
1
1
65.99
1
1400
293
130

25,000.00
25,000.00
40,000.00
34,388.23
50,000.00
700.00
12,360.00
4,100.00

25000.00
25000.00
40000.00
2269279.30
50000.00
980000.00
3621480.00
533000.00
17342759.30

metre^2
metre^2

14