This document contains a list of rates for various construction materials, equipment, labour, and transportation. There are over 100 line items grouped into categories such as labour, tools, materials, equipment, and transportation. The rates provided are per unit such as per day, hour, cubic meter, etc. This rate sheet can be used to estimate costs for construction projects using these specified resources and labour.
This document contains a list of rates for various construction materials, equipment, labour, and transportation. There are over 100 line items grouped into categories such as labour, tools, materials, equipment, and transportation. The rates provided are per unit such as per day, hour, cubic meter, etc. This rate sheet can be used to estimate costs for construction projects using these specified resources and labour.
This document contains a list of rates for various construction materials, equipment, labour, and transportation. There are over 100 line items grouped into categories such as labour, tools, materials, equipment, and transportation. The rates provided are per unit such as per day, hour, cubic meter, etc. This rate sheet can be used to estimate costs for construction projects using these specified resources and labour.
Labour L-01 Labour USK D 800.00 L-02 Labour SSK D 900.00 L-03 Labour SK D 1,200.00 L-04 Bar bender D 1,200.00 L-05 Carpenter D 1,200.00 L-06 Welder D 1,200.00 Tools O-01 Allow for tools 2.50% O-02 Shoring Allow O-03 Labour space blocks 10% Materials M-01 Soil Type 1 CuM 477.03 M-02 Soil Type 2 CuM 477.03 M-03 Top Soil cum 400.00 M-04 Clay CuM 1,236.75 M-05 Sand CuM 4,240.28 M-06 Tor-Steel Mt 125,000.00 M-07 ABC CuM 1,837.46 M-08 19 mm Metal CuM 2,120.14 M-09 37.5 mm Metal CuM 1,943.46 M-10 Rubble CuM 1,060.07 M-11 Boulders CuM 908.13 M-12 Crushed stone - Backfill material CuM 1,943.46 M-13 Crushed stone filter material CuM 1,943.46 M-14 Granular material Cu.M 2,120.14 M-15 Metal 100mm Cu.M 1,766.78 M-16 Metal 50mm Cu.M 1,837.46 M-17 Porus Aggregate CuM 2,120.14 M-18 Rip-rap material 100-500 mm CuM 1,060.07 M-19 Graded aggregate Cu.M 2,120.14 M-20 Chocker stone 20mm Cu.M 2,120.14 M-21 Asphalt wearing 19mm/(mt) MT 10,300.00 M-22 Asphalt Binder MT 9,750.00 M-23 Baricade tapes kg 500.00 M-24 Bearing pads 150mm x 13mm L.m 2,000.00 M-25 Cement Bag 900.00 M-26 Cement (Bulk) MT 18,000.00 M-27 Bituminous Mastic Filler ltr 250.00 M-28 CRS-01 Ltr 122.00 M-29 MC 30 Ltr 126.50 M-30 Diesel Ltr 116.00 M-31 Petrol Ltr 150.00 M-32 LP Gas No 2,500.00 M-33 Kerosine Ltr 80.00 M-34 Fertilizer kg 75.00 M-35 Paint Item 500.00 M-36 1.5" dia 3mm thick round bar GI Nos 4,500.00 M-37 10mm dia 70mm MS rods l.m 250.00 M-38 12mm thick steel Lugs nos 70.00 M-39 25mm stainless Steel L.m 2,500.00 M-40 25mm milds Steel L.m 500.00 M-41 3/4" Box iron Bar Nos 1,750.00 M-42 4" dia 3mm thick round bar GI Nos 12,500.00 M-43 Acrojack No 3,800.00 M-44 AL end caps for 3/4" roud bar Nos 75.00 M-45 AL end caps for 4" roud bar Nos 750.00 M-46 Aluminioum Sheet 250mm l.m 125.00 M-47 Angle Iron 50x50x6 l.m 2,000.00 M-48 Binding wire kg 200.00 M-49 Cutting Weel Nos 1,500.00 M-50 Wire nails kg 200.00 M-51 Water Allow 100.00 M-52 15 mm thick plywood Sq.M 954.86 M-53 Class II timber joists etc ft 60.00 M-54 Explosive Sum 500.00 M-55 Gabion Box nr 4,250.00 M-56 Geo-Textile Sq.M 450.00 M-57 Polythene Displacer L.m 100.00 M-58 Bridge Kerb Nos 1,500.00 M-59 Pre-Cast Kerb K1 No 636.54 M-60 Pre-Cast kerb K2 No 636.54 M-61 Pre-Cast kerb K3/K4 No 636.54 M-62 Coupling No 446.43 M-63 Hand-Rails L.m 1,545.00 M-64 Up-righhs No 1,545.00 M-65 kilometer post nr 5,600.00 M-66 Con pipe 100mm dia L.m 1,500.00 M-67 Con pipe 150mm dia L.m 1,800.00 M-68 Conc. pipe 600mm dia L.m 10,000.00 M-69 Conc. pipe 900mm dia L.m 16,000.00 M-70 Conc. pipe 1200mm dia L.m 32,000.00 M-71 Pre-cast pre-stressed beam 5.20m No 29,870.00 M-72 Pre-cast pre-stressed beam 6.10m No 39,140.00 M-73 Pre-cast pre-stressed beam 7.01m No 42,745.00 M-74 Pre-cast pre-stressed beam 9.50m No 66,950.00 M-75 Pre-cast pre-stressed beam 10.7m No 65,920.00 M-76 Pre-cast pre-stressed beam 11.50m No 72,100.00 M-77 Pre-cast pre-stressed beam 13.50m No 87,550.00 M-78 Pre-cast pre-stressed beam 14.50m No 123,600.00 M-79 Pre-cast pre-stressed beam 19.00m No 178,190.00 M-80 Pre-cast pre-stressed beam 25.00m No 618,000.00 M-81 PVC 100 mm T600 L.m 533.33 M-82 PVC 75 mm T600 L.m 458.33 M-83 PVC pipe 110 mm dia. L.m 1,340.00 M-84 PVC pipe 150 mm dia. L.m 2,083.00 M-85 Reflecting Studs No 700.00 M-86 Road Marking Sq.M 1,500.00 M-87 Rubber sheet 12x75 l.m 400.00 M-88 Sign boards nos 4,000.00 M-89 Single pole, sign area up to 0.5m2 nr 9,500.00 M-90 Double pole, sign area up to 2.0m2 nr 19,000.00 M-91 Chevron warning sign nr 7,500.00 M-92 Welding rods kg 250.00 M-93 Safety helmets Jacket and Boots Kit 1,500.00 M-94 Night lamps nr 400.00 M-95 Traffic cones nr 1,450.00 M-96 Painted barrel nr 750.00 M-97 Bearing pads '75mm x 12mm l.m M-98 Concrete G 20 cu.M M-99 Excavation & Backfilling cu.M M-100 Form- Work Sq.M 2,106.00 M-101 PVC pipe 50 mm dia. L.m 185.00 M-102 Equipments E-01 Motor Grader Hr 3,928.00 E-02 Roller 10Ton Hr 3,660.00 E-03 Water Bowser 10000 ltr D 12,000.00 E-04 JCB Hr 2,100.00 E-05 6 wheel for day hire D 8,500.00 E-06 Roller 4Ton Hr 1,800.00 E-07 Tractor D 3,500.00 E-08 Compressor air CFM 175 D 7,600.00 E-09 Sprayer D 12,000.00 E-10 Pneumatic Roller Hr 2,522.00 E-11 Asphalt Paver Hr 6,772.00 E-12 Rammer D 2,000.00 E-13 Water pump D 4,210.00 E-14 Power Saw D 3,000.00 E-15 Concrete breaker D 3,500.00 E-16 EX 120 Hr 2,800.00 E-17 Concrete mixer D 5,856.00 E-18 Poker D 2,261.00 E-19 Bar Bending Machine & Cutter Mt 3,750.00 E-20 Roller 1-3Ton D 5,000.00 E-21 Welding plant D 3,500.00 E-22 Electric drill D 500.00 E-23 Generator D 4,500.00 E-24 Mobile Crane 20Ton Hr 5,500.00 E-25 Light Tower D 6,500.00 E-26 Steel Cutter D 2,000.00 E-27 Loader Hr 2,800.00 E-28 Generator for over haed - 25KVA Month 25,000.00 E-29 1 cube lorry D 6,000.00 E-30 D4 dozer Hr 3,500.00 E-31 Low bed Trailer km 500.00 E-32 Water bowser tractor mounted D 2,500.00 E-33 Ex 200 Hr 3,600.00 Transport T-01 Transport - Soil Type 1 CuM.km 14.13 T-02 Transport - Soil Type 2 CuM.Km 14.13 T-03 Transport - ABC CuM.km 14.13 T-04 Transport - Emulsion Drum 375.00 T-05 Transport - Sand CuM.km 14.13 T-06 Transport - Asphalt MT.km 10.00 T-07 Transport - Cement Bag 70.00 T-08 Transport - 37.5 mm Metal CuM.km 14.13 T-09 Transport - 19 mm Metal CuM.km 14.13 T-10 Transport - Tor-Steel Mt 2,500.00 T-11 Transport - Crushed stone - Backfill material CuM.km 14.13 T-12 Transport - Crushed stone filter material CuM.km 14.13 T-13 Transport - Conc. Pipe Nos 4,000.00 T-14 Transport - Rubble CuM.km 14.13 T-15 Transport - Precast Items Day 18,000.00 T-16 Transport - Beams sum 10,000.00 T-17 Transport - Top Soil Cu.M.km 14.13 T-18 Transport - Granular material Cu.M.km 14.13 T-19 Transport - Metal 100mm Cu.M.km 14.13 T-20 Transport - Metal 50mm CuM.km 14.13 T-21 Transport - Chocker stone 20mm CuM.km 14.13 T-22 Transport - Porus Aggregate CuM.km 14.13 T-23 Transport - Boulders CuM.km 14.13 T-24 Transport - Clay CuM.km 14.13 T-25 Transport - Graded aggregate CuM.km 14.13 Transport - Graded aggregate