This document provides a plan layout for the Walvis Bay 132/11 kV GIS substation. The layout shows the locations of key equipment rooms including the control room, 11kV switchgear room, and GIS equipment room. It also shows the locations of transformers, cable trenches for power and control cables, and other infrastructure elements. The drawing is sheet 2 of 7 for the substation equipment layout and was updated based on the latest supplier drawings.
This document provides a plan layout for the Walvis Bay 132/11 kV GIS substation. The layout shows the locations of key equipment rooms including the control room, 11kV switchgear room, and GIS equipment room. It also shows the locations of transformers, cable trenches for power and control cables, and other infrastructure elements. The drawing is sheet 2 of 7 for the substation equipment layout and was updated based on the latest supplier drawings.
This document provides a plan layout for the Walvis Bay 132/11 kV GIS substation. The layout shows the locations of key equipment rooms including the control room, 11kV switchgear room, and GIS equipment room. It also shows the locations of transformers, cable trenches for power and control cables, and other infrastructure elements. The drawing is sheet 2 of 7 for the substation equipment layout and was updated based on the latest supplier drawings.
This document provides a plan layout for the Walvis Bay 132/11 kV GIS substation. The layout shows the locations of key equipment rooms including the control room, 11kV switchgear room, and GIS equipment room. It also shows the locations of transformers, cable trenches for power and control cables, and other infrastructure elements. The drawing is sheet 2 of 7 for the substation equipment layout and was updated based on the latest supplier drawings.
GIS EQUIPMENT ROOM LOADING PLATFORM FRONT (FUTURE LINE ) TRFR - 5 (FUTURE LINE ) NEC/ NER/ AUX TRF-1 11kV POWER CABLE TRENCH PLAN LAYOUT KUISEB-2 KUISEB-1 1500 WIDE X 2000 DEPTH CONTROL CABLE TRENCH MH CONTROL CABLE TRENCH 7 LCC LCC LCC LCC LCC LCC LCC LCC LCC TRFR - 2 LOADING PLATFORM CONTROL CABLE TRENCH LOADING PLATFORM LOADING PLATFORM LOADING PLATFORM CP NEC/ NER-1 VACUUM SWITCH VACUUM SWITCH DOOR DOOR DOOR DOOR DOOR 600 WIDE X 900 DEPTH 600 WIDE X 900 DEPTH NEC/ NER-2 CP TRFR - 4 MH TRFR - 3 TRFR - 1 CP MH CP MH CP MH NEC/ NER/ AUX TRF-2 NEC/ NER/ AUX TRF-3 A1 SCALE: DEPARTMENT: PSS SHEET NO.: TOTAL SHEETS: APPROVED BY: PROJ ECT MANAGER: CHECKED BY: REV. REVISIONDESCRIPTION CHECKED: DATE: DRAWN: DATE: 3/7/2014 3:56PM DATE: DATE: DATE: Z Z Z - 7 6 4 - 0 0 2 _ O P T I O N
3 _ R E V
C . D W G 1 2 3 4 5 A B C C B A D 5 4 3 2 1 DWG.SIZE: REV.: DATE: PROJ ECTION: TITLE: TENDER NO.: DRAWING NO.: .............................................. .............................................. .............................................. POWER TRAFO GA UPDATED BASED ON LATEST SUPPLIER DRAWING. TVR SSV FIRST FLOOR SHOWN IN BUILDING BASED ON NAMPOWER REQUIREMENT. C TVR SSV BUND WALL FOR RADIATOR UPDATED B TVR SSV FIRST ISSUE A C 07.03.2014 2 01 1:100 ZZZ-764-002 NPWR/2013/40 EQUIPMENT LAYOUT - PLAN WALVIS BAY 132/11 kV GIS SUBSTATION